Bathroom Renovation Planner

List every fixture, tile and trade with a date and price; the planner counts tiles and boxes, sketches the layout, orders the trades and watches the budget.

ブラウザ内で動作します。ファイルは端末の外に出ません。 確認方法を見る

…

使い方

  1. 1
    Set the room

    Length, width, height, budget and contingency.

  2. 2
    List fixtures

    Bath, WC, basin and shower with sizes and positions.

  3. 3
    Add tiles

    Area, tile size, waste and tiles per box.

  4. 4
    Book the trades

    Labour lines with dates in the right stage.

  5. 5
    Watch order dates

    Lead times become reminders.

  6. 6
    Print the plan pack

    Sketch, schedule and photos for the builder.

このツールについて

A new bathroom involves a dozen suppliers and four or five trades who must arrive in the right order, and one late delivery can leave a plasterer standing idle or a family without a toilet for a week. This planner keeps the whole job in one list. Each line is a fixture, a tile, a batch of materials, a labour day or a fee, with a planned date, a stage in the standard trade sequence, a supplier, a quantity, a unit price, what you actually paid and a status from idea to done. Tiles get their own calculator: enter the area, tile size, waste allowance and tiles per box, and the tool rounds up to whole boxes and prices the area you will really buy. Fixtures can carry a position and size, and those appear on a simple top-down sketch of the room so you can see whether the basin clashes with the door swing or the WC sits too close to the bath. Lead times turn into order-by dates in the reminders list, and the insights warn when an order date has passed, when a later trade is booked before an earlier one, when no waterproofing stage is planned or when the plan breaks the budget after contingency. A plan pack prints the sketch, the schedule in trade order and product photos for the builder.

The usual trade order

Design and ordering, strip-out, plumbing first fix, electrics first fix, boarding and plastering, tanking and waterproofing, fitting the bath, shower tray and WC, tiling, plumbing second fix, electrics second fix, decorating and sealant, final clean and snagging. Stages can overlap on a small job, but tiling before waterproofing or plastering before the first fix means work gets undone.

Counting tiles

The tool adds the waste allowance to the area, divides by the area of one tile and rounds up, then rounds up again to whole boxes. Buy every box from the same batch: shades vary between production runs, and returning one unopened box is easier than matching a colour later.

Electrics and water

Lights, fans and shaver points near a bath or shower must have the right IP rating for their zone. In England and Wales electrical work in a bathroom is notifiable building work under Part P, so a registered electrician should do it and issue a certificate.

Worked example

The sample wall tiles cover 14.5 m² with 30 × 60 cm tiles, 10% waste and 8 per box. That is 15.95 m², or 89 tiles, which rounds to 12 boxes holding 96 tiles and 17.28 m²; at £28 per m² the tiles cost £483.84. All nine lines come to £4,343.84, or £4,778.22 with a 10% contingency, leaving £1,221.78 of the £6,000 budget. The bath has a 21-day lead time and is needed on fitting day, so its order date has already passed and it heads the reminders.

Limits

Prices and lead times are yours to enter; the planner does not fetch quotes. The sketch is a guide, not a scaled drawing for building control, and it does not check drainage falls or structural loads.

計算例

14.5 m² of 30 × 60 cm tiles with 10% waste: 89 tiles, 12 boxes, £483.84; whole plan £4,778.22 with contingency.

ポイント

よくある質問

How much contingency should I allow?

Ten to fifteen per cent is typical. Old houses hide rotten joists, lead pipes and uneven walls that only appear after strip-out.

How do I draw the layout?

Give each fixture a position from the left and back walls and its width and depth in centimetres. The sketch updates and the insights flag overlaps or fixtures that stick out of the room.

What does waterproofing involve?

A tanking membrane or liquid kit behind and below the shower and around the bath, and the whole floor in a wet room. Tile grout is not waterproof on its own.

Can I track what I have paid?

Yes. Enter the amount paid on each line; the stats compare paid with the estimate and the chart shows spending per month.

Does it remind me to order things?

Every item with a lead time gets an order-by date. The reminders list shows what is overdue or due soon and exports a calendar file.

Can I hand the plan to my builder?

Download the plan pack: it holds the sketch, the schedule in trade order and the product photos, ready to print or send.

完全無料料金なし、登録なし
ファイルはプライベートすべてブラウザ内で動作します
あなたの言語で使いやすく多くの言語に対応