Sales Pipeline Weighted Forecast Calculator

Import or type your CRM deals with stage, amount and dates, set stage probabilities, a period and a quota, and see the weighted forecast, coverage, win rate, velocity and deals to clean up.

Läuft in Ihrem Browser. Ihre Dateien verlassen nie Ihr Gerät. So prüfen Sie es

…

So geht's

  1. 1
    Set the period

    Choose start and end dates, today's date and the quota.

  2. 2
    Load deals

    Import a CRM CSV or type deals in the grid.

  3. 3
    Tune stages

    Edit stage names, probabilities and forecast categories.

  4. 4
    Read the forecast

    Check won, weighted, commit, best case and coverage.

  5. 5
    Clean up

    Update or close the stale deals listed on the Forecast tab.

  6. 6
    Export

    Download the weighted pipeline CSV and review the per-owner table.

Über dieses Tool

A raw pipeline total tells you very little: a deal that has just been qualified and one waiting for a signature count the same. A weighted forecast multiplies each open deal by the probability of its stage, adds what has already been won in the period and gives a number a manager can defend. This calculator does that from a simple deals list, without a paid CRM add-on. Each deal has a name, owner, stage, amount, created date, expected close date, status (open, won or lost) and, if you want, its own probability that overrides the stage default. Stages are editable, with a probability and a forecast category of pipeline, best case or commit. Choose the period, for example a quarter, enter the quota and the date to treat as today. The tool reports won revenue in the period, the weighted forecast, commit and best-case totals, pipeline coverage of the remaining quota, win rate by count and by value, average won deal size, average sales cycle in days and sales velocity, plus a chart by close month, a stage table, a per-owner table and a list of stale deals.

How the forecast is built

Only open deals with an expected close date inside the period count toward the period forecast. Weighted forecast is won revenue plus the sum of each open deal's amount times its probability. Commit adds deals in commit stages at full value, and best case adds best-case and commit stages. Coverage divides open pipeline closing in the period by the quota still to be won; many teams want about three times coverage early in a quarter.

Win rate, cycle and velocity

Win rate counts won deals against all closed deals, and the value version weights by amount. Sales cycle is the average number of days from creation to close for won deals. Sales velocity multiplies open deals by average won deal size and win rate, then divides by cycle length, giving the revenue the pipeline produces per day at its current pace.

Stale deals

Open deals with a close date already in the past, or created longer ago than the age limit you set, are listed so they can be updated or closed out. Stale deals are the main reason pipeline totals look healthier than reality.

Limits

Stage probabilities are assumptions; calibrate them with your own history of which deals reached each stage and were later won. The tool does not track changes over time or deal history, and it is a planning aid rather than a guarantee of revenue.

Rechenbeispiel

The loaded example is a fourth-quarter forecast with a quota of 480,000, today set to 3 November 2026. Two deals worth 139,000 are already won in the period. Five open deals close in the quarter for 287,000, weighted to 155,400, so the forecast is 294,400. Commit is 203,000 and best case 404,000. Coverage is only 0.84 times the remaining 341,000, a clear warning. Over all closed deals the win rate is 67 percent by count and 64 percent by value, the average won deal is 50,250, the cycle is 86 days and sales velocity is about 2,330 a day. The Adatum deal is flagged because its close date has passed.

Kurzinfos

Häufig gestellte Fragen

What is a weighted pipeline?

The sum of each open deal's amount multiplied by its probability of closing, usually set by sales stage.

What pipeline coverage do I need?

A common rule is three times the remaining quota at the start of a period, less later in the period. The right number depends on your win rate.

How is sales velocity calculated?

Number of open opportunities times average deal size times win rate, divided by the length of the sales cycle in days.

Can I override the stage probability?

Yes. Type a probability on a deal and it replaces the stage default for that deal only.

Which CRM exports work?

CSV exports from HubSpot, Pipedrive, Salesforce and most other CRMs work when they include deal name, owner, stage, amount and dates; common column names are matched automatically.

Is my pipeline uploaded?

No. Everything is calculated in your browser.

Völlig kostenlosKeine Kosten, keine Anmeldung
Dateien bleiben privatAlles läuft in Ihrem Browser
Einfach in Ihrer SpracheIn vielen Sprachen verfügbar