Inspection and Test Plan (ITP) Builder

Describe the work package, list each inspection and test activity with its acceptance criteria, reference and frequency, set hold, witness, review or surveillance points for the contractor, client and third party, note the record kept and print a plan with sign-off columns.

Funziona nel tuo browser. I tuoi file non lasciano mai il dispositivo. Scopri come verificarlo

…

Come si usa

  1. 1
    Header

    Enter the work package, parties and specification.

  2. 2
    Activities

    Add each inspection with its criteria.

  3. 3
    Points

    Set hold, witness, review or surveillance.

  4. 4
    Check

    Read the warnings and fix gaps.

  5. 5
    Print

    Print or download the plan for approval.

Informazioni su questo strumento

The Inspection and Test Plan (ITP) Builder sets out, before work starts, every check that a piece of work must pass, who has to be involved and what record proves it was done. The plan begins with a header: ITP number, the work package or element, the project, the contractor, the client or engineer, the specification and drawings that apply, and the revision of the plan. The activities table is the core. Each row has the activity, the acceptance criteria, the clause or standard it comes from, how often it is checked, and three columns that say what each party does: the contractor, the client or engineer, and a third party such as a testing laboratory. Each of those columns takes one of five codes. H is a hold point, where work stops until that party inspects and releases it. W is a witness point, where the party is given notice and may attend, but work can continue if they do not. R means a review of records, S means surveillance or spot checks, and a dash means no involvement. On the printed plan, hold cells are shaded red and witness cells amber so they stand out on site. A record column names the evidence, such as a test certificate or a pre-pour sign-off, and an empty signed and date column is left for completion. The approval section carries notes, such as the notice period for hold and witness points, and a sign-off table for prepared, reviewed and approved. Two templates are included: a concrete ground floor slab and a low-voltage electrical installation.

Who this is for

QA/QC engineers and quality managers on construction projects, subcontractors asked to submit an ITP before starting, site engineers preparing pre-pour checks, and clients or resident engineers who want to agree hold points in advance.

How to use it

1. Fill in the plan header with the work package, project, parties and specification. 2. Add one row per inspection or test activity with its acceptance criteria. 3. Give the reference clause, frequency and the record that will be kept. 4. Set H, W, R, S or a dash for the contractor, client and third party. 5. Read the checks, then print the plan for review and approval.

What the sample shows

The concrete slab template, ITP-03-001 for a reinforced concrete ground floor slab, lists six activities. Sub-base compaction must reach a plate bearing value of at least 40 MN/m², with a contractor hold point and a client witness point. Reinforcement fixing, checked for bar size, spacing and 40 mm cover within plus or minus 5 mm, is a hold point for both the contractor and the client, recorded on a pre-pour sign-off. Cube samples, one set per 50 m³, are a third-party hold with a laboratory report as the record. The approval notes ask for 24 hours' notice by email to the engineer for hold and witness points. The electrical template swaps in BS 7671 tests such as insulation resistance of at least 1 MΩ at 500 V DC and RCD trip times.

Built-in checks

The checks panel looks at every activity. It warns when an activity has no acceptance criteria, because an inspection without a criterion cannot pass or fail. It also warns when no party has a hold or witness point on an activity, asking you to confirm that review or surveillance alone is intended.

Printing and saving

The live preview shows the plan as it will print. Print / PDF sends it to the printer or a PDF file, Word (.doc) gives an editable copy and Web page (.html) a standalone file. Save version keeps named revisions of the plan in this browser, and sections can be switched off with Include when they are not needed.

Limits

The acceptance criteria and references in the templates are examples; replace them with the values in your own specification, drawings and standards. The tool does not check that criteria meet any standard. Saved versions live in this browser only. An ITP drafted here is a planning document for review by the responsible engineer and is not engineering or quality advice.

Esempio svolto

Concrete slab ITP-03-001: 6 activities; reinforcement is a hold point for contractor and client; cube tests 1 set per 50 m³ are a third-party hold.

In breve

Domande frequenti

What is the difference between a hold point and a witness point?

At a hold point work must stop until the named party inspects and releases it. At a witness point the party is notified and may attend, but work can go ahead if they do not come.

What do R and S mean?

R is a review of records, such as checking test certificates, without attending. S is surveillance, meaning spot checks at the party's discretion. A dash means that party has no role in that activity.

Can I start from a template?

Yes. Choose the concrete slab or the electrical installation template and edit the rows, or start blank and add your own activities.

Why does the checks panel warn about an activity?

Either the activity has no acceptance criteria, or nobody has a hold or witness point on it. The second warning is a prompt to confirm the choice, not an error.

Can I edit the plan in Word?

Yes. Download Word (.doc) for an editable copy, or Print / PDF for a fixed version to submit for approval.

Does the ITP replace the inspection records?

No. The plan says what will be checked and what record will be kept. The records themselves, such as test certificates and signed checklists, are produced when the work is inspected.

Completamente gratisNessun costo, nessuna registrazione
I file restano privatiTutto funziona nel tuo browser
Facile nella tua linguaDisponibile in molte lingue