Dissertation Timeline Planner with Gantt Chart

Pick a template, set your start and submission dates, edit the tasks and their weeks, and get every deadline, a Gantt chart, progress against today and a calendar file of deadlines.

Funziona nel tuo browser. I tuoi file non lasciano mai il dispositivo. Scopri come verificarlo

…

Come si usa

  1. 1
    Choose a template

    Load the Master's, PhD, US doctoral or undergraduate template.

  2. 2
    Set your dates

    Enter the start date, submission date, buffer and meeting interval.

  3. 3
    Edit the tasks

    Rename tasks, change weeks and overlaps, reorder them or add your own.

  4. 4
    Check the fit

    Read the spare or missing weeks and scale the plan to fit if needed.

  5. 5
    Track progress

    Enter the percentage done and see which tasks are behind on the Gantt chart.

  6. 6
    Export

    Download the .ics calendar, CSV or SVG chart, or print the plan.

Informazioni su questo strumento

A dissertation is a long project with a fixed end. The submission date rarely moves, so the sensible way to plan is backwards: start from the deadline, keep a buffer for printing, binding and the unexpected, and work out when each stage has to finish. This planner does that for you. List the stages in order with their length in weeks, such as proposal, ethics application, the waiting time for approval, reading, data collection, analysis, writing, the draft to your supervisor, feedback and final revisions. Each task can overlap the one before it, so you can read while ethics approval is pending or start analysing early data while collection continues. Milestones such as the submission of a full draft are points in time with no length. The planner shows the exact start and end date of every task, whether the plan fits between your start date and the deadline, and how many weeks are spare or missing. If it does not fit, Scale to fit stretches or shrinks the durations in proportion. Supervisor meetings repeat every chosen number of weeks. Enter how far each task has got and the planner compares it with where it should be today, marking tasks that are behind, overdue or not yet started. The Gantt chart draws every task in phase colours, with progress filled in, a line for today and a line for submission.

Back from the deadline or forward from the start

In backwards mode the last task ends on the submission date minus your buffer. Every earlier task ends when the next one starts, or later by the number of overlap weeks. If the first task then starts before your start date, the plan is too long. In forwards mode the first task starts on your start date and the planner shows whether the last one ends before the buffer. Waiting tasks such as an ethics review or supervisor comments are drawn with a dashed outline, because the time is not yours to control. The calendar export adds an all-day deadline for every task end, the submission date and each supervisor meeting, with a reminder three days before.

Worked example

The Master's template runs from 18 May 2026 to submission on 4 September 2026 with a one-week buffer, so the last task ends on 28 August. Eleven tasks with 19.5 weeks of work fit into 14.6 weeks of calendar time because of overlaps: the four-week literature review runs from 25 May to 22 June, three of those weeks alongside the ethics wait, and data analysis starts on 13 July, a week before collection ends. The plan fits with no days to spare. Fortnightly meetings from 20 May give eight sessions before submission. Mark the first four tasks done and data collection half done, set today to 20 July 2026, and overall progress is 50.6% against 65.4% expected, with two tasks behind. Move the start date to 15 June and the plan is four weeks short until you scale it to fit.

Limits

The planner schedules in whole days from your weeks and does not know about holidays, fieldwork seasons or your university's rules on extensions. Progress figures are only as good as the percentages you enter. Templates are examples: agree the real plan with your supervisor.

Esempio svolto

Master's template: 18 May to 4 September 2026, last task ends 28 August, fits exactly; 8 supervisor meetings.

In breve

Domande frequenti

How do I plan a dissertation timeline backwards?

Set the submission date and a buffer, then list the stages in order with their length. The planner works back from the deadline and gives each stage a start and end date. If the first stage would start before your start date, you know the plan is too long.

What is the overlap column for?

It lets a task start that many weeks before the task above it ends. Use it for work that can run in parallel, such as reading during an ethics review or analysing the first data while collection is still going.

Can I add the deadlines to Google Calendar or Outlook?

Yes. Download the .ics calendar file and import it. Each task end, the submission date and every supervisor meeting become all-day events with a reminder three days before.

How is progress judged?

For each task the planner works out how much of its time has passed by today and compares that with the percentage you entered. A task more than ten points behind is marked behind, and one past its end date and not finished is overdue.

What does Scale to fit do?

It multiplies every task length and overlap by the same factor so the plan exactly fills the time between your start date and the deadline minus the buffer. Milestones stay as they are. Check the result, since some tasks cannot be shortened.

Can I use it for a PhD thesis?

Yes. The UK PhD template covers three years, with a confirmation report, two studies, writing and revisions, and the US template starts after the proposal defense. Edit the tasks to match your own programme.