Maintenance Shift Turnover Log

One entry per unfinished job at the end of a shift, with the last step done, parts awaited and hazards, shown on a status board and printed as a signed handover sheet.

브라우저에서 실행됩니다. 파일은 기기 밖으로 나가지 않습니다. 확인하는 방법 보기

…

사용 방법

  1. 1
    Set tails

    List your aircraft.

  2. 2
    Add jobs

    One entry per open job.

  3. 3
    Record stage

    Last step actually done.

  4. 4
    Note hazards

    Panels, jacks, power.

  5. 5
    Hand over

    Print and sign the sheet.

이 도구 소개

The Maintenance Shift Turnover Log is built around the moment when one team hands a half-finished job to the next. For each job still open at the end of a shift you record the date and shift, the tail number and the job or task card, and pick a status: Open, In work, Parts awaited, Awaiting inspection or Complete. The most important box asks where the job was left, meaning the last step actually done, so the incoming technician does not repeat a step or, worse, skip one. When a job is waiting for parts, a field appears for the part number, quantity and expected arrival. You also note the aircraft's status, any hazards such as open panels, aircraft on jacks, or hydraulic or electrical power applied, and the names of the person handing over and the person taking over. A board groups jobs by status, counters show what is still in work, waiting for parts or waiting for inspection, and the summary prints one turnover sheet per shift with signature lines for both sides. It is a personal and training record, not an approved handover system or a replacement for the task card.

Who this is for

Line and base maintenance technicians handing over between day, late and night shifts, supervisors who chair the handover meeting, apprentices learning what a good handover contains, and human factors instructors who want a realistic exercise built on a known accident pattern.

How to use it

1. List your tail numbers in Settings; the defaults are G-ABCD, G-EFGH and ZZ123. 2. Press Load example to see a main wheel change awaiting inspection and a nose tyre change waiting for a tyre. 3. Add one entry per open job: shift date, shift (Day, Swing / late or Night), tail and the job or task card number. 4. Pick the job status, which defaults to In work. 5. In Where it was left, write the last step completed, not the next step planned. 6. Fill in parts awaited if the status is Parts awaited, then the aircraft status and the hazards. 7. Add both names, then print the turnover sheet from the Summary tab and sign it face to face.

What a useful handover says

Write the exact stage, for example wheel fitted, axle nut torqued, cotter pin not yet fitted, rather than nearly done. State any configuration the next shift must know before touching the aircraft: panels off, circuit breakers pulled, controls disconnected, jacks or trestles in place. Say which steps still need an independent inspection. A spoken handover at the aircraft, backed by the written sheet, catches more than either one alone, and the incoming technician should read back the stage before starting.

The sheet and the board

Each turnover sheet is grouped by date and shift and lists tail, aircraft status, job, status, where it was left, parts and hazards, followed by lines to sign as handed over by and taken over by. The Board tab shows jobs in columns by status with the shift, date and any parts awaited under each card, which is handy on a hangar screen during the briefing. Counters show total jobs, open or in work, parts awaited and awaiting inspection.

Aircraft status options

Choose Serviceable, Unserviceable, In inspection or Restricted. Keeping the aircraft status on every job line means a supervisor can see at a glance which aircraft are tied up by unfinished work.

Keeping the records

Entries are stored on this device in your browser. Export CSV, print a report of the filtered list, or save a JSON backup to start a fresh log for each week or each project.

Why handovers go wrong

Incident reviews keep finding the same pattern: a job stopped part way, a verbal handover that never happened or was cut short, and a task card that did not show which steps were done. Writing the stage in plain words, naming both people and signing the sheet together closes most of those gaps.

Limits

Nothing stops a job being marked Complete without an inspection, and the log does not link to task cards, stores or planning systems. It is a handover aid and practice record, not safety or engineering advice; the task card, the approved maintenance data and your organisation's handover procedure remain the controlling documents, and incomplete work must be recorded where the procedure says.

풀이 예시

The sample day shift hands over 2 jobs on G-ABCD and G-EFGH: 1 awaiting inspection with the aircraft on jacks and 1 waiting for a 5.00-5 tyre due at 09:00.

한눈에 보기

자주 묻는 질문

What should go in Where it was left?

The last step actually completed, written exactly, so the next shift knows where to start.

When does the parts field appear?

Only when the job status is Parts awaited.

Can I print a handover sheet?

Yes, the Summary tab prints one sheet per date and shift with two signature lines.

Which shifts are listed?

Day, Swing / late and Night.

Does it replace the task card?

No, the task card and the organisation's procedure control the job.

Where is the data kept?

In this browser only; export a CSV or JSON backup to keep a copy.