Bill of Quantities (BOQ) Maker

List BOQ items by section with unit, quantity and rate; get section totals, an abstract of cost with contingency and tax, and export to Excel or PDF.

Berjalan dalam pelayar anda. Fail anda tidak pernah meninggalkan peranti. Lihat cara menyemaknya

…

Cara melakukannya

  1. 1
    Set up the project

    Name, client, sections, tax and rounding.

  2. 2
    Add items

    Section, number, description, unit, quantity, rate.

  3. 3
    Check totals

    Watch section totals and the grand total.

  4. 4
    Review insights

    Costliest items, lump sums and gaps.

  5. 5
    Print the abstract

    Section totals with contingency and tax.

  6. 6
    Export

    Excel with formulas, PDF or a tender copy.

Tentang alat ini

A bill of quantities lists every item of work in a building or civil project with its unit, quantity, rate and amount, grouped by trade or section. Engineers use it to estimate a project, owners use it to invite tenders on equal terms, and contractors price it to bid. Many small firms still build BOQs in spreadsheets that break when a row is inserted, or by hand. This maker keeps each item as a structured entry: section, item number, a full description of the work, unit, quantity, rate, a reference to the specification or schedule of rates, and remarks. Amounts are calculated as you type. Items sort by section and number, section totals appear in the groups view, and the abstract of cost lists every section with its amount and share of the total. Below it, contingencies, contractor's overhead and profit and tax such as GST are added in order, and the grand total is rounded to the step you choose. With a built-up area set, the cost per square metre or square foot is shown too. Insights point to the costliest items, the largest section, lump-sum items that hide quantities, missing item numbers and duplicate descriptions. Exports give a printable BOQ, an abstract, an Excel file with live formulas and a blank copy for bidders.

Writing good items

A good BOQ description says what the work is, where it is, the material, mix or grade and what the rate includes, such as formwork, lead and lift or finishing. Keep units consistent with how the work is measured: cubic metres for earthwork and concrete, square metres for plaster, tiles and paint, kilograms or tonnes for steel, numbers for doors and fittings, and lump sum only where measuring is not practical.

Abstract of cost and totals

The abstract adds the sections. Contingencies are a percentage of the section total; overhead and profit is a percentage of the total plus contingencies, for use when rates are bare costs; tax is applied on top. The grand total is rounded, and the rounding difference is shown, so the printed figures always add up.

Excel and tender copies

The Excel export is a spreadsheet file that opens in Excel or LibreOffice with a Qty × Rate formula on every row, section subtotal formulas and the totals block, so it stays live if a quantity changes. The tender copy keeps quantities but leaves rates and amounts blank for bidders. For a PDF, open the full BOQ and print it to PDF.

Worked example

Load the sample: a two-storey residence with 15 items in nine sections. Concrete work is the largest section at ₹927,300, 39% of the total of ₹2,376,150. Contingencies of 3% add ₹71,284.50 and GST at 18% adds ₹440,538.21, giving a grand total rounded to ₹2,888,000, or ₹20,628.57 per sqm over 140 sqm. The three costliest items, brickwork, reinforcement steel and RCC footings and columns, make up 42.2% of the cost.

Limits

This is a tool for preparing and pricing a BOQ, not a quantity take-off from drawings and not a substitute for a qualified estimator. The sample rates are examples only and do not represent any official schedule of rates. Tax treatment of works contracts varies; check it for your project.

Contoh berselesaian

Sample: sections ₹2,376,150 + 3% contingency ₹71,284.50 + 18% GST ₹440,538.21 = ₹2,888,000 (rounded).

Ringkasnya

Soalan lazim

What is the difference between a BOQ and an estimate?

An estimate can be a single figure or a rough area rate. A BOQ lists every item with a measured quantity and rate, so it can be priced by bidders and used to pay for measured work.

Can I export to Excel?

Yes. The Excel export opens with formulas for every amount, section subtotals and the totals, so it recalculates when you change a quantity or rate.

How do I make a PDF?

Export the full BOQ as a web page and print it to PDF from your browser, or print section bills from the groups view.

Where do I set the sections?

In Settings, one section per line in the order they should appear. The order also numbers the sections in the abstract.

Should rates include overhead and profit?

Schedule of rates items usually include them. If you enter bare material and labour costs, set an overhead and profit percentage instead.

Can I send a blank BOQ to contractors?

Yes. The tender copy has the descriptions, units and quantities with empty rate and amount columns for bidders to fill.

Percuma sepenuhnyaTiada bayaran, tiada pendaftaran
Fail kekal peribadiSemuanya berjalan dalam pelayar anda
Mudah dalam bahasa andaTersedia dalam banyak bahasa