Hoshin Kanri X-Matrix Builder

List breakthrough objectives, annual objectives, improvement priorities, KPIs and owners, tap the corner grids to mark strong and weak links, check alignment and track each KPI against a straight-line plan month by month.

Funziona nel tuo browser. I tuoi file non lasciano mai il dispositivo. Scopri come verificarlo

…

Come si usa

  1. 1
    Set breakthrough objectives

    Enter the three to five year goals in the south list.

  2. 2
    Add annual objectives

    Enter this year's measurable results and link them to the breakthroughs.

  3. 3
    Add improvement priorities

    List the projects that will deliver the annual objectives and link them.

  4. 4
    Add KPIs and owners

    Give each KPI a baseline and target, and mark a lead owner for every priority.

  5. 5
    Clear the checks

    Fix orphans, missing leads and overloaded owners until alignment is high.

  6. 6
    Review monthly

    Enter actuals in the bowling chart and act on the red months.

Informazioni su questo strumento

Hoshin Kanri, also called policy deployment, is the planning method that links a company's few big long-term goals to the improvement work people do this year, and the X-matrix is its best-known tool. Around a central square divided by an X sit four lists: breakthrough objectives for the next three to five years at the bottom, annual objectives on the left, top-level improvement priorities at the top and KPIs with targets on the right. The corners between the lists hold small grids where a filled dot marks a strong relationship and an open dot a weaker one. A further grid on the right names who leads and who supports each priority. On one sheet, the leadership team can see whether every project serves a goal, whether every goal has a project and whether anyone has been given too much. This builder draws the X-matrix as an SVG from five simple lists, lets you tap any corner cell to cycle between none, strong and weak, scores the overall alignment, and keeps a monthly bowling chart for every KPI so the plan is followed up, not filed.

How to fill the matrix

Start at the south with two to four breakthrough objectives: bold outcomes a few years away, such as doubling aerospace revenue. Move west to annual objectives, the measurable results this year that move each breakthrough forward. Then north to the improvement priorities: the projects and programmes that will deliver the annual objectives. East are the KPIs that show whether the priorities are working, each with a baseline, a target and the direction that counts as better. Finally list the owners and mark, for each priority, one lead and any supporters. In each corner grid tap a cell once for a strong link and twice for a weak one; a third tap clears it.

Alignment checks and the follow-up

The checks look for orphans: annual objectives with no breakthrough, priorities with no annual objective or no KPI, KPIs nobody measures and breakthrough objectives with nothing planned this year. They also flag priorities with no lead or more than one lead, and owners leading more than three priorities. The alignment score is the share of these expected links that exist. The follow-up tab draws a straight-line plan from the baseline to the target over twelve months, takes the actual result you enter each month and colours it green or red: the classic bowling chart used in monthly Hoshin reviews. The roll-forward button starts next year's matrix with the latest actuals as new baselines.

Worked example

The sample is a precision components company planning FY 2026/27 from April. It has three breakthrough objectives, three annual objectives, four improvement priorities, four KPIs and four owners, and every expected link is present, so alignment is 100% and the checks are clear. Each owner leads exactly one priority. In the follow-up, on-time delivery runs ahead of plan for six of the first seven months; it slips in July, at 92.8% against a planned 93%. The cost of poor quality is red in all seven months entered: it has fallen from 4.2% to 3.7% of sales, but the plan line needed 3.44% by October. Average changeover time beat the plan from June onwards, helped by the SMED priority, and near-miss reports are green every month.

Limits

The X-matrix is a communication and review tool; the quality of the plan still depends on the catchball conversations behind it. The straight-line plan is a simplification, so seasonal KPIs may need judgement. Nothing here is business or financial advice.

Esempio svolto

FY 2026/27 sample: alignment 100%; on-time delivery red only in July (92.8% vs 93%); cost of poor quality red for all 7 months entered.

In breve

Domande frequenti

What is an X-matrix in Hoshin Kanri?

It is a one-page plan with four lists around a central X: long-term breakthrough objectives, annual objectives, improvement priorities and KPIs, plus owners. Corner grids show which items support which.

What do the filled and open dots mean?

A filled dot means a strong relationship, or the lead owner in the owner grid. An open dot means a weaker or secondary relationship, or a supporting owner. Blank means no link.

How many items should each list have?

Fewer is better. Most guides suggest three to five breakthrough objectives, a similar number of annual objectives and no more improvement priorities than the organisation can staff properly.

What is a bowling chart?

It is a monthly table of plan against actual for each KPI, with each month coloured green when on plan and red when behind. It is used in monthly reviews to decide where countermeasures are needed.

Can I print the X-matrix?

Yes. Print it with the follow-up table and owner list, or save it as PDF. You can also download the matrix as SVG or PNG for a strategy pack or wall board.

Is my strategy plan uploaded anywhere?

No. It stays in this browser. Use Export file to back it up or share it with the leadership team.

Completamente gratisNessun costo, nessuna registrazione
I file restano privatiTutto funziona nel tuo browser
Facile nella tua linguaDisponibile in molte lingue