Calculateur de rémunération des prix du bâtiment et de la construction
Choisissez votre niveau de CW, secteur et métier, entrez les heures ordinaires, samedi et dimanche, et voyez le salaire hebdomadaire avec indemnités et les heures RDO que vous accumulez.
S'exécute dans votre navigateur. Vos fichiers ne quittent jamais votre appareil. Voir comment vérifier
…
Comment faire
- 1Choisissez votre niveau
CW/ECW de 1 à 8.
- 2Choisissez votre secteur
Générale ou résidentielle.
- 3Choisissez votre métier
Pour l'allocation d'outil.
- 4Entrez vos heures
Habituellement, samedi et dimanche.
- 5Lisez le total
Salaire, allocations et heures de RDO.
À propos de cet outil
The Building and Construction General On-site Award covers labourers, tradespeople and plant operators working on building sites. From 1 July 2026, the minimum hourly rate runs from A$27.20 for a CW/ECW 1 at level d to A$33.86 for CW/ECW 8, with A$29.45 for a qualified tradesperson at CW/ECW 3. Weekend work is overtime: Saturday is paid at 150% for the first two hours and 200% after that, and Sunday at 200%. Every employee gets an industry allowance each week, and tradespeople get a tool allowance. Full-time workers on a 38-hour week accrue rostered days off.
Who this is for
Carpenters, bricklayers, labourers, roof tilers, painters, plant operators and builders working out site wages.
CW levels
CW/ECW 1 has four entry steps for labourers. CW/ECW 2 covers more experienced labourers and some operators. CW/ECW 3 is a qualified tradesperson. Levels 4 to 8 cover tradespeople with extra skills, leading hands and advanced roles.
Industry allowance
The industry allowance compensates for the conditions of site work. From 1 July 2026 it is A$67.15 a week for general building and A$53.72 for residential work. It is paid for all purposes of the award, including leave.
Tool allowances
Tradespeople who supply their own tools get a weekly tool allowance: carpenters A$41.22, bricklayers A$29.26, roof tilers A$21.59 and painters A$9.89, among others.
Weekend overtime
Saturday work is paid at 150% for the first two hours and 200% after that. Sunday is 200% for all hours. Casuals add 25% to these rates.
Rostered days off
A full-time employee works 40 hours a week but is paid for 38, accruing 0.4 hours a day toward a rostered day off. Over a four-week cycle that is a paid 8-hour RDO.
Inclement weather
When work stops because of inclement weather, employees are paid for up to 32 hours in each four-week period. Enter hours lost to see how they are treated.
A worked example
A carpenter at CW/ECW 3 on general building working 38 ordinary hours and 4 hours on Saturday earns about A$1,119 for ordinary time, A$206 for Saturday, A$67.15 industry allowance and A$41.22 tool allowance, about A$1,434 before tax.
## Checking your classification Many labourers start at CW/ECW 1 and move to CW/ECW 2 once they gain skills such as operating machinery or working at heights with the right tickets. Tradespeople with extra qualifications or responsibility can move to CW/ECW 4 and above. If your duties have changed, ask your employer to review your classification in writing.
Weekday overtime
Work beyond eight hours on a weekday is overtime, paid at 150% for the first two hours and 200% after that. The calculator does not include weekday overtime, so add it separately if you work long days.
Superannuation and leave
Construction workers are entitled to super at 12% of ordinary time earnings, including the industry allowance. Many states also have portable long service leave schemes for the building industry, which follow you from employer to employer. Check that your employer is registered and paying contributions.
Limits
Indicative only, using published minimum rates; it is not legal advice. Many sites work under enterprise agreements with higher rates; use those if they apply.
Exemple concret
Un menuisier qui travaille 38 heures et 4 samedis gagne environ 1 434 dollars australiens par semaine, avec des allocations.
L'essentiel
- Catégorie: Entreprise et travail
- Fonctionne dans votre navigateur, sans inscription, sans envoi.
- Ce que vous saisissez reste sur votre appareil.
- Disponible en anglais.
- Contenu révisé pour la dernière fois:
- Source officielle: Fair Work Commission, Building and Construction General On-site Award MA000020
Questions fréquentes
Combien gagne un commerçant ?
Au moins 29,45 A$ l'heure au CW/ECW 3 à compter du 1er juillet 2026.
Comment est-ce que le samedi est payé ?
150% pour les deux premières heures, puis 200%.
Quelle est l'allocation de l'industrie ?
67,15 dollars par semaine pour les bâtiments généraux, 53,72 dollars pour les résidences.
Combien coûte l'allocation d'outil du menuisier ?
41,22 dollars par semaine.
Comment fonctionnent les RDO ?
Une semaine de 40 heures payée à 38 heures accumule 0,4 heure par jour pour un jour de repos.
Il y a quelque chose sauvegardé ?
Tous les calculs se font dans votre navigateur.
