Electrical Wiring and Plumbing Cost Estimator
Enter points and fixtures room by room with typical run lengths, set your labour rates, and get a material list and cost for wiring and plumbing.
Berjalan dalam pelayar anda. Fail anda tidak pernah meninggalkan peranti. Lihat cara menyemaknya
…
Cara melakukannya
- 1Add rooms
Create one row per room and give it a name.
- 2Count electrical points
On Electrical points, enter lights, fans, sockets, power and AC points, switchboards and the average run.
- 3Count fixtures
Switch to Plumbing fixtures and enter taps, WCs, basins, showers, sinks, drains and the supply run.
- 4Set factors
Open Wiring and pipe factors to set coil and conduit lengths, points per circuit and fittings per fixture.
- 5Enter prices
Type material prices and labour per point and per fixture on the Prices tab.
- 6Review and print
Check Circuits and runs, then print the material list or export the CSV.
Tentang alat ini
Electricians and plumbers in many countries price a house by the point: so much per light point, per socket and per fixture, plus materials. That makes a points count the fastest way to budget wiring and plumbing, and the best way to check a quote. This estimator takes a points list per room and turns it into the materials a contractor will buy, with labour per point or per fixture that you set. On the electrical side you enter lights, fans, ordinary sockets, heavy power sockets for kettles, ovens or water heaters, air-conditioner points and switchboards, plus the average cable run from each point. On the plumbing side you enter taps, WCs, basins, showers, sinks and floor drains, plus the average supply pipe run. The tool groups lighting and socket points into circuits using the limits you choose, gives each power and AC point its own circuit, adds the run from the distribution board to every circuit, and counts cable coils by size, conduit sticks, back boxes, breakers and board ways. Plumbing gives supply, waste and soil pipe lengths, fittings, valves and the fixtures themselves.
How the cable is counted
Every run carries three conductors: line, neutral and protective earth. Lighting and fan points use the smallest cable, general sockets the next size, and power and AC points the largest; the sample names 1.5, 2.5 and 4 square millimetre cable, which you can rename to AWG sizes. Cable metres are the point runs plus a home run per circuit, then rounded up to whole coils with the waste you set. Conduit follows the cable route, one stick per few metres.
Plumbing quantities
Each tap, basin, shower, sink and WC takes a supply run. Waste pipe of 40 to 50 mm serves basins, showers, sinks and floor drains, while each WC needs 100 to 110 mm soil pipe. Fittings per fixture and an isolation valve per outlet are rules of thumb that you can change.
Limits
This is a budgeting tool, not an electrical design. Cable sizes, breaker ratings, earthing, RCD protection and the number of circuits must be decided by a licensed electrician under your local wiring rules, and pipe sizing by a plumber. It does not include the incoming supply, meter, earthing pit, water tank, pump, hot water system or drainage outside the house.
Contoh berselesaian
A two-bedroom house: living room with 6 lights, a fan, 6 sockets and an AC point; two bedrooms with 3 lights, a fan and 4 sockets each, one with AC; a kitchen with 3 lights, 5 sockets, 3 power points, a sink and a tap; a bathroom with a WC, basin, shower, two taps and a drain; and an outside utility area. That is 52 electrical points and 12 plumbing fixtures. The tool forms 3 lighting circuits, 3 socket circuits and 7 dedicated circuits, 13 in all, on a 16-way board, and orders 9 coils each of the two small cables, 5 coils of 4 square millimetre cable and 215 conduit sticks. Plumbing needs about 46 metres of supply pipe, 36 metres of waste pipe and 108 fittings. At the sample rates the total is about $3,514 including 7 percent contingency.
Ringkasnya
- Kategori: Rumah & kehidupan
- Berjalan dalam pelayar, tanpa pendaftaran, tanpa muat naik.
- Maklumat yang anda masukkan kekal pada peranti anda.
- Tersedia dalam bahasa Inggeris.
- Kandungan disemak kali terakhir:
- Sumber rasmi: IEC 60364 low-voltage electrical installations; IS 732 wiring code; International Plumbing Code fixture approach
Soalan lazim
What counts as one point?
One outlet a contractor wires: a light, a fan, a socket or a dedicated appliance outlet. Switches are part of the switchboard and are not counted as separate points here.
How long is an average cable run?
For a typical room, 6 to 10 metres from the switchboard or junction to the outlet. Long corridors, outdoor lights and upper floors need more, so set the run for each room.
How many points go on one circuit?
Rules vary. Many codes allow around 10 lighting points or 8 socket outlets per final circuit, while heavy appliances and AC units get a circuit each. Set the limits your electrician uses.
Why does the board have more ways than circuits?
Two extra ways are kept for the main switch and residual current device, and the board is rounded up to a common 4-way step. Spare ways for future circuits are a good idea.
Can I use this for one room or a renovation?
Yes. Add only the rooms being rewired or re-plumbed and set the labour rates for renovation work, which are often higher than for new construction.
Does anything leave my computer?
Nothing is uploaded. Points, prices and scenarios are kept in local browser storage, and exports are created on your device.