Student Group Project Planner

Plan a group assignment: tasks with owners and due dates on a board, hours logged per member, meeting minutes with actions and a peer evaluation that adjusts marks.

Tarayıcınızda çalışır. Dosyalarınız cihazınızdan asla çıkmaz. Nasıl kontrol edeceğinizi görün

…

Nasıl yapılır

  1. 1
    Set up the group

    Members, project parts, deadline and agreement.

  2. 2
    Split the work

    One task per owner with a due date and estimate.

  3. 3
    Log hours

    Update hours spent and move cards on the board.

  4. 4
    Keep minutes

    Who came, decisions and action points.

  5. 5
    Rate each other

    Four criteria from 1 to 5 at the end.

  6. 6
    Print the report

    Contribution, attendance and WebPA marks.

Bu araç hakkında

Group assignments go wrong in predictable ways: nobody owns the reference list, one person does the analysis at 2 a.m. the night before, a member stops coming to meetings and the peer evaluation at the end turns into guesswork. This planner gives the group a shared record from the first meeting to hand-in. In Settings you enter the project, the module, the deadline, the members, the parts of the project, the group mark once it is known and how much weight the peer assessment carries. The log holds three kinds of entry. Tasks have an owner, a part of the project, a due date, a status on the board, estimated hours and hours spent. Meetings record who came, what was decided and the action points. Peer ratings let each member score the others from 1 to 5 on contribution, reliability, quality of work and teamwork. From these the planner shows tasks done and overdue, hours still estimated against the days left, each member's share of the hours, meeting attendance and a WebPA score per member with the individual mark it produces. Insights flag blocked work, tasks without an owner and anyone carrying far more or far less than a fair share.

Board and deadlines

The board has five columns: to do, doing, review, done and blocked. Meetings and ratings stay off the board. Each task's due date, the hand-in deadline and a reminder two days earlier for final editing go to the Deadlines tab and can be exported to everyone's calendar.

How WebPA works

WebPA, developed at Loughborough University, turns peer ratings into a fair adjustment. Each rater's scores are divided by the total that rater gave, so a generous marker and a harsh marker carry the same weight. Each member's fractions are added up and scaled by the number of members divided by the number of raters, so an average contributor scores 1.00. The individual mark is the group mark times (1 − weight + weight × score), capped at 100. With a 50% weight, a score of 1.20 lifts a 68% group mark to 74.8%.

Evidence for the tutor

Print minutes for all meetings, the task list or the peer results from the Summary tab, or a contribution statement per member. The report export combines contribution, attendance, peer scores and the team agreement, and a blank peer evaluation form can be handed out on paper.

Worked example

Four students (Aisha, Ben, Chloe and Daniel) have 10 tasks and 3 are done, with 28.5 hours logged. Chloe logged 12.5 hours and Aisha 12, Ben 3 and Daniel 1, so Daniel holds 4% of the hours against a fair 25%, and he came to 1 of 3 meetings. Two tasks are overdue, one is blocked and the reference list has no owner. With a group mark of 68% and 50% peer weighting, the twelve ratings give WebPA scores of 1.17 for Aisha (73.6%), 1.00 for Ben (68%), 1.15 for Chloe (73%) and 0.69 for Daniel (57.4%).

Limits

Your module's own peer assessment rules always take precedence; some tutors use a different formula, include self-assessment or cap adjustments, so the marks here are not official. The planner does not sync between members by itself: one person keeps it and shares exports, or the group passes a JSON backup around.

Çözümlü örnek

10 tasks, 28.5 hours logged; WebPA at 68% group mark and 50% weight: Aisha 73.6%, Ben 68%, Chloe 73%, Daniel 57.4%.

Kısaca

Sık sorulan sorular

Who should keep the planner?

Usually the project coordinator. Others send updates in the group chat, and the coordinator shares the board, minutes and report exports after each meeting.

Should self-ratings count?

It depends on your module. Self-ratings are off by default; tick the setting to include them in the WebPA calculation.

What does a WebPA score of 1.00 mean?

That the group, on average, rated the member's contribution as equal to everyone else's. Above 1 is more, below 1 is less.

How are hours shared fairly?

The insights compare each member's share of logged hours with an equal share and suggest giving the next open tasks to those who have logged under half.

Can I record action points from meetings?

Yes. Write one per line as who, what and by when. They print in the minutes table.

Is my data shared with the university?

No. Nothing leaves your browser unless you export it and send it yourself.

Tamamen ücretsizÜcret yok, kayıt yok
Dosyalar gizli kalırHer şey tarayıcınızda çalışır
Kendi dilinizde kolayBirçok dilde mevcut