Construction Submittal Log
Log each submittal with its specification section, item, type, supplier and submission number, record when it was sent and returned, set the review status, and see which reviews are overdue and which pending items are needed on site within two weeks.
Funziona nel tuo browser. I tuoi file non lasciano mai il dispositivo. Scopri come verificarlo
…
Come si usa
- 1Settings
Set the project and review period.
- 2Add
Enter number, section, item and type.
- 3Send
Record the supplier and date sent.
- 4Return
Enter the status, date and comments.
- 5Chase
Follow the overdue and site-date flags.
Informazioni su questo strumento
The Construction Submittal Log tracks the product data, shop drawings, samples, calculations, test reports, warranties and O&M manuals that a contractor sends to the design team for review before materials are ordered or installed. Each entry has a submittal number, the specification section it belongs to (MasterFormat numbers such as 03 30 00 Cast-in-place concrete work well, but any section reference is accepted), the item or product, the type, the subcontractor or supplier it came from and a submission number, where 0 is the first submission and 1 or higher counts resubmissions. You record the date it went for review, the date it came back and the review status: Pending, Approved, Approved as noted, Revise and resubmit or Rejected. A Needed on site by date records when the approved item has to be available, and reviewer comments can be pasted in. The review due date is worked out by adding the review period from the settings, 14 days at the start, to the date sent. A pending submittal whose review due date has passed is flagged OVERDUE. A pending submittal that is needed on site within the next two weeks is marked site date at risk, because the review, ordering and delivery may not fit in the time left. The board view shows submittals as cards in columns by review status, and the Summary tab groups them by specification section with a count of approved items.
Who this is for
Project engineers and document controllers who chase submittals, subcontractors and suppliers preparing them, architects and engineers who review them, and site managers who need materials approved in time for the programme.
How to use it
1. Enter the project and the review period in days. 2. Add each submittal with its number, specification section, item and type. 3. Record the supplier, submission number and date sent for review. 4. When it returns, enter the date returned, status and reviewer comments. 5. Watch the overdue and site-date flags and chase the reviews that are late.
What the sample shows
Three submittals are in the example. The C32/40 concrete mix design under 03 30 00 was sent on 20 September, returned on 29 September and approved, well before it was needed on 5 October. The window shop drawings under 08 52 00 are submission 1, after the first submission came back with a sill detail to revise; they were sent on 27 October, so the review is due on 10 November, with the windows needed on site by 30 November. The lobby porcelain tile sample under 09 30 00 went on 1 November and is due back on 15 November. The stat cards show 3 submittals, 2 pending, 0 overdue reviews in early November and 1 resubmission.
Alerts and dates
The insights panel lists every pending submittal at risk against its site date and every one with the status Revise and resubmit, quoting the reviewer comments. The Submittal reviews due tab lists pending reviews by date and exports them as an .ics calendar file, which helps when you chase reviewers a few days before the due date.
Numbering submittals
A clear number makes a submittal easy to find in emails and meeting minutes. A common pattern is the prefix SUB, the specification section and a running number within that section, then a separate submission number for each resubmission, so the window drawings stay one submittal however many times they go back. Keep the reviewer's stamp wording in the comments field so the reason for each status is on record.
Exports
Export CSV gives a log that opens in Excel for the weekly meeting, Print / PDF report prints it with the summary by section, and Backup (JSON) moves the full log to another device.
Limits
The review period is a setting, not a contract term; your contract or specification may give a different period for each type of submittal, so adjust the setting or the dates to match. The log does not hold the submitted files. Approval status is what you record, and an approved submittal does not relieve anyone of their contract obligations. Data stays in this browser. This log is an administrative aid and not legal or contractual advice.
Esempio svolto
Window shop drawings, submission 1, sent 27 October with a 14-day review: due 10 November. Sample totals 3 submittals, 2 pending, 1 resubmission.
In breve
- Categoria: Aziende e lavoro
- Funziona nel browser, senza registrazione né caricamento.
- Le informazioni che inserisci restano sul tuo dispositivo.
- Disponibile in inglese.
- Contenuto rivisto l'ultima volta il:
- Fonte ufficiale: CSI MasterFormat sections; common submittal review practice
Domande frequenti
What counts as a submittal?
Anything the contractor sends for the design team to review before ordering or installing: product data, shop drawings, samples, calculations, test reports, warranties and operation and maintenance manuals.
How is the review due date calculated?
The log adds the review period from the settings, 14 days unless you change it, to the date sent for review. Change the setting to match your contract.
What does site date at risk mean?
The submittal is still pending and the Needed on site by date is less than two weeks away, so approval, ordering and delivery may not happen in time.
How do I record a resubmission?
Add a new entry or update the existing one with the submission number raised to 1, 2 and so on. The stat card counts entries with a submission number above 0.
Do I have to use MasterFormat numbers?
No. The specification section is a free text field, so you can use NBS clauses, your own section numbers or MasterFormat sections.
Can I share the log with the design team?
Yes. Export CSV for a spreadsheet, or print the log to PDF and send it. The log itself stays in your browser.