Short-Circuit Current Calculator
Enter the transformer, upstream fault level and each cable run to see the maximum three-phase and minimum earth fault current at every board and check breaker breaking capacity.
Läuft in Ihrem Browser. Ihre Dateien verlassen nie Ihr Gerät. So prüfen Sie es
…
So geht's
- 1Enter the transformer
Type kVA, uk %, load losses and secondary voltage.
- 2Set the source
Enter the upstream fault level or 0, and pick the voltage tolerance.
- 3Add cable runs
List each run from the transformer outward with length, size, material and parallels.
- 4Enter breaker capacities
Type the Icu of the device at the end of each run.
- 5Read the results
Check maximum and minimum currents, peak current and the pass or fail column.
- 6Report
Press Report for a printable study or CSV for a spreadsheet.
Über dieses Tool
Every protective device must be able to break the largest fault current that can flow where it is installed, and it must also trip fast enough on the smallest fault at the end of its circuit. Both numbers come from the impedance between the source and the fault. In a typical low-voltage building the transformer dominates near the intake, and cable resistance takes over further out. This calculator follows the simplified impedance method of IEC 60909-0 for a radial low-voltage system. It works out the upstream network impedance from the fault level the utility gives you, the transformer impedance from its rating, short-circuit voltage uk and load losses, and then adds each cable run in order. At every point it shows the maximum three-phase fault current with the voltage factor c max, the peak current that the busbars and breakers must withstand mechanically, the minimum single-phase to earth fault current with c min and hot conductors, and a pass or fail against the breaking capacity you enter. A single-line summary shows the whole chain at a glance, and the results print as a short study you can attach to a design file.
Transformer and source
The transformer impedance is Z = uk × U² / S. Its resistance comes from the load losses Pk, R = Pk × U² / S², and the reactance is what remains. If you do not have the test report, the Typical Pk button fills a usual value for that rating. The upstream network adds a small impedance based on the fault level at the high-voltage side; enter 0 to treat it as an infinite bus, which gives the most pessimistic result.
Cable runs
Each run has a length, a size, copper or aluminium, the number of parallel cables, a reactance per metre (0.08 mΩ/m is typical for multicore cables) and the Icu of the breaker at the end. Runs add in the order listed, so list them from the transformer outward. Arrows reorder them and the cross removes one.
Maximum and minimum
For breaking capacity the calculator uses c max of 1.05, or 1.10 for systems with a +10 % voltage tolerance, and conductors at 20 °C. For the minimum earth fault it uses c min 0.95, a protective conductor equal to the line conductor and conductors warmed to 80 °C. Compare the minimum figure with the instantaneous trip current of each breaker to see whether it will clear quickly.
Peak current
The peak factor κ = 1.02 + 0.98 e^(−3R/X) is near 2 close to large transformers where reactance dominates, and drops further out. Busbar supports and breaker making capacity are rated for this peak.
Limits
This is not a substitute for a licensed engineer's fault study. Motor contribution, generators, meshed networks and current-limiting devices upstream are not modelled; in these cases use full IEC 60909 software and the manufacturer's cascading tables.
Rechenbeispiel
A 1,000 kVA, 400 V transformer has uk 6 % and Pk 10.5 kW, fed from a 500 MVA network. Its impedance is 0.06 × 400² / 1,000,000 = 9.6 mΩ, and the fault at the LV terminals is 1.05 × 400 / (1.732 × 9.94 mΩ) = 24.4 kA, with a peak of about 55 kA. After 15 m of four parallel 240 mm² copper cables to the main switchboard the current is still about 23.6 kA, so a 50 kA breaker passes. A further 60 m of 95 mm² brings the sub-board to about 12.1 kA, within a 25 kA device, and 35 m of 4 mm² to the end of a final circuit gives about 1.4 kA, where a 6 kA device is enough. The minimum earth fault there is about 0.52 kA.
Kurzinfos
- Kategorie: Technik & Bau
- Läuft in Ihrem Browser, ohne Anmeldung, ohne Upload.
- Ihre Eingaben bleiben auf Ihrem Gerät.
- Auf Englisch verfügbar.
- Inhalt zuletzt geprüft:
- Offizielle Quelle: IEC 60909-0:2016; IEC 60947-2
Häufig gestellte Fragen
Where do I get the upstream fault level?
Ask the electricity network operator for the fault level at your supply point. If you cannot get it, enter 0 for an infinite bus; the result will be slightly higher than reality, which is safe for breaking capacity.
What is the difference between Icu and Ics?
Icu is the rated ultimate short-circuit breaking capacity under IEC 60947-2; Ics is the service breaking capacity, after which the breaker must keep working. Many designs require the prospective current to be below Ics.
Why is the minimum earth fault current important?
The protective device must disconnect within the required time at the smallest fault. If the minimum current is below the breaker's instantaneous trip current, the circuit may take too long to clear and touch voltages stay dangerous.
What reactance should I enter for a cable?
About 0.08 mΩ/m for multicore cables and 0.1 to 0.15 mΩ/m for spaced single-core cables. The maker's data sheet gives the exact value.
Does it include motor contribution?
No. Running motors feed the fault for a few cycles. Where large motors are connected, add their contribution as IEC 60909 describes or use full study software.
Can I save a study for each building?
Yes. Save named scenarios in this browser, back them up as JSON, and print a report with the inputs, results and the single-line summary.