Power Cut and Load-Shedding Schedule Tracker
Type the outage slots your utility publishes, for every day, chosen weekdays or one date; the tracker shows whether power should be on now, a timeline of today, the next seven days, reminders, whether your UPS or inverter lasts each cut, and a log of real outages.
Se ejecuta en tu navegador. Tus archivos nunca salen de tu dispositivo. Cómo comprobarlo
…
Cómo hacerlo
- 1Schedule
Enter your slots and days.
- 2Check
See now, next cut and today's timeline.
- 3Remind
Add the week to your calendar.
- 4Backup
Enter battery size and device watts.
- 5Log
Record real outages and export them.
Sobre esta herramienta
The Power Cut and Load-Shedding Schedule Tracker is for places where electricity is switched off on a roster, such as load-shedding stages in South Africa, rotating outages in Pakistan, Nigeria or Bangladesh, or planned maintenance cuts anywhere. It does not fetch any schedule. You type the slots your utility or estate publishes, and the tracker turns them into a live view of your day. Each slot has days, a start and end time and a note. Days can be Every day, a list of weekday names such as Mon,Wed,Fri, or a single date written as YYYY-MM-DD for a one-off cut. An end time earlier than the start runs past midnight, so 22:00 to 01:00 works. A Quick days menu fills the last slot with every day, weekdays or weekends. At the top, the tracker shows whether power is on or off by the schedule right now, with the time it returns, and the next cut with a countdown. A green strip for today has the cuts in red and a line marking the current time, and three figures give hours off today, hours off this week and the number of cuts this week. A list shows every cut in the next seven days with its date, times, length and note. Add week to calendar saves those cuts as an .ics file, each with an alarm 30 minutes before. A Browser reminder box can also pop up a notification a set number of minutes ahead, while the page stays open.
Backup power check
Enter the usable capacity of your UPS, inverter battery or power station in watt-hours, then list what you will run during a cut with each device's watts. Hints help with the capacity: an inverter battery is volts times amp-hours, so 12 V × 150 Ah is 1,800 Wh, of which you should use about half with lead-acid, and a power bank is roughly mAh × 3.7 ÷ 1,000. The tracker adds up the load, allows 85% inverter efficiency and shows how long the battery runs. It then compares that with the longest cut this week. If the battery lasts, it says how much time you have to spare; if not, it says how short it falls and the highest load that would last.
What the defaults show
The starting schedule has a morning slot from 07:00 to 09:00 every day, an evening slot from 18:00 to 20:30 on Monday, Wednesday and Friday, and a late slot from 21:00 to 23:00 on the other days. On Thursday 5 November 2026 that means four hours off, and the coming week has 14 cuts and 29 hours 30 minutes without power. The default devices are a 12 W Wi-Fi router, 18 W of LED bulbs, a 60 W ceiling fan and a 45 W laptop, 135 W in all. A 600 Wh battery runs them for 3 hours 47 minutes, which covers the longest cut of 2 hours 30 minutes with 1 hour 17 minutes to spare.
Several areas or groups
The area or group name at the top appears in reminders. If you split time between home and work, or your stage changes often, keep the slots for the current stage only and change them when the utility announces a new stage, because the tracker holds one schedule at a time.
Charging plan
When a cut is coming, a line tells you to plug in phones, power banks and the backup battery before a time set by your reminder lead, and how long remains.
Logging real outages
Press Power just went off when it goes and Power is back when it returns. The tracker keeps each outage, shows the last eight with their length and whether they fell inside a scheduled slot, and totals the logged outages and time off. Download log CSV saves every logged outage with start, end, minutes and a scheduled yes or no, which is useful evidence for a complaint to the utility or a landlord.
Limits
The schedule is only as good as what you type, so update it when the stage or roster changes. Browser reminders work only while this page is open; the calendar file works when it is closed. Runtime is an estimate, since batteries age and loads vary. Everything stays in this browser. This is a planning aid and not electrical or safety advice.
Ejemplo práctico
The default roster gives 14 cuts and 29 hours 30 minutes off in a week; a 600 Wh battery runs 135 W for 3 hours 47 minutes, covering the longest 2.5-hour cut.
Datos rápidos
- Categoría: Matemáticas y ciencia
- Funciona en tu navegador, sin registro y sin subir nada.
- Lo que introduces se queda en tu dispositivo.
- Disponible en inglés.
- Contenido revisado por última vez:
- Fuente oficial: Utility load-shedding schedules (entered by you); battery runtime = Wh x efficiency / W
Preguntas frecuentes
Does it download my area's schedule automatically?
No. Type the slots your utility publishes. Nothing is fetched, so update the slots when your stage or group changes.
How do I enter a cut that crosses midnight?
Give an end time earlier than the start, such as 22:00 to 01:00, and the cut runs into the next day.
Can I get a reminder before a cut?
Yes. Add the week to your calendar for an alarm 30 minutes before each cut, or tick Browser reminder while the page is open.
How do I work out my battery's watt-hours?
Multiply volts by amp-hours, for example 12 V × 150 Ah = 1,800 Wh, and use about half for lead-acid batteries.
How long will my UPS last?
Enter its usable watt-hours and your devices' watts. The tracker allows 85% efficiency and compares the runtime with this week's longest cut.
Can I record outages that were not on the schedule?
Yes. Press Power just went off and Power is back; each outage is marked as scheduled or unscheduled and can be downloaded as CSV.
