Workload and Capacity Planner

Add people with weekly capacity and assign project hours per week to see utilisation per person and week, spot overloads, mark time off and export to Excel.

S'executa al teu navegador. Els fitxers mai no surten del dispositiu. Mira com comprovar-ho

…

Com es fa

  1. 1
    Set the horizon

    Choose the first week and the number of weeks.

  2. 2
    Add people

    Enter names, roles and weekly capacity.

  3. 3
    Add projects

    Create projects with colours.

  4. 4
    Assign hours

    Add assignments and enter hours per week.

  5. 5
    Check the load

    Read the colour grid and the overload list; mark time off.

  6. 6
    Export

    Download the XLSX workbook or CSV to share.

Sobre aquesta eina

When several projects share the same people, someone is usually overloaded while someone else has room, and nobody sees it until deadlines slip. This planner shows the whole picture in one grid: people down the side, weeks across the top and each cell coloured by how full that person is. Assign hours per week to projects, set each person's weekly capacity, mark weeks of leave, and the tool warns about every week over capacity. Export the plan as a real Excel workbook with two sheets or as CSV.

Who this is for

Team leads, agency owners, project managers, school timetablers and small consultancies juggling several clients.

People and capacity

Add each person with a role and weekly capacity in hours. A full-time person might have 40 hours, but planning 32 to 35 leaves room for meetings, email and surprises. Part-time staff get their real hours.

Assignments

An assignment links a person to a project with planned hours for each week. Use Fill to set the same number for every week, then adjust individual weeks as the project ramps up or down.

Utilisation

For each person and week, utilisation = planned hours ÷ available hours. Cells turn green below 90 %, amber between 90 % and 100 % and red above 100 %. Overloaded weeks are listed above the tabs.

Time off

Tap a cell in the load grid to mark that week as leave. Capacity drops to zero for that week, so any hours planned then show as a problem to solve.

Projects view

See total planned hours per project across the horizon, rename projects and change colours. Deleting a project or person removes its assignments.

Excel export

Export XLSX creates a workbook with a Load sheet (people by weeks) and an Assignments sheet (person, project, hours per week and total), with a bold header row and frozen headings. It opens in Excel, LibreOffice, Numbers and Google Sheets.

Planning tips

- Plan at the level of half-days or hours, not minutes. - Revisit the plan weekly; capacity planning is a living document. - Leave 10–20 % unplanned for urgent work.

Talking about the plan

Share the exported workbook in your weekly team meeting. A visible plan makes it easier to say no to new work, or to agree what moves when something urgent arrives.

Worked example

Aisha has 40 hours a week. In week 1 she has 30 hours on the website and 10 on the app: 100 %, amber. In week 5 the app needs 30 and the website 10: still 100 %. Ben's leave in week 4 makes his 40 planned hours show as an overload.

Limits

A planning aid for small teams; it does not track actual hours or replace HR records.

Exemple resolt

30 + 10 planned hours against 40 hours capacity: 100 % utilisation.

En resum

Preguntes freqüents

How is utilisation calculated?

Planned hours divided by available hours for that person and week.

What do the colours mean?

Green under 90 %, amber 90–100 %, red over capacity.

How do I record holidays?

Tap the person's cell for that week to mark it as time off.

Can I export to Excel?

Yes, as an XLSX workbook with two sheets, or as CSV.

How many weeks can I plan?

From 4 up to 26 weeks.

Is my data uploaded?

No. It stays in your browser.

Totalment gratisSense cost, sense registre
Els fitxers es mantenen privatsTot funciona al teu navegador
Fàcil en el teu idiomaDisponible en molts idiomes