Takt Time and Line Balancing Calculator
Turn available time and customer demand into takt, then assign tasks to stations that respect their order, see a yamazumi chart and test other demand levels.
Berjalan dalam pelayar anda. Fail anda tidak pernah meninggalkan peranti. Lihat cara menyemaknya
…
Cara melakukannya
- 1Set available time
Enter shift length, breaks and planned stops, and the number of shifts.
- 2Enter demand
Type the daily customer demand to get takt time in seconds.
- 3List the tasks
On Tasks, add each task with a code, a time in seconds and the codes it must follow.
- 4Fix warnings
Correct any missing codes, loops or tasks longer than takt that the check reports.
- 5Balance
On Stations, pick a rule or manual stations and read the yamazumi chart and measures.
- 6Test demand
Open Demand what-if, then print the line sheet or export the CSV.
Tentang alat ini
Takt time is the pace a line must keep to match customer demand: available production time divided by the units customers need. A line that builds slower than takt falls behind; a line with stations far below takt carries paid idle time. Line balancing is the job of grouping the work into stations so each one carries close to takt without breaking the order in which tasks must happen. This calculator does both. Enter the shift length, planned breaks and stops, number of shifts and daily demand to get takt in seconds. List the tasks with a code, a name, a normal time in seconds and the codes of tasks that must be finished first. The tool checks the list for missing predecessor codes, duplicate codes, loops and any task longer than takt, then balances the line with a choice of three classic rules: ranked positional weight, largest task first, or most followers. You can also switch to manual stations, starting from the automatic answer, and move tasks yourself while the tool warns about any task placed before its predecessor.
Results
The yamazumi chart stacks each station's tasks as coloured blocks against a dashed takt line, so overloaded and underloaded stations show at a glance. The table lists every station's tasks, load, idle time and load as a share of takt. Below it you get the cycle time (the slowest station), line efficiency (work content ÷ stations × takt), balance delay (the idle share), the smoothness index (0 means equal loads) and the theoretical minimum number of stations, which is work content ÷ takt rounded up.
Demand what-if
Demand rarely stays put. The what-if tab recalculates takt, the minimum stations and a full rebalance at 70% to 150% of current demand, and marks the levels the line cannot meet. When a single task is longer than takt, no grouping helps; the fix is a parallel station, another shift, or splitting the task.
Limits
Heuristics give good balances quickly but not always the mathematical optimum; try all three rules and a manual pass. Times should be standard times that already include allowances. The tool does not model walking, zoning constraints, mixed-model sequencing or learning curves.
Contoh berselesaian
A desk lamp line runs one 480-minute shift with 50 minutes of breaks, which leaves 25,800 seconds. Demand is 450 lamps a day, so takt is 57.3 seconds. Nine tasks add up to 248 seconds of work, so at least 5 stations are needed (248 ÷ 57.3 = 4.33). Ranked positional weight builds 6 stations: A and B (56 s), C (41 s), D and F (48 s), E (38 s), G and H (37 s) and I (28 s). The slowest station takes 56 s, inside takt, so the line can make 460 a day. Efficiency is 72% and balance delay 28%. At 30% more demand takt drops to 44.1 s and the line needs another rebalance.
Ringkasnya
- Kategori: Perniagaan & kerja
- Berjalan dalam pelayar, tanpa pendaftaran, tanpa muat naik.
- Maklumat yang anda masukkan kekal pada peranti anda.
- Tersedia dalam bahasa Inggeris.
- Kandungan disemak kali terakhir:
- Sumber rasmi: Lean Enterprise Institute: takt time and line balancing (Lean Lexicon)
Soalan lazim
How is takt time calculated?
Takt equals available production time divided by customer demand for the same period. Available time is shift time minus breaks, meetings and planned stops, multiplied by the number of shifts.
What is the difference between takt and cycle time?
Takt is the pace demand requires. Cycle time is the pace the line actually achieves, set by its slowest station. Cycle time must be at or below takt to meet demand.
Which balancing rule is best?
None wins every time. Ranked positional weight favours tasks with long chains after them and is a solid default. Try the other two and keep the result with the fewest stations and best smoothness.
What if a task is longer than takt?
It gets a station of its own and the line cannot meet demand. Split the task into smaller steps, add a parallel station that alternates units, or add capacity such as a second shift.
Can I set stations myself?
Yes. Choose Manual stations; the current automatic answer is copied into a Station column that you can edit, and any precedence break is listed as an error.
Should task times include allowances?
Use standard times that already include allowances for fatigue and small delays. Using raw observed times makes the line look more efficient than it will run.