Project Expense Tracker

Set budget lines by phase and category, log every expense with its receipt, and see what is spent, what is committed and where the project will overrun.

Działa w Twojej przeglądarce. Twoje pliki nigdy nie opuszczają urządzenia. Zobacz, jak to sprawdzić

…

Jak to zrobić

  1. 1
    Name the project

    On the Budget tab, enter the project, client, currency, contingency reserve and the warning level.

  2. 2
    Add budget lines

    Add one row per phase and category with its budget amount, or load the example to see the layout.

  3. 3
    Log expenses

    On the Expenses tab, add a row for each bill or order, pick the phase and category and set paid or committed.

  4. 4
    Attach receipts

    Tap the paperclip on a row to photograph a receipt or pick a PDF; tap the thumbnail to view it.

  5. 5
    Review the report

    Open Report to see alerts, budget versus actual per line, totals by phase or category and monthly spending.

  6. 6
    Share it

    Export CSV, save JSON, or print the cost report with receipts for a client or auditor.

O tym narzędziu

Most project budgets fail quietly. Invoices arrive weeks after the work, purchase orders sit in someone's inbox, and by the time the spreadsheet is updated the money is gone. This tracker keeps the three numbers a project manager needs side by side for every budget line: what was budgeted, what has been paid, and what is already committed through orders or signed quotes. Paid plus committed is the forecast at completion, and the gap between that forecast and the budget is the variance you can still act on. You set up budget lines as a phase and a category, such as Build and Materials or Fit-out and Furniture, each with an amount. Expenses are rows with a date, phase, category, vendor, description, amount, tax and a status of paid or committed. Tap the paperclip on any row to attach a photo of the receipt or a PDF invoice; on a phone the camera opens directly. Receipts are kept in this browser's storage, not uploaded, and can be printed at the end of the cost report for an audit or a client.

Budget versus actual

Each line shows budget, paid, committed, forecast, variance and a usage bar. The bar turns amber when a line reaches your warning level (85% by default) and red when the forecast passes the budget. Spending booked to a phase and category with no budget line appears as unbudgeted, which usually means either a missing line or a booking error. Totals can be grouped by phase or by category in a bar chart, and paid spending is shown month by month against the total budget as a cumulative line.

Contingency and baseline

Enter a contingency reserve and the tracker subtracts every line's overrun from it, so you can see how much reserve is really left. Save the current budget as a baseline before you approve a change, and the report shows the revision for each line next to the original figure.

Imports and exports

Import expenses from a bank or accounting export with headers such as date, phase, category, vendor, description, amount, tax and status; anything marked PO, order or pending becomes committed. Export every row as CSV, save the whole project as JSON to move it to another device, or print a cost report with or without receipt images.

Limits

This is a cost tracker, not an accounting system: it does not post journals, handle multiple currencies in one project or calculate tax. Receipts live in this browser only and are not inside the JSON file, so keep the originals too.

Przykład z rozwiązaniem

A fit-out project has six budget lines worth 55,000 in total and a contingency of 5,000. Paid expenses come to 32,520 and two orders are committed: finishing labour at 6,200 and desks at 8,900. The forecast is 47,620, leaving 7,380 unspent overall. Labour, though, is budgeted at 14,000 and already forecast at 14,800, so the line is red and 800 comes out of the contingency, leaving 4,200. Materials have used 16,770 of 18,000, which is 93%, so they show amber, as do consultants at 95% and furniture at 99%. None of the six paid expenses has a receipt attached yet, so the report adds a reminder.

W skrócie

Najczęstsze pytania

What is the difference between paid and committed?

Paid means the money has left the account. Committed means you have agreed to spend it, through a purchase order, a signed quote or a contract, but have not paid yet. Ignoring commitments is the most common reason project budgets look healthy until the last month.

Where are my receipt photos stored?

In this browser's IndexedDB storage on this device. They are not sent anywhere and are not inside the saved JSON file. If you clear site data or switch devices they will not follow, so keep the paper or emailed originals.

How is the forecast at completion worked out?

Forecast equals paid plus committed for each line. It does not guess future unordered work; if you expect more spending on a line, add a committed row for your estimate so the forecast reflects it.

What does unbudgeted mean?

An expense whose phase and category do not match any budget line. Either add a budget line for it or correct the booking. Unbudgeted spending still counts in the totals.

Can I track several projects?

One project is open at a time. Use Save JSON to keep each project as its own file and Open JSON to switch between them.

Does it include tax?

Each expense has a separate tax field, and totals include it. If you reclaim the tax, leave that field at zero so the tracker compares net costs with a net budget.

Całkowicie za darmoBez opłat i rejestracji
Pliki zostają prywatneWszystko działa w Twojej przeglądarce
Łatwo w Twoim językuDostępne w wielu językach