Permit to Work Form Maker

Choose the permit type, fill the job details, confirm every hazard, control and gas test on site, get the sign-offs and print a one-page site permit.

Berjalan dalam pelayar anda. Fail anda tidak pernah meninggalkan peranti. Lihat cara menyemaknya

…

Cara melakukannya

  1. 1
    Choose the permit

    Hot work, height, confined space, electrical or excavation.

  2. 2
    Fill the header

    Number, location, work, times and people.

  3. 3
    Record tests

    Gas readings and isolation lock numbers.

  4. 4
    Confirm on site

    Mark each hazard and control with the receiver.

  5. 5
    Sign and display

    Print the site permit for the job board.

  6. 6
    Close the permit

    Confirm hand-back and file it.

Tentang alat ini

A permit to work is the written system that controls dangerous, non-routine jobs: welding near flammable materials, working on a roof, entering a tank, working on electrical equipment or digging near buried cables. It makes the person in charge of the area and the person doing the work agree, in writing and on site, what the hazards are, what controls are in place, who is working, how long the permit lasts and how the area is handed back. Many small sites and contractors either have no permit forms or use a photocopied sheet that nobody reads. This maker gives you editable permit templates for hot work, work at height, confined space entry, electrical isolation and lockout, excavation and general cold work. The header records the permit number, location and equipment, the description of work, the validity period, the issuer and receiver, the workers covered, the fire watch or attendant, gas test results, isolations with lock and tag numbers, linked permits and the emergency contact. Each template lists preparation checks, hazards, controls, personal protective equipment and gas tests, then closure and hand-back. Mark each item Confirmed, Not OK or N/A on site, rate problems by severity, add notes and photos, and print the signed report or a one-page permit for the job board.

The permit cycle

Prepare the permit before the job: describe the work, list the workers and attach the risk assessment. On site, the issuer and receiver walk the area together and confirm each hazard and control. Anything marked Not OK must be fixed before work starts, and the one-page site permit shows the permit as not valid while any item is open or not OK. The permit is displayed at the job, suspended if conditions change, extended in writing if needed, and closed only when the area is inspected and accepted back.

Hot work, height and confined space

The hot work template covers combustibles within 11 metres, gas testing for flammable atmospheres below 10% of the lower explosive limit, extinguishers, a named fire watch during work and for at least an hour after, and isolating detectors. Work at height covers avoiding height first, tagged scaffolds, edge protection, harness and anchor checks and a rescue plan. Confined space entry covers isolation by blanking, ventilation, atmosphere testing at three levels, continuous monitors, an attendant who never enters and a rescue team.

Electrical isolation and excavation

The lockout template follows identify, stop, isolate, lock with a personal lock per worker, tag, release stored energy and prove dead before touching, with re-energising steps at the end. Excavation covers service drawings, cable locator scans, hand digging near services, support for trenches deeper than 1.2 metres and safe access.

Worked example

Start a hot work permit, PTW-0001, for welding a pipe support in the boiler room from 08:00 to 17:00. The template creates 33 items in seven sections. Record the gas test as O2 20.9% and LEL 0% at 07:45, name the fire watch and mark each item Confirmed. While any item is open the site permit shows it as not valid; once every check is confirmed it shows all checks confirmed. After work, confirm the closure and the fire watch checks at 30 and 60 minutes, and the permit is ready to file.

Limits

These templates are a starting point, not a complete safety management system and not legal advice. They do not replace your site's permit procedure, a competent person's risk assessment or the law where you work. Gas limits and rules differ by country; check them.

Contoh berselesaian

Hot work permit PTW-0001: 33 items in 7 sections; site permit valid only when all are confirmed.

Ringkasnya

Soalan lazim

When is a permit to work needed?

For non-routine, high-risk work such as hot work, work at height, confined space entry, work on electrical systems and excavation near services, or whenever your site procedure requires one.

Who signs a permit?

The issuer, who controls the area, and the receiver, who leads the work, sign at issue and at closure. A safety officer may also sign on larger sites.

What gas readings are acceptable?

A common rule is oxygen 19.5–23.5%, flammable gas below 10% of the lower explosive limit, and toxic gases below their exposure limits. Use the limits in your site rules.

Can I change the templates?

Yes. Edit any template, add your site's items and save it. New permits start from your edited template.

Does it print a permit for the site board?

Yes. The one-page site permit shows the permit number, validity, people, gas tests, every check with its status and the sign-off table.

How long should permits be kept?

Keep closed permits for the period your procedure or regulator sets. Export or print each one before you clear it.

Percuma sepenuhnyaTiada bayaran, tiada pendaftaran
Fail kekal peribadiSemuanya berjalan dalam pelayar anda
Mudah dalam bahasa andaTersedia dalam banyak bahasa