Construction Labour Attendance and Wage Book

One line per worker per day: present, half day or absent, overtime and any advance. Weekly pay sheets, balances owed and the labour cost of each site follow.

Berjalan dalam pelayar anda. Fail anda tidak pernah meninggalkan peranti. Lihat cara menyemaknya

…

Cara melakukannya

  1. 1
    List workers

    Name, trade and day rate, one per line in Settings.

  2. 2
    List sites

    One site per line, and the pay-week start day.

  3. 3
    Mark the day

    Attendance, overtime and any advance per worker.

  4. 4
    Record payments

    Enter wages paid on pay day.

  5. 5
    Print the week

    Weekly wage sheet with balances and signatures.

  6. 6
    Review sites

    Site summaries with man-days and cost by trade.

Tentang alat ini

On a building site the labour contractor or the owner's supervisor keeps a hazira khata: who came today, who left at lunch, who stayed late for the roof casting, and how much advance (khoraki) each worker took for food during the week. On pay day these scribbles become wages, and arguments start when the numbers do not match a worker's own memory. This wage book replaces the notebook with a clear daily record. List your workers with their trade, such as mason, helper, rod binder or carpenter, and their day rate, and list your sites. For each day add a line per worker with attendance, overtime hours and any advance or wage paid, plus a note of the work done. The day's earning is the day rate times one for present or a half for a half day, plus overtime at the hourly rate times your overtime factor. The tool groups the lines into pay weeks starting on the day you choose, and prints a weekly wage sheet with days, overtime, earnings, advances, payments and the balance owed to each worker, with a column for a signature or thumb impression. Worker ledgers show a running balance, and site summaries show man-days and labour cost by trade.

Daily marking

Choose the worker and site, set Present, Half day, Absent or Leave, and enter overtime hours if any. A different day rate can be entered for one day, for example when a helper does mason's work. Advances and wages paid on that day go in the same line, so everything about a worker's day sits together. The calendar view shades each day by attendance, and the muster roll export prints the current week as a grid of P, ½, A and L.

Pay day

Open the Pay weeks group and print the week's wage sheet. Each worker's balance is earnings minus advances minus payments for that week. Overall balances carry across weeks: if a worker took more in advances than he earned, the insight points it out so it can be recovered or the advances stopped. Each payment line can be printed as a voucher with the amount in words, the days worked to date and the balance after, to be signed or thumbed by the worker.

Site costing

Every line carries its site, so a contractor running two jobs sees man-days, cost and the average cost of a man-day for each. The site summary also splits man-days by trade. The helper-to-mason ratio is a quick check on gang balance for brickwork and plaster.

Worked example

Load the sample week. Karim Mia, a mason at ৳900 a day, worked 5.5 days and 4 hours of overtime. His hourly rate is ৳900 ÷ 8 = ৳112.50 and overtime at 1.5 times is ৳168.75 an hour, so he earned ৳4,950 + ৳675 = ৳5,625. He took a ৳500 advance and was paid ৳3,500 on Friday, so ৳1,625 is still owed. Motin, a rod binder, earned ৳3,200 for 4 days but took ৳3,500 in advances, ৳300 more than earned. The Uttara site used 21.5 man-days costing ৳16,812.50.

Limits

This is a simple site register, not a full payroll or a statutory form. Registration, welfare cess, minimum wages, overtime rates and the format of muster rolls are set by law in each country and state; check the rules that apply to your site. The data stays in this browser, so export a backup file each week.

Contoh berselesaian

5.5 days at ৳900 plus 4 overtime hours at ৳168.75 is ৳5,625; after ৳4,000 paid, ৳1,625 is owed.

Ringkasnya

Soalan lazim

How is overtime paid?

Hourly rate is the day rate divided by the hours in a full day, times your overtime factor in Settings. Many sites use 1.5; some pay the plain hourly rate.

Can I run several sites?

Yes. List the sites in Settings and choose one on each line. The site summary shows man-days and cost for each.

What day does the pay week start?

You choose. Saturday suits sites in Bangladesh where pay day is Friday; pick Monday or Sunday elsewhere.

How are advances recovered?

Advances reduce the worker's balance. If they exceed earnings, the shortfall shows as a negative balance and an insight reminds you.

Can workers sign for payment?

Print the weekly wage sheet or a payment voucher; both have a column or line for a signature or thumb impression.

Is attendance data uploaded?

No. Everything stays in this browser. Export the CSV or a backup file to share with the owner.