Construction RFI Log and Form
Number each request for information, record the drawing or specification reference, the question and your proposed solution, let the response date fill in from your default period, log the answer and any cost or time impact, and print a signed RFI form or the whole log.
Funziona nel tuo browser. I tuoi file non lasciano mai il dispositivo. Scopri come verificarlo
…
Come si usa
- 1Settings
Enter the project and default response days.
- 2Raise
Add the RFI number, reference and question.
- 3Send
Record the date sent and a proposed solution.
- 4Answer
Log the response, date and any impact.
- 5Print
Print the RFI form or the full log.
Informazioni su questo strumento
The Construction RFI Log and Form keeps every request for information on a project in one numbered register, from the moment a question is raised on site to the day the designer answers it. Each entry holds the RFI number, a short subject, the person it goes to (architect, structural engineer, services consultant), the drawing or specification clause it refers to, the question itself and a proposed solution if you have one. Offering a solution is good practice because it gives the designer something to accept or reject rather than a blank question. You then record the date sent and, if the contract or the designer has agreed a specific date, the date a response is needed. When that field is left empty, the log works out the due date by adding the default response period from the settings, which starts at 7 days, to the date sent. Once the answer arrives you type it in with the date answered, and the log calculates the turnaround in days. Two impact fields, for cost and for time, take None, Possible or Yes, so the commercial team can see at a glance which questions might turn into a variation or an extension of time claim. A status of Open, Answered or Closed drives the board view, where each RFI appears as a card that you can move between columns. Sketches and site photos can be attached to an RFI and print with its form.
Who this is for
Site managers and engineers who raise questions about drawings, document controllers who keep the RFI register, quantity surveyors watching for cost and time impact, and small contractors who need a tidy RFI form without buying a project platform.
How to use it
1. Set the project name, your company and the default response time in days. 2. Add an RFI with its number, subject, recipient, drawing reference and question. 3. Write a proposed solution where you can and record the date sent. 4. When the answer comes back, enter it with the date answered and close the RFI. 5. Print the RFI form for signature, or print the full log for the progress meeting.
What the sample shows
The example project, Riverside Apartments Block B, has three RFIs. RFI-001 asks the structural engineer about a lintel over the kitchen opening on drawing S-201 rev B. It was sent on 20 October with no agreed date, so the due date becomes 27 October, and the answer came back on 24 October, a turnaround of 4 days. It is closed with a possible cost impact. RFI-002, about fire stopping at riser B3, had an agreed response date of 4 November and is still open, so after that date the log flags it as OVERDUE. RFI-003 asks whether the lobby floor is porcelain tile or vinyl, sent on 2 November and due on 9 November. Because its cost impact is marked Yes, the insights panel reminds you to give notice under the contract if needed.
Numbers in the summary
The stat cards count all RFIs, the open ones (any status other than Answered or Closed), the overdue ones and the average response time in days across answered RFIs. In the sample that is 3 RFIs, 2 open, 1 overdue once 4 November has passed, and an average of 4.0 days. The RFI responses due tab lists every open RFI by due date and can export the list as an .ics file for Outlook, Google Calendar or Apple Calendar.
Forms and exports
The RFI form prints the project and company, the recipient, the reference, the question, the proposed solution, the impacts, a box for the response and signature cells for the person raising it, the person answering and the date. Export CSV gives a file that opens in Excel, Backup (JSON) saves the full log including photos, and Print / PDF report prints the register with its summary.
Limits
The default response period is a setting in this tool, not a contract term; check your contract for the time allowed and type the agreed date where one applies. The cost and time flags are reminders for your own team and are not a notice to the client. Records are kept only in this browser on this device, so export a backup regularly and before clearing browser data. This register is a record-keeping aid and not legal or contractual advice.
Esempio svolto
Riverside sample: 3 RFIs, 2 open; RFI-001 answered in 4 days; RFI-002 overdue after 4 November; RFI-003 flagged for a cost impact.
In breve
- Categoria: Aziende e lavoro
- Funziona nel browser, senza registrazione né caricamento.
- Le informazioni che inserisci restano sul tuo dispositivo.
- Disponibile in inglese.
- Contenuto rivisto l'ultima volta il:
- Fonte ufficiale: Common construction contract practice for requests for information (RFI)
Domande frequenti
What is an RFI in construction?
A request for information is a formal written question from the contractor to the designer or client when the drawings or specification are unclear, conflict or are missing detail. The numbered log proves when each question was asked and answered.
How is the response date worked out?
If you type a Response needed by date, that date is used. If you leave it empty, the log adds the default response time from the settings, 7 days to start with, to the date sent.
When is an RFI marked overdue?
When its status is anything other than Answered or Closed and its due date is earlier than today. The flag clears as soon as you change the status.
Can I attach sketches or photos?
Yes. Add photos to each RFI; they are shrunk, stored in this browser and printed below the RFI form. The JSON backup carries them to another device.
Does the log open in Excel?
Export CSV produces a comma-separated file that Excel, Google Sheets and Numbers open directly. The log does not write a native .xlsx file.
Does marking a cost impact notify the client?
No. The cost and time impact fields only flag the RFI in your log and insights. Any notice required by your contract has to be issued separately in the form the contract asks for.