مولد الاقتباسات والتقديرات للتجار (أستراليا)

أدخل عملك وترخيصك، العميل والموقع، قائمة العمالة والمواد، اختر عرض أو تقدير وحالتك، وأطبعها أو حفظها.

يعمل في متصفحك. ملفاتك لا تغادر جهازك أبدًا. شاهد كيف تتحقق

…

كيف تفعل ذلك

  1. 1
    ادخل في عملك

    ABN ورخصة.

  2. 2
    أدخل العميل والموقع

    من و أين

  3. 3
    قائمة العمالة والمواد

    مع الأسعار

  4. 4
    اختر الاقتباس أو التقدير

    وولايتك

  5. 5
    طباعة أو إرسال

    احتفظ بنسخة

عن هذه الأداة

A clear quote wins work and avoids disputes. It should show your business name, ABN and licence number, the client and site, a description of the work, labour and materials with prices, GST, the total, any deposit and how long the quote is valid. A quote is usually a fixed price, while an estimate is a best guess that may change. For residential building work, states limit deposits: in NSW 10% of the price, and in Victoria and Queensland 10% for jobs under A$20,000 and 5% above. This generator produces a tidy quote or estimate.

Who this is for

Electricians, plumbers, carpenters, painters, handypeople and other tradespeople quoting residential and small commercial work.

Quote or estimate

A quote is a firm price for the work described, usually binding if accepted within its validity period. An estimate is an approximate price and should say that it may change and why. Under the Australian Consumer Law, misleading quotes or estimates can lead to penalties.

How to enter items

Labour: description, hours, hourly rate. Materials: description, quantity, unit price. Prices exclude GST; the generator adds 10%.

Deposits

Home building laws cap deposits. In NSW, a deposit for residential building work cannot exceed 10%. In Victoria and Queensland, the limit is 10% for contracts under A$20,000 and 5% for A$20,000 or more. Other states have their own rules. Larger jobs may also need a written contract and home warranty insurance.

A worked example

An electrician in Penrith quotes 17 hours of labour at A$95 and A$1,288 of materials for a kitchen and laundry rewire. The subtotal is A$2,903, GST is A$290.30 and the total A$3,193.30, with a 10% deposit of A$319.33.

Variations

If the scope changes, agree on the change and price in writing before doing the extra work.

Keep records

Keep copies of quotes, acceptances and variations with the job file.

## Written contracts for bigger jobs States require a written contract for residential building work above certain values, such as more than A$7,500 in NSW and more than A$10,000 in Victoria for domestic building work, with additional rules above higher thresholds. A quote can form part of the contract, but larger jobs need the full contract terms required by law.

Payment terms

State when payment is due, how to pay and whether progress payments apply. For larger jobs, link progress payments to completed stages rather than dates, and never ask for more than the deposit limit before work starts.

Questions tradies ask

Should I charge for quoting? Some trades charge a call-out or quoting fee for complex jobs; say so before visiting. How long should a quote be valid? Thirty days is common, as material prices change.

Limits

A template only, not legal advice. Check your state's contract rules for larger jobs.

مثال محلول

A rewire quote of A$2,903 plus GST totals A$3,193.30 with a A$319.33 deposit.

حقائق سريعة

الأسئلة الشائعة

ماذا يجب أن يتضمن الاقتباس؟

Your ABN and licence, client and site, work, prices, GST, total, deposit and validity.

هل الاقتباس ملزم؟

عادة ما يكون الاقتراح سعرًا ثابتًا إذا تم قبوله أثناء فترة صلاحيته.

How much deposit can I take in NSW?

حتى 10% لعمل البناء السكني

ماذا عن فيكتوريا وكوينزلاند؟

10% لأقل من 20,000 دولار أسترالي و 5% لأكثر من 20,000 دولار.

Do prices include GST?

Enter prices excluding GST; the quote adds 10%.

هل اقتباسي محفوظ؟

لا، طبعها أو احفظيها بنفسك

مجاني تمامًابلا تكلفة وبلا تسجيل
ملفات خاصةكل شيء يعمل في متصفحك
سهل بلغتكمتوفر بلغات كثيرة