Performance Improvement Plan (PIP) Builder
Fill in the employee, manager, HR contact, start date and length, list each problem area with the facts, a measurable goal and how it will be checked, add the support and check-in dates, then print the plan with signature lines.
Funziona nel tuo browser. I tuoi file non lasciano mai il dispositivo. Scopri come verificarlo
…
Come si usa
- 1Employee
Enter the employee, manager, start date and weeks.
- 2Facts
Describe current performance with dates and counts.
- 3Goals
Write measurable goals and how each is checked.
- 4Support
List the support and the check-in dates.
- 5Print
Review the checks, save a version and print.
Informazioni su questo strumento
The Performance Improvement Plan (PIP) Builder turns a manager's concerns into a structured written plan that an employee can read, discuss and sign. It is built in four sections. The first holds the employee's name, job title, manager, HR contact, the plan start date and its length in weeks. The builder adds the weeks to the start date and prints the plan period with both dates written out in full, followed by a short paragraph explaining that the plan sets out where performance must improve and the support the company will give. The second section is a goals table. Each row has an area, the current performance stated as facts, a measurable goal, how the goal is measured and a result at review, which starts as Not reviewed yet and can be changed to Met, Partly met or Not met. You can add, remove and reorder rows. The third section lists the support the company commits to, one item per line, and a table of check-in dates with a notes column that prints with blank space for handwritten comments. The fourth section records the outcome, chosen from five options, a paragraph on what happens if the goals are not met, and an employee comments box, then prints signature and date lines for the employee, the manager and HR. A note above the signatures says that signing confirms receipt and discussion, not agreement. The live preview updates as you type. A Checks panel reviews the draft: it flags any goal whose goal and measure text contain no number or date, warns when the plan is shorter than four weeks, asks for at least three check-ins, and reminds you to describe facts rather than personality and to treat staff in the same role consistently. Nothing in the plan is calculated beyond the end date; every word and date is an editable field.
Who this is for
HR managers and HR generalists at small and mid-sized companies, line managers asked to document a performance problem before any further step, and owners of small businesses without an HR team who need a fair, consistent plan format.
How to use it
1. Enter the employee, job title, manager, HR contact, start date and number of weeks. 2. For each problem area, write the current performance as facts with dates or counts. 3. Turn each problem into a goal with a number or deadline and say how it will be measured. 4. List the support offered and the check-in dates, including a mid-point and final review. 5. Read the Checks panel, save a version, then print or download the plan for signatures.
What the sample shows
The office role template is a plan for Taylor Brooks, an Account Coordinator managed by Jordan Price, with Morgan Lee as HR contact. It starts on 23 November 2026 and runs 8 weeks, so the plan period prints as November 23, 2026 to January 18, 2027. There are three goals. Client response time moves from an average of 2.5 business days to a reply within 1 business day, measured on the weekly ticket report at 95% or better. Order accuracy moves from 7 errors in October, 3 of which reached clients, to no more than 1 a month with none reaching clients. Weekly status reports, missed in 4 of the last 8 weeks, must be sent by 4pm every Friday. Support includes a weekly 30-minute one-to-one, 2 hours of order system training in week 1, shared email templates and a peer buddy. Check-ins fall on 30 November, 7 December, 21 December (mid-point) and 18 January (final review). Because every goal contains a number, the Checks panel shows only the general reminder.
The sales template
The second template switches the job title to Sales Representative and replaces the goals with two rows: qualified opportunities rising from 8 to 15 a month, checked on the CRM report each Monday, and logged calls rising from 25 to 50 a week. The dates, support and check-ins from the office template stay in place, so edit them for the sales team.
Saving and printing
Save version stores a named copy in this browser with an optional note, and Versions lets you restore an earlier draft, which helps when HR and the manager edit in turns. Print / PDF opens the print dialog, Word (.doc) gives a file you can edit further in Word, and Web page (.html) saves a standalone copy.
Limits
The builder does not decide whether a plan is appropriate, does not track whether goals were met beyond the result column you fill in, and does not send anything to the employee. The at-will sentence in the default consequence text may not fit employees with contracts, union agreements or protections under state law, so change it where needed. Review the plan with HR or employment counsel before you act on the outcome. This template is not legal advice.
Esempio svolto
Taylor Brooks, Account Coordinator: 8-week plan from November 23, 2026 to January 18, 2027 with 3 measurable goals and 4 check-ins.
In breve
- Categoria: Aziende e lavoro
- Funziona nel browser, senza registrazione né caricamento.
- Le informazioni che inserisci restano sul tuo dispositivo.
- Disponibile in inglese.
- Contenuto rivisto l'ultima volta il:
- Fonte ufficiale: Common HR practice for performance improvement plans; EEOC guidance on consistent treatment
Domande frequenti
How long should a performance improvement plan be?
Many employers use 30, 60 or 90 days. The builder accepts any number of weeks, prints the end date it works out, and warns in the Checks panel when the plan is shorter than four weeks.
What makes a goal measurable here?
The Checks panel looks for a number or date in the goal or measure text. A goal such as reply within 1 business day passes; a goal such as improve communication is flagged so you can add a figure.
Can I record whether each goal was met?
Yes. Every goal row has a result at review that starts as Not reviewed yet and can be set to Met, Partly met or Not met before you print the final copy.
Does signing mean the employee agrees with the plan?
No. The printed plan states that signing confirms the employee received and discussed it, not that they agree, and it gives them a comments box for their side.
Can I edit the plan in Word?
Yes. Download it as Word (.doc) and open it in Microsoft Word or a compatible program. You can also save it as a web page or print it to PDF.
Where are the drafts kept?
Drafts and saved versions stay in this browser on this device. Nothing is sent to a server, so print or download the final plan for the personnel file.
