Staff Study and Decision Paper Builder

Enter the problem, facts and assumptions, weight your criteria, score each course of action 1-5, and get a ranked matrix and a signed decision line.

Działa w Twojej przeglądarce. Twoje pliki nigdy nie opuszczają urządzenia. Zobacz, jak to sprawdzić

…

Jak to zrobić

  1. 1
    State problem

    For, from, problem.

  2. 2
    List facts

    Facts and assumptions.

  3. 3
    Weight criteria

    Weights per criterion.

  4. 4
    Score options

    1-5 per criterion.

  5. 5
    Recommend

    Conclusion and decision.

O tym narzędziu

The Staff Study and Decision Paper Builder turns a messy staff problem into the numbered paper a commander expects to read. You fill in four parts: the problem with who it is for and from, the facts and assumptions, the criteria and courses of action, and the conclusion with a recommendation. The interesting part is the comparison. Give each criterion a weight, score every course of action from 1 to 5 on each criterion, and the builder multiplies and adds the scores into a weighted decision matrix, puts the leading option in bold and states which one scored highest. The paper is laid out as Problem, Facts, Assumptions, Courses of action, Comparison, Conclusion and Recommendation, with a decision line for approval and an optional list of annexes. Checks flag a course of action with the wrong number of scores, a study with only one option, or a recommendation that never says what to approve. Keep several studies, save versions, and print or download as Word or HTML. Everything stays in your browser.

Who this is for

Staff officers and NCOs who must recommend a decision in writing, students on staff and leadership courses learning the staff study format, and civilian staff in defence or emergency services who need a structured option comparison. It also works for any committee choice where several options are judged against weighted criteria.

How to use it

1. Open the Problem section and fill in who the study is for, who it is from, the date and a one-sentence problem statement. 2. List the facts one per line, then the assumptions you are making, also one per line. 3. Enter each criterion with a weight; larger weights mean the criterion matters more. 4. Add a row per course of action with a short name, a description and scores separated by commas in the same order as the criteria. 5. Read the decision matrix in the live preview and look for the bold row. 6. Write the conclusion and a recommendation phrased as something to approve, and adjust the approval line. 7. Tick or untick Annexes, save a version, then print, save as PDF or download as Word.

How the matrix is calculated

Each score is multiplied by its criterion's weight, and the products are added to give a weighted total. Scores are on a 1 to 5 scale where higher is always better, so for cost or risk you give the cheapest or safest option the highest score. The column headings show each weight, for example Cost (x3), so a reader can check the arithmetic. If two options tie, the one listed first is shown in bold.

The paper's structure

The preview numbers the paragraphs: 1. Problem, 2. Facts, 3. Assumptions, 4. Courses of action, 5. Comparison, 6. Conclusion and 7. Recommendation. The decision line at the end reads Approved / Disapproved / See me by default, followed by a space for a signature. An Annexes section can list supporting papers such as a cost breakdown or risk assessment; switch it off if you have none.

Checks before you submit

The builder counts the scores on each row and warns when they do not match the number of criteria, which is the most common reason a matrix gives an odd answer. It asks for at least two distinct courses of action, because a study with one option is not a comparison. It also looks for the word recommend or approve in the recommendation, nudging you to state a clear action rather than a vague preference.

Facts versus assumptions

Facts are things you can verify now, such as a budget figure or which dates are free. Assumptions are things you must treat as true to continue, such as the weather or transport being available. Keeping them apart lets the decision-maker see at once what would change the answer.

Limits

The matrix is only as good as the scores and weights you choose, and it cannot capture every judgement a commander will weigh. It does not create annexes, charts or sensitivity tests. The paper follows a simplified common format, not a specific regulation; the builder is a writing aid, not official guidance or professional advice. Use unclassified information only.

Przykład z rozwiązaniem

With weights of 4, 3, 2 and 1, the local training area scores 41 against 34 for postponing and 33 for the regional centre, so it is shown in bold as the highest weighted score.

W skrócie

Najczęstsze pytania

What is a staff study?

A written analysis of a problem that compares courses of action and recommends one for decision.

How are the scores combined?

Each 1-5 score is multiplied by the criterion weight and the results are added.

Should a low cost get a low score?

No, higher is better, so the cheapest option gets the highest cost score.

What if scores and criteria do not match?

A check names the course of action with the wrong number of scores.

Can I export to Word?

Yes, as a Word (.doc) file, or print and save as PDF.

Does the matrix make the decision?

No, it supports judgement; the commander decides.