건설자 마진 및 변동 가격 계산기

각 변형을 비용과 승인 상태와 함께 목록, 당신의 마진을 설정하고 변경 가격, GST 및 새로운 계약 총을 참조하십시오.

브라우저에서 실행됩니다. 파일은 기기 밖으로 나가지 않습니다. 확인하는 방법 보기

…

사용 방법

  1. 1
    계약서를 입력합니다

    원래 계약 금액을 입력하세요.

  2. 2
    마진을 설정합니다

    변동에 대한 마진을 입력합니다.

  3. 3
    목록 변경

    각각 번호, 설명, 비용과 승인된 예 또는 아니오로 적어주세요.

  4. 4
    레지스트를 읽어봐

    가격, GST, 상태 및 새로운 계약 금액 참조.

  5. 5
    서명을 받아

    작성된 승인을 위해 소유자에게 미결 변경 사항을 보내십시오.

이 도구 소개

Variations are changes to the work in a building contract: an upgraded benchtop, extra power points, rock found during excavation, or an item the owner deletes. They are one of the main causes of disputes between builders and owners. Home building laws in every state require variations to be in writing, with a description and price, and agreed by the owner before the work is done, with limited exceptions. Builders usually add a margin to the cost of a variation to cover overheads and profit, often 15 to 25%, and then GST at 10%. This calculator prices each variation with your margin and GST, keeps a register showing which are approved and which are still pending, works out the adjusted contract sum, and shows how much the variations have changed the original price.

Who this is for

Builders, renovators and trade contractors who price variations, and home owners who want to check variation claims.

How a variation is priced

Variation price = cost of labour and materials × (1 + margin) + GST at 10%. For a credit, such as a deleted item, the cost is entered as a negative number and no margin is added, though contracts can say otherwise. Your contract may set the margin for variations; use that figure.

Entering variations

Write one variation per line: number, description, cost excluding GST and margin, and whether the owner has approved it (yes or no). For example, `V1, Upgrade benchtop to stone, 4200, yes`.

The register

The table shows each variation's cost, the price after margin, the GST and the total, with its status. The summary gives: - the original contract sum including GST, - approved variations, - the new contract sum, - pending variations still to be agreed, - the percentage change from the original price, - the margin earned on approved variations.

Getting variations right

- Put every variation in writing before the work, with a description, price and any change to the completion date. - Get the owner's signature or written approval. - Number variations and keep a running register. - Include variations in progress claims only once approved. Some states set rules for variations required by an authority or emergency, and some limit when a builder can claim for work done without a signed variation.

For owners

Ask for the cost breakdown and the margin used. Compare the price with what you would pay for the item separately. Check whether a variation also extends the completion date.

Worked example

On a A$385,000 contract including GST, with a 20% margin: an upgraded stone benchtop at A$4,200 cost, six extra power points at A$780 and a garden shed deleted for a A$2,400 credit add A$3,934 to the contract, a 1.0% increase. Rock excavation at A$6,500 cost (A$8,580 with margin and GST) is pending.

Limits

An estimate, not legal advice. Your contract terms and your state's home building laws decide how variations must be made and paid.

풀이 예시

승인 된 세 가지 변형은 A$385,000 계약에 A$3,934을 추가합니다. 8,580 달러의 계약이 미뤄지고 있습니다.

한눈에 보기

자주 묻는 질문

건설업자들은 어떻게 가격 차이를 만들까요?

Cost plus a margin, often 15 to 25%, plus GST.

변경 사항은 반드시 서면으로 해야 합니까?

네, 모든 주의 주택 건설법은 대부분의 경우 서면으로 변경을 요구합니다.

GST가 변동에 추가되는가요?

네, 등록된 건설업자에게는 10%입니다.

삭제된 항목은 어떻게 처리됩니까?

신용으로, 음값을 입력합니다.

건설업자는 서명되지 않은 변동에 대해 요금을 청구 할 수 있습니까?

종종 그렇지 않거나 제한된 경우에만; 주의 법을 확인하세요.

내 데이터가 저장되어 있나요?

네 브라우저에서만

완전 무료요금 없음, 가입 없음
파일은 비공개로 유지됩니다모든 작업이 브라우저 안에서 이루어집니다
내 언어로 쉽게여러 언어로 제공