Lockout Tagout (LOTO) Procedure and Tag Maker

List every energy source on a machine with its magnitude, isolation point, lockout device and zero-energy check, write the shutdown, verification and release steps, name the authorised people and print the procedure and a DANGER lock tag for each isolation point.

Funziona nel tuo browser. I tuoi file non lasciano mai il dispositivo. Scopri come verificarlo

…

Come si usa

  1. 1
    Machine

    Enter the procedure, machine, location and photos.

  2. 2
    Energy

    List every source, isolation point and check.

  3. 3
    Shutdown

    Write the isolation steps in order.

  4. 4
    Verify and release

    Add the zero-energy test and release steps.

  5. 5
    Tags

    Print the procedure and one tag per point.

Informazioni su questo strumento

The Lockout Tagout (LOTO) Procedure and Tag Maker writes the equipment-specific energy control procedure that sits on or near a machine and tells authorised staff exactly how to make it safe for servicing. The Machine section records a procedure number, the machine or equipment, its location, who wrote it, the date and the photo references, which are file names or numbers of photos you keep elsewhere. The heart of the procedure is the energy sources table. Each row has a point ID, an energy type, the magnitude, the isolation point, the lock or device used and how to verify zero energy. The energy type list covers electrical, pneumatic, hydraulic, stored mechanical, gravity, thermal, chemical, steam and water. The Steps section has three ordered lists that print as numbered steps: shutdown and isolation, verification, and release from lockout. The Authorised people section lists those trained to apply the procedure and the contact number to show on the tags. Two checks run on the energy table: any source with an empty verification method is named, and if every source listed is electrical a warning suggests looking again for stored pneumatic, hydraulic, mechanical or gravity energy. The Print lock tags (cut out) button prints one tag per energy row, each 2.6 by 4.6 inches with a punched-hole marker, a red DANGER band and DO NOT OPERATE. Under that it prints the point ID and energy type, the isolation point, the equipment name, the procedure number, blank lines for locked by and date and time, and the contact. Two templates are included: a hydraulic press and a packaging machine.

Who this is for

Maintenance managers writing procedures for each machine, safety officers building an energy control programme, engineering contractors handing over new equipment, and supervisors who need tags that match the written procedure.

How to use it

1. Enter the procedure number, machine, location, author, date and photo references. 2. Add a row for every energy source with its isolation point, device and zero-energy check. 3. Write the shutdown and isolation steps in order. 4. Write the verification and release steps and list the authorised people. 5. Clear the warnings, then print the procedure and the lock tags.

What the sample shows

Procedure LOTO-PR-014 covers hydraulic press P-14 (250 t) in the press shop, bay 4, written by M. Chen on November 9, 2026, with photo references P14-isolator.jpg and P14-valve.jpg. It lists three energy sources: E1 electrical at 415 V AC three-phase, locked with a padlock and tag on main isolator IS-14; H1 hydraulic at 210 bar, released through accumulator dump valve V-3 under a valve lockout cover and confirmed by gauge G-2 reading 0 bar; and G1 gravity from the 1.2 t upper die, held by safety blocks. The shutdown has six steps, from telling affected people to each worker fitting their own padlock. Verification tries the start button and cycle selector and reads the gauge. Release has five steps ending with telling people the press is back in service. Three tags print, one each for E1, H1 and G1, with maintenance extension 214 as the contact.

Templates and versions

The packaging machine template rewrites the number, machine, location and energy table for carton erector CE-2 with a 400 V electrical source and a 6 bar pneumatic source. Save version keeps the procedure at each periodic inspection so you can show what was in force on a given date.

Downloads

Print / PDF for the procedure, Print lock tags (cut out) for the tags, and Word (.doc) or Web page (.html) to edit or share the procedure.

Limits

Photos are not stored: the photo field holds file names only, so keep the images with your controlled documents. The packaging template carries its own energy table, shutdown, verification and release steps, authorised people and photo names for a carton erector; adapt every line to your own machine. Printed paper tags do not replace durable, standardised tags and personal locks. The procedure must fit your employer's energy control programme under OSHA 1910.147 in the US or HSE guidance on safe isolation in the UK, be reviewed by a competent person and be checked on the machine itself. This tool is not legal, safety or engineering advice.

Esempio svolto

Hydraulic press P-14: 3 energy sources (415 V electrical, 210 bar hydraulic, 1.2 t gravity), 6 shutdown, 3 verification and 5 release steps, 3 DANGER tags.

In breve

Domande frequenti

What should a machine-specific LOTO procedure contain?

OSHA 1910.147 expects the intended use, steps for shutting down, isolating, blocking and securing the machine, steps for placing and removing locks and tags, and how to test that energy is controlled. This builder has a section for each.

Why does it warn when only electrical energy is listed?

Many injuries during servicing come from energy left behind after the power is off, such as trapped air, hydraulic pressure, springs or a raised load. The warning asks you to check for those.

How many tags are printed?

One for every row in the energy sources table. Each shows the point ID, energy type, isolation point, equipment and procedure number, with blank lines for the person locking and the date and time.

Can I attach photos of the isolation points?

No. Type the photo file names or numbers in the photo references box and keep the pictures in your document system or on the laminated procedure next to the machine.

Who may apply the lockout?

Only the trained, authorised people listed in the procedure. In the sample each worker fits their own padlock and tag and removes only their own lock at release.

How often should the procedure be reviewed?

OSHA requires a periodic inspection of each energy control procedure at least once a year. Review it sooner after any change to the machine, and save a version each time.