Garments CM and FOB Costing Sheet
Enter the order quantity, fabric consumption, price and wastage, trims per dozen, SMV, cost per minute and efficiency, other costs and your margin, and see CM and FOB per dozen and per piece with a cost sheet.
Funziona nel tuo browser. I tuoi file non lasciano mai il dispositivo. Scopri come verificarlo
…
Come si usa
- 1Enter fabric
Consumption and price.
- 2Add trims
Per dozen.
- 3Set SMV
And cost per minute.
- 4Set efficiency
Line target.
- 5Add other costs
Wash, test, freight.
- 6Read FOB
Per piece.
Informazioni su questo strumento
When a buyer sends a tech pack and asks for a price, a Bangladeshi garments factory or buying house prepares a costing sheet that builds up the FOB (free on board) price from its parts. The biggest part is usually fabric: consumption per dozen from the marker, times the fabric price, plus wastage for cutting and faults. Then come trims and accessories, labels, tags, thread, poly bags and cartons, per dozen. The factory's own charge for sewing, cutting and finishing is CM, cost of making, and the standard way to work it out is from the garment's SMV (standard minute value, the time a trained operator needs to make one piece): CM per dozen equals SMV times 12 times the factory's cost per minute, divided by the line efficiency, because a line running at 60% efficiency needs more real minutes than the standard. The cost per minute comes from the factory's monthly wages and overheads divided by the minutes available. Washing, printing or embroidery, testing, inland freight to the port and commercial costs for LCs and banks are added per dozen, then the margin and any buying agent's commission give the FOB price per dozen and per piece. Getting CM right is the key to winning orders without losing money, and buyers often negotiate hard on it. This costing sheet takes all these inputs, shows each part per dozen with its share of the FOB price, the FOB per piece, the profit per dozen and the order value, and lets you compare efficiency levels or styles side by side.
Who this is for
Merchandisers and costing officers in garments factories and buying houses, factory owners quoting prices, and students of apparel merchandising.
Cost sheet
| Part | How it is worked out | |---|---| | Fabric | Consumption per dozen × price × (1 + wastage) | | Trims | Items per dozen | | CM | SMV × 12 × cost per minute ÷ efficiency | | Other | Wash, print, test, freight, commercial | | Margin | % on total cost | | Commission | % of FOB |
SMV and efficiency
SMV comes from the operation breakdown; efficiency is output minutes ÷ available minutes. Higher efficiency lowers CM.
Cost per minute
Monthly wages and overheads ÷ (operators × minutes worked). Use your factory's own figure.
Tips
Cost every colour and size range separately if consumption differs, and confirm fabric prices before quoting.
Negotiating with buyers
Buyers often quote a target FOB price. Work backwards: subtract fabric, trims and other costs from the target to see what CM is left, then check whether your lines can reach the efficiency that CM needs. If not, look at fabric consumption, trims choices or a simpler construction before cutting your margin.
Limits
This is a costing aid, not a quotation; buyers' own cost breakdowns may differ.
Esempio svolto
A knit T-shirt with 2.6 kg of fabric per dozen at $3.40, 8% wastage, $1.19 of trims, SMV 5.5 at 6 cents a minute and 60% efficiency, $0.93 of other costs and 8% margin: CM $6.60 a dozen and FOB about $19.73 a dozen, $1.64 a piece.
In breve
- Categoria: Aziende e lavoro
- Funziona nel browser, senza registrazione né caricamento.
- Le informazioni che inserisci restano sul tuo dispositivo.
- Disponibile in inglese.
- Contenuto rivisto l'ultima volta il:
- Fonte ufficiale: Bangladesh Garment Manufacturers and Exporters Association
Domande frequenti
How is CM calculated?
CM per dozen = SMV × 12 × cost per minute ÷ line efficiency.
What is SMV?
Standard minute value: the time a trained operator needs to make one garment.
What is FOB?
Free on board: the price with goods loaded at the port of shipment.
How does efficiency affect price?
Higher efficiency lowers CM and the FOB price.
Can I compare styles?
Yes. Use the Compare presets side by side.
Is my data stored?
Only in your browser.