Margin Pembina dan Kalkulator Harga Perubahan

Senaraikan setiap variasi dengan kos dan status kelulusan, tetapkan margin anda, dan lihat harga perubahan, GST dan jumlah kontrak baru.

Berjalan dalam pelayar anda. Fail anda tidak pernah meninggalkan peranti. Lihat cara menyemaknya

…

Cara melakukannya

  1. 1
    Masukkan kontrak

    Ketik jumlah kontrak asal.

  2. 2
    Tetapkan margin

    Ketik margin untuk variasi.

  3. 3
    Perubahan senarai

    Tulis setiap sebagai nombor, penerangan, kos dan diluluskan ya atau tidak.

  4. 4
    Baca buku pendaftaran

    Lihat harga, GST, status dan jumlah kontrak baru.

  5. 5
    Dapatkan tanda keluar

    Hantarkan perubahan yang menunggu kepada pemilik untuk kelulusan bertulis.

Tentang alat ini

Variations are changes to the work in a building contract: an upgraded benchtop, extra power points, rock found during excavation, or an item the owner deletes. They are one of the main causes of disputes between builders and owners. Home building laws in every state require variations to be in writing, with a description and price, and agreed by the owner before the work is done, with limited exceptions. Builders usually add a margin to the cost of a variation to cover overheads and profit, often 15 to 25%, and then GST at 10%. This calculator prices each variation with your margin and GST, keeps a register showing which are approved and which are still pending, works out the adjusted contract sum, and shows how much the variations have changed the original price.

Who this is for

Builders, renovators and trade contractors who price variations, and home owners who want to check variation claims.

How a variation is priced

Variation price = cost of labour and materials × (1 + margin) + GST at 10%. For a credit, such as a deleted item, the cost is entered as a negative number and no margin is added, though contracts can say otherwise. Your contract may set the margin for variations; use that figure.

Entering variations

Write one variation per line: number, description, cost excluding GST and margin, and whether the owner has approved it (yes or no). For example, `V1, Upgrade benchtop to stone, 4200, yes`.

The register

The table shows each variation's cost, the price after margin, the GST and the total, with its status. The summary gives: - the original contract sum including GST, - approved variations, - the new contract sum, - pending variations still to be agreed, - the percentage change from the original price, - the margin earned on approved variations.

Getting variations right

- Put every variation in writing before the work, with a description, price and any change to the completion date. - Get the owner's signature or written approval. - Number variations and keep a running register. - Include variations in progress claims only once approved. Some states set rules for variations required by an authority or emergency, and some limit when a builder can claim for work done without a signed variation.

For owners

Ask for the cost breakdown and the margin used. Compare the price with what you would pay for the item separately. Check whether a variation also extends the completion date.

Worked example

On a A$385,000 contract including GST, with a 20% margin: an upgraded stone benchtop at A$4,200 cost, six extra power points at A$780 and a garden shed deleted for a A$2,400 credit add A$3,934 to the contract, a 1.0% increase. Rock excavation at A$6,500 cost (A$8,580 with margin and GST) is pending.

Limits

An estimate, not legal advice. Your contract terms and your state's home building laws decide how variations must be made and paid.

Contoh berselesaian

Tiga variasi yang diluluskan menambah A $ 3,934 kepada kontrak A $ 385,000; satu bernilai A $ 8,580 sedang menunggu.

Ringkasnya

Soalan lazim

Bagaimana pembina membuat perbezaan harga?

Kos ditambah margin, sering 15 hingga 25%, ditambah GST.

Adakah perubahan perlu ditulis?

Ya, undang-undang bangunan rumah di setiap negeri memerlukan variasi bertulis dalam kebanyakan kes.

Adakah GST ditambah kepada variasi?

Ya, 10% untuk pembina berdaftar.

Bagaimana item yang dipadamkan ditangani?

Sebagai kredit; masukkan kos negatif.

Bolehkah pembina mengenakan bayaran untuk perubahan yang tidak ditandatangani?

Selalunya tidak, atau hanya dalam kes yang terhad; periksa undang-undang negeri anda.

Adakah data saya disimpan?

Hanya dalam pelayar anda.

Percuma sepenuhnyaTiada bayaran, tiada pendaftaran
Fail kekal peribadiSemuanya berjalan dalam pelayar anda
Mudah dalam bahasa andaTersedia dalam banyak bahasa