Générateur de devis et d'estimation pour les commerçants (Australie)
Entrez votre entreprise et votre permis, le client et le site, listez les travailleurs et les matériaux, choisissez un devis ou une estimation et votre état, puis imprimez-le ou enregistrez-le.
S'exécute dans votre navigateur. Vos fichiers ne quittent jamais votre appareil. Voir comment vérifier
…
Comment faire
- 1Entrez dans votre affaire.
ABN and licence.
- 2Entrez le client et le site
Qui et où.
- 3Liste des travailleurs et matériaux
Avec des prix.
- 4Choisissez une estimation
Et votre état.
- 5Imprimer ou envoyer
Gardez une copie.
À propos de cet outil
A clear quote wins work and avoids disputes. It should show your business name, ABN and licence number, the client and site, a description of the work, labour and materials with prices, GST, the total, any deposit and how long the quote is valid. A quote is usually a fixed price, while an estimate is a best guess that may change. For residential building work, states limit deposits: in NSW 10% of the price, and in Victoria and Queensland 10% for jobs under A$20,000 and 5% above. This generator produces a tidy quote or estimate.
Who this is for
Electricians, plumbers, carpenters, painters, handypeople and other tradespeople quoting residential and small commercial work.
Quote or estimate
A quote is a firm price for the work described, usually binding if accepted within its validity period. An estimate is an approximate price and should say that it may change and why. Under the Australian Consumer Law, misleading quotes or estimates can lead to penalties.
How to enter items
Labour: description, hours, hourly rate. Materials: description, quantity, unit price. Prices exclude GST; the generator adds 10%.
Deposits
Home building laws cap deposits. In NSW, a deposit for residential building work cannot exceed 10%. In Victoria and Queensland, the limit is 10% for contracts under A$20,000 and 5% for A$20,000 or more. Other states have their own rules. Larger jobs may also need a written contract and home warranty insurance.
A worked example
An electrician in Penrith quotes 17 hours of labour at A$95 and A$1,288 of materials for a kitchen and laundry rewire. The subtotal is A$2,903, GST is A$290.30 and the total A$3,193.30, with a 10% deposit of A$319.33.
Variations
If the scope changes, agree on the change and price in writing before doing the extra work.
Keep records
Keep copies of quotes, acceptances and variations with the job file.
## Written contracts for bigger jobs States require a written contract for residential building work above certain values, such as more than A$7,500 in NSW and more than A$10,000 in Victoria for domestic building work, with additional rules above higher thresholds. A quote can form part of the contract, but larger jobs need the full contract terms required by law.
Payment terms
State when payment is due, how to pay and whether progress payments apply. For larger jobs, link progress payments to completed stages rather than dates, and never ask for more than the deposit limit before work starts.
Questions tradies ask
Should I charge for quoting? Some trades charge a call-out or quoting fee for complex jobs; say so before visiting. How long should a quote be valid? Thirty days is common, as material prices change.
Limits
A template only, not legal advice. Check your state's contract rules for larger jobs.
Exemple concret
A rewire quote of A$2,903 plus GST totals A$3,193.30 with a A$319.33 deposit.
L'essentiel
- Catégorie: Documents
- Fonctionne dans votre navigateur, sans inscription, sans envoi.
- Ce que vous saisissez reste sur votre appareil.
- Disponible en anglais.
- Contenu révisé pour la dernière fois:
- Source officielle: NSW Fair Trading, home building contracts
Questions fréquentes
Qu'est-ce qui devrait être inclus dans une citation?
Your ABN and licence, client and site, work, prices, GST, total, deposit and validity.
Une citation est-elle obligatoire ?
Un devis est généralement un prix fixe s'il est accepté alors qu'il est valide.
How much deposit can I take in NSW?
Jusqu'à 10% pour les travaux de construction résidentielle.
Et pour ce qui est de Victoria et du Queensland ?
10% pour les moins de 20 000 A$ et 5% pour les plus de 20 000 a$.
Do prices include GST?
Enter prices excluding GST; the quote adds 10%.
Ma citation est sauvegardée ?
Imprimez ou sauvegardez-le vous-même.
