건설자 마진 및 변동 가격 계산기
각 변형을 비용과 승인 상태와 함께 목록, 당신의 마진을 설정하고 변경 가격, GST 및 새로운 계약 총을 참조하십시오.
브라우저에서 실행됩니다. 파일은 기기 밖으로 나가지 않습니다. 확인하는 방법 보기
…
사용 방법
- 1계약서를 입력합니다
원래 계약 금액을 입력하세요.
- 2마진을 설정합니다
변동에 대한 마진을 입력합니다.
- 3목록 변경
각각 번호, 설명, 비용과 승인된 예 또는 아니오로 적어주세요.
- 4레지스트를 읽어봐
가격, GST, 상태 및 새로운 계약 금액 참조.
- 5서명을 받아
작성된 승인을 위해 소유자에게 미결 변경 사항을 보내십시오.
이 도구 소개
Variations are changes to the work in a building contract: an upgraded benchtop, extra power points, rock found during excavation, or an item the owner deletes. They are one of the main causes of disputes between builders and owners. Home building laws in every state require variations to be in writing, with a description and price, and agreed by the owner before the work is done, with limited exceptions. Builders usually add a margin to the cost of a variation to cover overheads and profit, often 15 to 25%, and then GST at 10%. This calculator prices each variation with your margin and GST, keeps a register showing which are approved and which are still pending, works out the adjusted contract sum, and shows how much the variations have changed the original price.
Who this is for
Builders, renovators and trade contractors who price variations, and home owners who want to check variation claims.
How a variation is priced
Variation price = cost of labour and materials × (1 + margin) + GST at 10%. For a credit, such as a deleted item, the cost is entered as a negative number and no margin is added, though contracts can say otherwise. Your contract may set the margin for variations; use that figure.
Entering variations
Write one variation per line: number, description, cost excluding GST and margin, and whether the owner has approved it (yes or no). For example, `V1, Upgrade benchtop to stone, 4200, yes`.
The register
The table shows each variation's cost, the price after margin, the GST and the total, with its status. The summary gives: - the original contract sum including GST, - approved variations, - the new contract sum, - pending variations still to be agreed, - the percentage change from the original price, - the margin earned on approved variations.
Getting variations right
- Put every variation in writing before the work, with a description, price and any change to the completion date. - Get the owner's signature or written approval. - Number variations and keep a running register. - Include variations in progress claims only once approved. Some states set rules for variations required by an authority or emergency, and some limit when a builder can claim for work done without a signed variation.
For owners
Ask for the cost breakdown and the margin used. Compare the price with what you would pay for the item separately. Check whether a variation also extends the completion date.
Worked example
On a A$385,000 contract including GST, with a 20% margin: an upgraded stone benchtop at A$4,200 cost, six extra power points at A$780 and a garden shed deleted for a A$2,400 credit add A$3,934 to the contract, a 1.0% increase. Rock excavation at A$6,500 cost (A$8,580 with margin and GST) is pending.
Limits
An estimate, not legal advice. Your contract terms and your state's home building laws decide how variations must be made and paid.
풀이 예시
승인 된 세 가지 변형은 A$385,000 계약에 A$3,934을 추가합니다. 8,580 달러의 계약이 미뤄지고 있습니다.
한눈에 보기
- 카테고리: 비즈니스 및 업무
- 브라우저에서 실행되며 가입도 업로드도 필요 없습니다.
- 입력한 정보는 기기에 머뭅니다.
- 영어로 제공됩니다.
- 콘텐츠 최종 검토일:
- 공식 출처: Home building laws in each state (for example Home Building Act 1989 NSW, Domestic Building Contracts Act 1995 Vic) require variations to be in writing and agreed before the work; GST at 10% applies to taxable supplies (A New Tax System (Goods and Services Tax) Act 1999)
자주 묻는 질문
건설업자들은 어떻게 가격 차이를 만들까요?
Cost plus a margin, often 15 to 25%, plus GST.
변경 사항은 반드시 서면으로 해야 합니까?
네, 모든 주의 주택 건설법은 대부분의 경우 서면으로 변경을 요구합니다.
GST가 변동에 추가되는가요?
네, 등록된 건설업자에게는 10%입니다.
삭제된 항목은 어떻게 처리됩니까?
신용으로, 음값을 입력합니다.
건설업자는 서명되지 않은 변동에 대해 요금을 청구 할 수 있습니까?
종종 그렇지 않거나 제한된 경우에만; 주의 법을 확인하세요.
내 데이터가 저장되어 있나요?
네 브라우저에서만