Control Plan Builder (APQP) Linked to the PFMEA
Write a prototype, pre-launch or production control plan row by row, link each characteristic to its PFMEA failure mode and ratings, check the gaps and export to Excel or print.
Funziona nel tuo browser. I tuoi file non lasciano mai il dispositivo. Scopri come verificarlo
…
Come si usa
- 1Fill in the header
Enter the plan number, part, change level, team, phase and dates.
- 2Add characteristics
Add rows for each process step, or import your PFMEA as CSV to start from its failure modes.
- 3Write the controls
Give each row its spec, measurement technique, sample size, frequency and control method.
- 4Add reaction plans
State what happens when a result is out of specification for every row.
- 5Clear the checks
Fix the gaps the checks list and set CC or SC classes where suggested.
- 6Export and print
Download the Excel workbook or print the plan in landscape for the line.
Informazioni su questo strumento
A control plan is the document that tells the shop floor how every important product and process characteristic is checked: what the specification is, which gauge measures it, how many parts, how often, how the result is recorded, and what the operator must do when it goes wrong. In APQP it is written three times, for prototype, pre-launch and production, and it must agree with the process flow and the process FMEA, because each failure mode the PFMEA relies on a control to catch must appear in the plan. In practice the PFMEA and the control plan live in separate spreadsheets that drift apart. This builder keeps the PFMEA link on every row: the failure mode with its severity, occurrence and detection ratings sits next to the control. From those ratings it suggests critical and significant characteristic classes, flags rows with no reaction plan, missing gauge studies or a critical characteristic without error-proofing, and keeps several plans and phases side by side. You can start from a PFMEA exported as CSV, including the FMEA worksheet on this site, and finish with an Excel workbook or a landscape printout in the AIAG column order.
The columns
Each row has the part or process number and operation name, the machine or tool, the characteristic number that matches the balloon on the drawing, the product or process characteristic, the special characteristic class, the specification, the evaluation or measurement technique, sample size and frequency, the control method and the reaction plan. Specifications can be typed as nominal and limits, which the tool formats as 12.000 +0.018/-0.010 mm or ±0.10 mm when the tolerance is equal, or as text for attributes and standards. The PFMEA columns hold the failure mode and the S, O and D ratings, and the RPN is worked out for reference.
Special characteristics and checks
Many customer manuals class a characteristic as critical when a failure could affect safety or legal compliance, usually severity 9 or 10, and as significant when it affects fit or function and the cause is likely enough to need statistical control. The rule used here is an example you can change on the header tab. When a row's ratings meet the rule but no class is set, the tool suggests one. The checks also look for missing specs, techniques, sample plans, control methods and reaction plans, a critical characteristic controlled only by sampling, special characteristics with no gauge R&R reference, duplicated characteristic numbers and high RPN lines without strong controls.
Worked example
The sample is a production control plan for a steering column bracket with five process steps and seven characteristics. The bore diameter is a significant characteristic with a specification of 12.000 +0.018/-0.010 mm, checked with an air gauge on five parts every hour and charted on an X-bar R chart; its PFMEA line has severity 7, occurrence 4 and detection 3, an RPN of 84. The tapped M8 hole is critical at severity 9, so it is checked on every part by an in-machine probe that rejects automatically. The coating thickness is 8 – 15 µm, significant, and its RPN is 112. The final visual check has the highest RPN in the plan, 120. Every row passes the checks. Adding a hardness row at severity 9 with no specification, no reaction plan and a sample of one per lot raises three problems at once, including a critical characteristic without full inspection or error-proofing.
Limits
This builder follows the column layout of the AIAG manual but is not a copy of it and is not an approval of your plan. It does not replace the cross-functional team, your customer's special characteristic symbols and rules, or a full PFMEA with action priority; the class rule shown is an example only. Measurement system and capability results are referenced, not calculated here.
Esempio svolto
Bore 12.000 +0.018/-0.010 mm, SC, 5 parts hourly, S7 O4 D3 = RPN 84; the plan has 5 steps, 7 characteristics, 1 CC, 2 SC and a top RPN of 120.
In breve
- Categoria: Aziende e lavoro
- Funziona nel browser, senza registrazione né caricamento.
- Le informazioni che inserisci restano sul tuo dispositivo.
- Disponibile in inglese.
- Contenuto rivisto l'ultima volta il:
- Fonte ufficiale: AIAG Advanced Product Quality Planning and Control Plan
Domande frequenti
What is the difference between prototype, pre-launch and production plans?
A prototype plan covers checks during prototype builds, a pre-launch plan adds extra inspection for the first production runs, and the production plan is the long-term version. Copy to next phase starts the next plan from the current rows.
How is the plan linked to the PFMEA?
Each row stores the PFMEA failure mode and its severity, occurrence and detection ratings. When you change a rating, the RPN and class suggestion update, and the export carries the link so reviewers can trace each control to its risk.
Can I import my PFMEA?
Yes. Save it as CSV with columns such as step, process, requirement, failure mode, S, O, D, current prevention and current detection. Each failure mode becomes a row ready for you to add the spec, technique and reaction plan.
Does the Excel export keep the columns?
Yes. It writes a workbook with the header block and the AIAG columns on one sheet and the check results on a second sheet. Excel, LibreOffice and Numbers open it directly.
What should a reaction plan say?
What the operator does straight away when a result is out of specification: stop or contain, segregate suspect parts back to the last good check, correct the process, and record or escalate it, for example through an NCR.
Is the RPN used to decide priorities?
It is shown for reference only. The AIAG and VDA FMEA handbook of 2019 uses action priority instead of RPN, and many customers now ask for it. Use your PFMEA tool for the priority decision.