Calculadora de salarios para la construcción

Seleccione su nivel de CW, sector y oficio, ingrese horas normales, sábados y domingos, y vea el salario semanal con las indemnizaciones y las horas RDO que acumula.

Se ejecuta en tu navegador. Tus archivos nunca salen de tu dispositivo. Cómo comprobarlo

…

Cómo hacerlo

  1. 1
    Elige tu nivel

    CW/ECW de 1 a 8.

  2. 2
    Elige tu sector

    General o residencial.

  3. 3
    Escoge tu oficio

    Para el dinero de las herramientas.

  4. 4
    Introduzca sus horas

    Normalmente, el sábado y domingo.

  5. 5
    Leer el total

    Pay, allowances and RDO hours.

Sobre esta herramienta

The Building and Construction General On-site Award covers labourers, tradespeople and plant operators working on building sites. From 1 July 2026, the minimum hourly rate runs from A$27.20 for a CW/ECW 1 at level d to A$33.86 for CW/ECW 8, with A$29.45 for a qualified tradesperson at CW/ECW 3. Weekend work is overtime: Saturday is paid at 150% for the first two hours and 200% after that, and Sunday at 200%. Every employee gets an industry allowance each week, and tradespeople get a tool allowance. Full-time workers on a 38-hour week accrue rostered days off.

Who this is for

Carpenters, bricklayers, labourers, roof tilers, painters, plant operators and builders working out site wages.

CW levels

CW/ECW 1 has four entry steps for labourers. CW/ECW 2 covers more experienced labourers and some operators. CW/ECW 3 is a qualified tradesperson. Levels 4 to 8 cover tradespeople with extra skills, leading hands and advanced roles.

Industry allowance

The industry allowance compensates for the conditions of site work. From 1 July 2026 it is A$67.15 a week for general building and A$53.72 for residential work. It is paid for all purposes of the award, including leave.

Tool allowances

Tradespeople who supply their own tools get a weekly tool allowance: carpenters A$41.22, bricklayers A$29.26, roof tilers A$21.59 and painters A$9.89, among others.

Weekend overtime

Saturday work is paid at 150% for the first two hours and 200% after that. Sunday is 200% for all hours. Casuals add 25% to these rates.

Rostered days off

A full-time employee works 40 hours a week but is paid for 38, accruing 0.4 hours a day toward a rostered day off. Over a four-week cycle that is a paid 8-hour RDO.

Inclement weather

When work stops because of inclement weather, employees are paid for up to 32 hours in each four-week period. Enter hours lost to see how they are treated.

A worked example

A carpenter at CW/ECW 3 on general building working 38 ordinary hours and 4 hours on Saturday earns about A$1,119 for ordinary time, A$206 for Saturday, A$67.15 industry allowance and A$41.22 tool allowance, about A$1,434 before tax.

## Checking your classification Many labourers start at CW/ECW 1 and move to CW/ECW 2 once they gain skills such as operating machinery or working at heights with the right tickets. Tradespeople with extra qualifications or responsibility can move to CW/ECW 4 and above. If your duties have changed, ask your employer to review your classification in writing.

Weekday overtime

Work beyond eight hours on a weekday is overtime, paid at 150% for the first two hours and 200% after that. The calculator does not include weekday overtime, so add it separately if you work long days.

Superannuation and leave

Construction workers are entitled to super at 12% of ordinary time earnings, including the industry allowance. Many states also have portable long service leave schemes for the building industry, which follow you from employer to employer. Check that your employer is registered and paying contributions.

Limits

Indicative only, using published minimum rates; it is not legal advice. Many sites work under enterprise agreements with higher rates; use those if they apply.

Ejemplo práctico

Un carpintero que trabaja 38 horas y 4 sábados gana unos $1.434 por semana con las asignaciones.

Datos rápidos

Preguntas frecuentes

¿Cuánto gana un comerciante?

Al menos A$29,45 la hora en CW/ECW 3 a partir del 1 de julio de 2026.

¿Cómo se paga el sábado?

150% durante las primeras dos horas, luego 200%.

¿Cuál es la asignación de la industria?

67,15 dólares a la semana para el edificio general, 53,72 dólares para los residenciales.

¿Cuánto es la asignación de herramientas del carpintero?

41,22 dólares a la semana.

¿Cómo funcionan las RDO?

Una semana de 40 horas pagada como 38 horas acumula 0,4 horas al día para un día libre.

¿Se ha guardado algo?

No, todos los cálculos ocurren en tu navegador.

Totalmente gratisSin coste, sin registro
Tus archivos son privadosTodo se ejecuta en tu navegador
Fácil en tu idiomaDisponible en muchos idiomas