Process Capability Calculator (Cp, Cpk, Pp, Ppk)
Enter specification limits with the mean and standard deviations, or paste measurements, and get Cp, Cpk, Pp, Ppk, Cpm, expected defects in ppm and the sigma level.
Działa w Twojej przeglądarce. Twoje pliki nigdy nie opuszczają urządzenia. Zobacz, jak to sprawdzić
…
Jak to zrobić
- 1Choose the input
Summary statistics, data or shift.
- 2Enter the limits
USL, LSL and target.
- 3Add the statistics
Mean and both sigmas, or paste data.
- 4Read the indices
Cp, Cpk, Pp, Ppk and Cpm.
- 5Check ppm
Defects below and above the limits.
O tym narzędziu
A capability index compares the spread of a process with the width of its specification. Cp = (USL − LSL)/(6σ) says whether the process could fit inside the tolerance if it were centred; Cpk = min(USL − μ, μ − LSL)/(3σ) also accounts for how far the mean is off centre. Pp and Ppk use the overall standard deviation and describe long-term performance, while Cp and Cpk use the short-term, within-subgroup sigma. This calculator gives all four plus Cpm, which penalises distance from the target, and turns the result into expected parts per million below and above the limits using the normal distribution. You can enter summary statistics or paste raw data; with data, it estimates within sigma from the average moving range.
Who this is for
Quality engineers, Six Sigma practitioners, process and manufacturing engineers, suppliers preparing PPAP submissions and students.
The indices
- **Cp** = (USL − LSL)/(6σwithin): potential capability. - **Cpk** = min(USL − μ, μ − LSL)/(3σwithin): actual short-term capability. - **Pp** = (USL − LSL)/(6σoverall): potential long-term performance. - **Ppk** = min(USL − μ, μ − LSL)/(3σoverall): actual long-term performance. - **Cpm** = (USL − LSL)/(6·√(σ² + (μ − T)²)): capability around a target T.
Common targets
| Index | Meaning | |---|---| | Below 1.0 | Not capable: defects certain | | 1.0-1.33 | Marginal: tight control needed | | 1.33 | Usual minimum for existing processes (about 63 ppm) | | 1.67 | Common for new or safety-critical characteristics | | 2.0 | Six Sigma level (3.4 ppm with a 1.5σ shift) | Automotive customers under IATF 16949 commonly require Ppk ≥ 1.67 for initial studies and Cpk ≥ 1.33 in production.
Expected ppm
For a normal distribution, the fraction below the LSL is Φ((LSL − μ)/σ) and above the USL is 1 − Φ((USL − μ)/σ). A centred process with Cp = 1 produces 2,700 ppm; Cp = 1.33 about 63 ppm; Cp = 1.67 about 0.6 ppm.
Within and overall sigma
Within sigma comes from short-term variation, such as subgroup ranges (R̄/d2) or moving ranges (MR̄/1.128 for individuals). Overall sigma is the ordinary sample standard deviation of all data. If Pp is much lower than Cp, the process shifts between subgroups, and there is a special cause to find.
Worked example
USL 10.1, LSL 9.9, mean 10.01, within σ 0.02, overall σ 0.025: Cp = 1.67, Cpk = 1.50, Pp = 1.33, Ppk = 1.20, and about 165 ppm are expected out of tolerance, mostly above the USL.
Before you trust the numbers
- The process must be stable (in statistical control); check a control chart first. - The data should be roughly normal; skewed data need transformation or non-normal methods. - Use at least 25 subgroups or 100 individual values for a reliable estimate. - Measurement error inflates sigma; check gauge R&R first.
Limits
Normal distribution assumed. With pasted data, values are treated as individuals in production order. This is not professional advice.
Przykład z rozwiązaniem
USL 10.1, LSL 9.9, mean 10.01, σ 0.02 within and 0.025 overall: Cpk 1.50, Ppk 1.20.
W skrócie
- Kategoria: Inżynieria i budownictwo
- Działa w przeglądarce, bez rejestracji i wysyłania.
- Wpisane informacje zostają na Twoim urządzeniu.
- Dostępne po angielsku.
- Treść ostatnio sprawdzona:
- Oficjalne źródło: Process capability and performance indices (ISO 22514-2, AIAG Statistical Process Control Reference Manual); expected ppm from the normal distribution; within sigma from MR̄/d2
Najczęstsze pytania
What is the difference between Cpk and Ppk?
Cpk uses short-term within sigma; Ppk uses the overall long-term sigma.
What Cpk is good enough?
1.33 is a common minimum; 1.67 for new or critical processes.
How many ppm does Cpk 1.33 mean?
About 63 ppm for a centred process.
Why is my Cp high but Cpk low?
The process is off centre; move the mean towards the middle.
Does the data need to be normal?
Yes, for the ppm estimates; otherwise use a non-normal method.
Is my data stored?
No. The calculation runs in your browser.