Prismoidal, Frustum and Borrow-Pit Volume Calculator
Calculate volumes between two cross-sections by the prismoidal formula and compare it with the average-end-area method, find the volume of a frustum such as a stockpile or pit, or compute cut volume from a square grid of depths by the borrow-pit method.
Funziona nel tuo browser. I tuoi file non lasciano mai il dispositivo. Scopri come verificarlo
…
Come si usa
- 1Choose the method
Prismoidal, frustum or grid.
- 2Enter areas and length
Or base, top and height.
- 3Enter grid depths
Rows of numbers.
- 4Set swell
Percent.
- 5Read volumes
In place and loose.
Informazioni su questo strumento
Earthwork quantities decide the cost of roads, platforms and excavations, and small differences in method can mean thousands of cubic metres. The average-end-area method is quick but overestimates when the cross-sections change shape between stations; the prismoidal formula, which uses a middle section, is exact for prismoids. Stockpiles and pits are often frustums of pyramids. For excavations measured on a grid, the borrow-pit method weights each corner depth by the number of grid squares it touches. This calculator covers all three and adds the swell factor for loose volumes.
Who this is for
Civil engineers, quantity surveyors, contractors, land surveyors and construction students.
Prismoidal formula
V = L × (A1 + 4Am + A2) / 6, where Am is the area of the middle section (measured, not averaged). The average-end-area method, V = L × (A1 + A2)/2, is exact only when the middle area equals the average of the ends. The difference is the prismoidal correction, often 1-5 %.
Frustum
V = h × (A1 + A2 + √(A1 × A2)) / 3 for a frustum of a pyramid or cone with parallel top and base. Stockpiles with flat tops and excavations with sloping sides are close to this shape.
Borrow-pit method
Lay a square grid of side a over the area and record the depth of cut (or fill) at each grid point. Each point is used by 1, 2, 3 or 4 grid squares: V = a² / 4 × (Σh1 + 2Σh2 + 3Σh3 + 4Σh4) Enter the depths row by row, separated by spaces; every row must have the same number of points.
Swell and shrinkage
Excavated soil occupies more volume loose than in the ground. Typical swell: sand and gravel 10-15 %, common earth 20-30 %, clay 30-40 %, blasted rock 50-80 %. Compacted fill usually shrinks 5-15 % from bank volume.
Worked examples
Sections of 40, 55 and 75 m² 20 m apart give 1,117 m³ by the prismoidal formula and 1,150 m³ by average end area, 3 % more. A frustum with a 100 m² base, 36 m² top and 4 m height holds 261 m³. A 10 m grid of 3 × 4 depths gives 812.5 m³ in place, or 1,016 m³ loose at 25 % swell.
Mass haul
On road and rail projects, cut and fill volumes along the line are combined into a mass haul diagram, which shows where material can be moved from cuts to fills, the haul distances, and where borrow or waste is needed. Accurate section volumes, adjusted for swell and shrinkage, are the starting point for that balance.
Common mistakes
- Averaging end areas to get the middle area in the prismoidal formula. - Mixing cut and fill depths in one grid. - Forgetting swell when ordering trucks, or shrinkage when buying fill. - Using grid squares too large for irregular ground.
Limits
Geometric approximations; digital terrain model comparisons are more precise. This is not professional advice.
Esempio svolto
40/55/75 m² over 20 m: 1,117 m³ prismoidal vs 1,150 m³ average end area.
In breve
- Categoria: Ingegneria e costruzioni
- Funziona nel browser, senza registrazione né caricamento.
- Le informazioni che inserisci restano sul tuo dispositivo.
- Disponibile in inglese.
- Contenuto rivisto l'ultima volta il:
- Fonte ufficiale: Prismoidal formula V = L(A1 + 4Am + A2)/6 and the prismoidal correction; frustum V = h(A1 + A2 + √(A1A2))/3; borrow-pit (unit area) method V = a²/4·(Σh1 + 2Σh2 + 3Σh3 + 4Σh4) for square grids (Ghilani and Wolf, Elementary Surveying, ch. 26; Davis, Foote and Kelly, Surveying: Theory and Practice)
Domande frequenti
What is the prismoidal formula?
V = L × (A1 + 4Am + A2) / 6.
Why does average end area overestimate?
It assumes the middle area equals the average of the ends.
How do I calculate a frustum volume?
h × (A1 + A2 + √(A1A2)) / 3.
How does the borrow-pit method work?
Corner depths are weighted by how many grid squares share them.
What swell factor should I use?
About 20-30 % for common earth, more for clay and rock.
Is my data stored?
Earthwork data is never sent to us.