Generator för en uttalande om säker arbetsmetod (SWMS)

Välj det högriskerade byggarbetet, ange varje steg med dess faror och kontroller och tryck ut ett SWMS-dokument för arbetarna att underteckna.

Körs i din webbläsare. Dina filer lämnar aldrig din enhet. Se hur du kontrollerar det

…

Så gör du

  1. 1
    Gå in på jobbet

    Skriv företag, plats, uppgift och handledare.

  2. 2
    Välj HRCW

    Vi plockar upp tre typer av högriskarbete.

  3. 3
    Lista steg

    Lägg till varje steg med dess fara, risker, kontroller och ansvar.

  4. 4
    Add PPE and review

    Type the PPE and how controls will be checked.

  5. 5
    Rådfråga och underteckna

    Gå igenom det med arbetarna och få dem att skriva på.

Om det här verktyget

Before high risk construction work starts, the business doing it must prepare a safe work method statement (SWMS). The model WHS Regulations list 18 kinds of high risk construction work, including work where someone could fall more than two metres, work near energised electrical services, work in trenches deeper than 1.5 metres, work disturbing asbestos, and work where powered mobile plant moves around. A SWMS must identify the high risk work, the hazards and risks, the control measures, and how the controls will be put in place, monitored and reviewed. It must be written in a way workers can understand, given to the principal contractor, kept on site and reviewed when the work changes. This generator builds a SWMS from your job steps: each with its hazard, a risk rating, the controls and who is responsible, plus PPE, monitoring and a sign-off table for workers.

Who this is for

Subcontractors, small builders, trade businesses and sole traders doing high risk construction work, and principal contractors checking SWMS from their trades.

The 18 kinds of high risk construction work

They include risk of a fall of more than 2 metres; work on telecommunication towers; demolition of load-bearing elements; disturbing asbestos; structural alterations needing temporary support; confined spaces; shafts or trenches deeper than 1.5 metres and tunnels; explosives; pressurised gas mains; chemical, fuel or refrigerant lines; energised electrical installations; contaminated or flammable atmospheres; tilt-up or precast concrete; work next to roads, railways or shipping lanes; areas with powered mobile plant; artificial extremes of temperature; water or liquid with a drowning risk; and diving work.

Writing the steps

Break the job into steps in the order they happen. For each, list: - the hazard (what could cause harm), - the risk before controls (high, medium, low), - the control measures, following the hierarchy: eliminate, substitute, isolate, engineering controls, administrative controls, then PPE, - who is responsible. Be specific to the site. "Use edge protection" is weaker than "edge protection on all open edges before roof access, checked by the supervisor each morning".

Consultation and sign-off

Go through the SWMS with workers before work starts, and have each worker sign. New workers sign when they arrive. Workers must be able to read and understand it, so consider translations or pictures.

Keeping and reviewing

Keep the SWMS on site until the work is finished and for two years if there is a notifiable incident. Review it when the work changes, after an incident, or when a control does not work. If work is not being done in line with the SWMS, it must stop until the SWMS is reviewed.

Worked example

A roofing crew replacing a metal roof on a two-storey house identifies falls from height and powered mobile plant (a crane). Steps cover scaffold and edge protection, removing old sheets, crane lifts with an exclusion zone, and fixing new sheets, each with controls and a responsible person.

Limits

A template, not a substitute for a site-specific risk assessment. Your state's WHS laws apply.

Lösta exempel

Ett tak som täcker SWMS-fall och en kranlyft, med fyra steg och arbetstagares avskärmning.

I korthet

Vanliga frågor

När krävs ett SWMS?

Innan någon av de 18 typerna av högriskarbete.

Vem förbereder SWMS?

Företaget som utför högriskarbete med sina arbetare.

Behöver det undertecknas?

Arbetarna bör skriva under för att visa att de har läst och förstått den.

Hur länge måste jag behålla den?

Tills arbetet är klart, och två år efter en anmälbar incident.

När måste den ses över?

När arbetet ändras, efter en incident eller när ett styrsystem inte fungerar.

Är mina data lagrade?

Bara i din webbläsare.

Helt gratisIngen avgift, ingen registrering
Filer förblir privataAllt körs i din webbläsare
Enkelt på ditt språkFinns på många språk