Rotating Shift Schedule Planner (DuPont, Panama, 4-on-4-off)

Pick a rotation pattern and start date, put staff into crews, change cells by tap, approve swaps and check cover against minimum staffing.

Läuft in Ihrem Browser. Ihre Dateien verlassen nie Ihr Gerät. So prüfen Sie es

…

So geht's

  1. 1
    Choose a pattern

    On Pattern and staff, pick a rotation pattern and the cycle start date, and set how many days to show.

  2. 2
    Add staff

    Add each person and assign them to a crew; crews follow the pattern with their own offset.

  3. 3
    Set shift codes

    Edit each code's label, start time, hours, colour and minimum staff.

  4. 4
    Adjust the roster

    On Roster, pick a brush such as Leave and tap cells to record changes.

  5. 5
    Handle swaps

    On Swaps, add requests and set them to Approved when agreed.

  6. 6
    Check and share

    On Cover and hours, review gaps and hours, then print the roster or export CSV and calendar files.

Über dieses Tool

Round-the-clock operations such as plants, hospitals, control rooms, security and utilities usually run on a rotating pattern: a fixed sequence of day shifts, night shifts and days off that each crew follows, offset so that every shift is always covered. This planner includes the common patterns. DuPont is a 28-day cycle of four nights, three off, three days, one off, three nights, three off, four days and seven off. Panama 2-2-3 works two on, two off, three on in a 14-day cycle and switches between days and nights every two weeks. Four-on-four-off alternates four 12-hour days and four nights with four days off between, and the southern swing rotates 8-hour day, evening and night shifts a week at a time. With four crews each pattern gives exactly one crew on each shift every day. Pick a pattern and a cycle start date, put your people into crews, and the roster fills itself. You can also type your own sequence of letters and crew offsets for a pattern that is not in the list.

Changing the roster

Tap a cell to change it. Choose Leave, Training, Off or any shift code as the brush and tap the cells to paint; choose Pattern and tap again to remove a manual change. Changed cells have a thick border so they stand out. Shift codes are editable: label, start time, length in hours, colour and the minimum number of staff each shift needs.

Swaps, cover and fairness

Record swap requests with a date, the two people, the status and a reason. When a swap is approved, the two people's shifts on that date are exchanged in the roster. The cover tab shows a heat map of how many people are on duty in every hour of every day, including night shifts that started the day before, lists every shift below its minimum, and gives each person's shifts, nights, hours, average weekly hours and longest run of consecutive working days, so long runs that cause fatigue are easy to spot.

Export

Print a landscape roster with colours, export the roster as CSV for a spreadsheet, download a calendar file of one person's shifts for their phone, save the whole plan as JSON and keep scenarios to compare patterns.

Limits

The planner does not check working-time laws, rest rules or overtime; it shows hours and runs so you can check them yourself. It is a planning aid, not legal advice.

Rechenbeispiel

A control room runs 12-hour shifts from 07:00 and 19:00 with eight staff in four crews of two, on DuPont from Monday 2 November 2026. Every day has one crew of two on days and one crew of two on nights, so the cover map shows two people in every hour. Over the 28-day cycle each person works 14 shifts, 168 hours, an average of 42 hours a week. Alex books leave on 10 November, a day shift, so the day shift drops to one person and the planner flags a cover gap until someone is painted in. Bea asks to swap 5 November with Chris; once approved, their shifts that day change places.

Kurzinfos

Häufig gestellte Fragen

Which rotation pattern should I use?

DuPont gives a full week off every four weeks. Panama 2-2-3 gives every other weekend off and short runs. Four-on-four-off is simple and gives long breaks. The southern swing uses 8-hour shifts. Consult the people who will work it and check local working-time rules.

How many staff do I need for 24/7 cover?

With 12-hour shifts and four crews, each crew works about 42 hours a week on average. Multiply the number of people needed on each shift by four. The cover tab shows whether your crews meet the minimum on every day.

Can I make my own pattern?

Yes. Type a sequence of letters, one per day of the cycle, using your shift codes and O for off, and set an offset in days for each crew. The cover check shows at once if a day is left empty.

What does forward rotation mean?

Moving from day to evening to night shifts, in the direction of the clock, is generally easier on sleep than moving backward. The NIOSH guide on shiftwork explains this and other design points.

How do approved swaps work?

On the swap date, each person gets the other's shift. Pending and declined swaps do not change the roster.

Can staff get their shifts in their calendar?

Yes. On Cover and hours, tap Calendar file next to a person to download an ICS file of their shifts in the shown period, which phone and desktop calendars can import.

Völlig kostenlosKeine Kosten, keine Anmeldung
Dateien bleiben privatAlles läuft in Ihrem Browser
Einfach in Ihrer SpracheIn vielen Sprachen verfügbar