Calculateur de marge du constructeur et de variation des prix
List each variation with its cost and approval status, set your margin, and see the variation prices, GST and the new contract total.
S'exécute dans votre navigateur. Vos fichiers ne quittent jamais votre appareil. Voir comment vérifier
…
Comment faire
- 1Entrez le contrat
Tapez le montant du contrat original.
- 2Définir la marge
Saisissez la marge pour les variations.
- 3Variations de la liste
Écrivez chacun comme numéro, description, coût et approuvé oui ou non.
- 4Lisez le registre
See prices, GST, status and the new contract sum.
- 5Je vous laisse .
Envoyer les modifications en attente au propriétaire pour approbation écrite.
À propos de cet outil
Variations are changes to the work in a building contract: an upgraded benchtop, extra power points, rock found during excavation, or an item the owner deletes. They are one of the main causes of disputes between builders and owners. Home building laws in every state require variations to be in writing, with a description and price, and agreed by the owner before the work is done, with limited exceptions. Builders usually add a margin to the cost of a variation to cover overheads and profit, often 15 to 25%, and then GST at 10%. This calculator prices each variation with your margin and GST, keeps a register showing which are approved and which are still pending, works out the adjusted contract sum, and shows how much the variations have changed the original price.
Who this is for
Builders, renovators and trade contractors who price variations, and home owners who want to check variation claims.
How a variation is priced
Variation price = cost of labour and materials × (1 + margin) + GST at 10%. For a credit, such as a deleted item, the cost is entered as a negative number and no margin is added, though contracts can say otherwise. Your contract may set the margin for variations; use that figure.
Entering variations
Write one variation per line: number, description, cost excluding GST and margin, and whether the owner has approved it (yes or no). For example, `V1, Upgrade benchtop to stone, 4200, yes`.
The register
The table shows each variation's cost, the price after margin, the GST and the total, with its status. The summary gives: - the original contract sum including GST, - approved variations, - the new contract sum, - pending variations still to be agreed, - the percentage change from the original price, - the margin earned on approved variations.
Getting variations right
- Put every variation in writing before the work, with a description, price and any change to the completion date. - Get the owner's signature or written approval. - Number variations and keep a running register. - Include variations in progress claims only once approved. Some states set rules for variations required by an authority or emergency, and some limit when a builder can claim for work done without a signed variation.
For owners
Ask for the cost breakdown and the margin used. Compare the price with what you would pay for the item separately. Check whether a variation also extends the completion date.
Worked example
On a A$385,000 contract including GST, with a 20% margin: an upgraded stone benchtop at A$4,200 cost, six extra power points at A$780 and a garden shed deleted for a A$2,400 credit add A$3,934 to the contract, a 1.0% increase. Rock excavation at A$6,500 cost (A$8,580 with margin and GST) is pending.
Limits
An estimate, not legal advice. Your contract terms and your state's home building laws decide how variations must be made and paid.
Exemple concret
Trois variantes approuvées ajoutent 3 934 dollars australiens à un contrat de 385 000 dollars; une autre d'une valeur de 8 580 dollars australien est en attente.
L'essentiel
- Catégorie: Entreprise et travail
- Fonctionne dans votre navigateur, sans inscription, sans envoi.
- Ce que vous saisissez reste sur votre appareil.
- Disponible en anglais.
- Contenu révisé pour la dernière fois:
- Source officielle: Home building laws in each state (for example Home Building Act 1989 NSW, Domestic Building Contracts Act 1995 Vic) require variations to be in writing and agreed before the work; GST at 10% applies to taxable supplies (A New Tax System (Goods and Services Tax) Act 1999)
Questions fréquentes
Comment les constructeurs font-ils varier les prix ?
Cost plus a margin, often 15 to 25%, plus GST.
Les variations doivent-elles être écrites?
Oui, les lois sur la construction de logements dans chaque État exigent des variations écrites dans la plupart des cas.
Is GST added to variations?
Oui, à 10% pour un constructeur enregistré.
Comment gérer les éléments supprimés ?
En tant que crédit, saisissez un coût négatif.
Un constructeur peut-il facturer des variations non signées ?
Souvent non, ou seulement dans de rares cas; vérifiez la loi de votre État.
Mes données sont-elles stockées ?
Seulement dans votre navigateur.