Fleet Status Board and Availability Dashboard

Update each aircraft's status and hours to see the fleet sorted by status, the availability rate, hours left to the next inspection and a briefing board to export.

يعمل في متصفحك. ملفاتك لا تغادر جهازك أبدًا. شاهد كيف تتحقق

…

كيف تفعل ذلك

  1. 1
    Set band

    Hours warning for inspections.

  2. 2
    Add aircraft

    Tail, type and status.

  3. 3
    Enter hours

    Now and next due.

  4. 4
    Read rate

    Available and availability %.

  5. 5
    Brief

    Download the HTML board.

عن هذه الأداة

The Fleet Status Board and Availability Dashboard gives a small fleet a single picture of what can fly. For each aircraft you enter the tail number, the type and its status: FMC (fully mission capable), PMC (partially capable), NMCM (not capable because of maintenance), NMCS (not capable because of supply) or Depot / deep maintenance. Add the airframe hours now and the hours at which the next inspection is due, with its name, and the board shows the hours remaining, flagging Due soon inside a warning band and OVERDUE when the figure goes negative. When an aircraft is not capable, an ETIC box appears for the estimated time it will be back in commission. Remarks hold restrictions such as night flying not permitted. The counters give the fleet size, the number available, the availability rate, the NMCS count and inspections due soon, a board sorts aircraft into status columns, and a summary breaks availability down by type. A colour-coded HTML board can be downloaded for a briefing screen. It is a personal and training record, not an approved maintenance or fleet management system.

Who this is for

Maintenance controllers and supervisors at flying schools, squadrons, clubs and small charter operators, students learning mission capable reporting categories, and anyone who needs a quick daily status slide without building a spreadsheet.

How to use it

1. In Settings, set the warning band for inspections; the default is 10 hours. 2. Press Load example to see four aircraft: three trainers and a utility helicopter. 3. Add each aircraft with its tail number and type. 4. Choose its status from the five categories. 5. Enter airframe hours now, the hours at which the next inspection is due and the inspection's name. 6. For a not capable aircraft, enter the ETIC, for example 05 Nov 12:00. 7. Add remarks for any restriction, set the updated date, then check the board and the counters.

The status categories

FMC means the aircraft can do all of its tasks. PMC means it can fly but with a restriction, such as no night flying because a landing light is out. NMCM means it is grounded for maintenance work, and NMCS means it is grounded waiting for a part. Depot covers deep maintenance away from the line. Splitting NMCM from NMCS matters, because it shows whether the fleet is short of hands or short of spares.

How availability is worked out

The availability rate is the number of aircraft marked FMC or PMC divided by the total number of aircraft, as a whole percentage. The by-type summary repeats the same calculation for each type. Hours to inspection is next-due hours minus hours now, rounded to one decimal place.

Reading the example

Of four aircraft, ZZ121 is FMC and ZZ123 is PMC, so 2 are available and the rate is 50%. ZZ122 is NMCS waiting for a fuel pump with an ETIC of 05 Nov 12:00. ZZ123 has only 7 hours left to its 50-hour inspection, inside the 10-hour band, so it counts as an inspection due soon.

The briefing board

Status board (HTML) downloads a single page with the date and time, one row per aircraft and colour coding: green for FMC, yellow for PMC and red for everything else. It opens in any browser, so it can sit on a hangar television without any software. The usual CSV export, PDF print and JSON backup are also available, and the data stays in this browser.

Keeping the board honest

Update status as soon as it changes, not once a day, and record the reason in the remarks so the next person does not have to ask. An ETIC is a promise to operations, so revise it the moment a part slips. The updated date on each aircraft shows how fresh its line is.

Limits

There is no history of status changes, so the rate is a snapshot of today rather than an average over a reporting period, and hours are typed in rather than drawn from flight logs. Calendar-based inspections are not tracked here. It is a planning picture, not operational or airworthiness advice; the aircraft's technical records, the approved maintenance programme and your organisation's reporting rules decide each aircraft's real status.

مثال محلول

The sample fleet of 4 shows 2 available (FMC + PMC), a 50% availability rate, 1 aircraft NMCS for a fuel pump and 1 inspection due soon at 7 hours.

حقائق سريعة

الأسئلة الشائعة

What do FMC, PMC, NMCM and NMCS mean?

Fully capable, partially capable, not capable for maintenance and not capable for supply.

How is the availability rate calculated?

Aircraft marked FMC or PMC divided by all aircraft, as a percentage.

What is ETIC?

Estimated time in commission: when a grounded aircraft is expected back.

When is an inspection flagged?

When hours left fall inside the warning band, 10 hours by default, or below zero.

Can I show the board on a screen?

Yes, download the colour-coded Status board (HTML) and open it in a browser.

Is this an official fleet status system?

No, it is a training and personal record; the approved records decide status.

مجاني تمامًابلا تكلفة وبلا تسجيل
ملفات خاصةكل شيء يعمل في متصفحك
سهل بلغتكمتوفر بلغات كثيرة