Spare Parts Consumption Forecaster
Paste each part's monthly usage, let the tool choose a forecast method for its demand pattern, and get safety stock, reorder point, stock-out risk and what to buy now.
S'executa al teu navegador. Els fitxers mai no surten del dispositiu. Mira com comprovar-ho
…
Com es fa
- 1Add parts
On Parts, enter code, name, unit cost, on hand, on order, lead time, MOQ and service level.
- 2Enter usage
On Usage history, type monthly use per part, paste a series or import a CSV.
- 3Check the pattern
Read the pattern, ADI and CV squared, and compare methods in the back-test table.
- 4Choose methods
Keep Auto or tap Use on the method that fits a part best.
- 5Read the plan
Open Purchase plan for safety stock, reorder point, risk and the order quantity of each part.
- 6Test and print
Move the lead time and demand sliders for what-ifs, then print or export the plan.
Sobre aquesta eina
Spare parts are hard to forecast because most of them are not used every month. A bearing may go out ten times a month, but a motor or a sensor might be issued twice a year and then three at once. Ordinary averages handle the bearing and fail the motor: they forecast a fraction of a motor every month and set safety stock from a spread that is mostly zeros. This forecaster starts by classifying each part's demand with the method of Syntetos and Boylan. ADI is the average number of months between uses and CV squared measures how much the size of each use varies. Parts with ADI under 1.32 are smooth or erratic; above it they are intermittent or lumpy. Auto mode then picks exponential smoothing for regular parts, Croston's method with the SBA bias correction for intermittent and lumpy ones, and a seasonal average once a part has 24 months of history. You can override the method per part and compare all of them in a one-month-ahead back-test with mean absolute error.
Safety stock and reorder point
For each part you enter unit cost, stock on hand, stock already on order, supplier lead time in days, minimum order or pack quantity and a target service level. Safety stock is z times the monthly standard deviation of usage, scaled to the lead time, and the reorder point is daily forecast demand times lead time plus safety stock, both rounded up to whole units. Stock-out risk is the chance that demand during the lead time is larger than the stock position. When the position is at or below the reorder point, the purchase plan orders enough to reach the reorder point plus one review period of demand, rounded up to the order multiple, and totals the cost.
What-if and imports
Two sliders test a longer or shorter lead time and higher or lower demand across all parts at once, which is useful before a supplier change or a production ramp-up. Usage imports from a CSV in wide form (code, name and one column per month) or long form (code, month, quantity), as most stores systems export.
Limits
Normal-distribution risk is a rough guide for lumpy parts with few uses. For critical, slow-moving parts, a minimum stock set by the cost of downtime matters more than any forecast. Lead times are taken as fixed, and the tool does not optimise order quantity for holding and ordering cost.
Exemple resolt
Five parts with twelve months of history. The 6205 bearing is smooth (ADI 1.0, CV squared 0.03), so smoothing forecasts 10.1 a month; with a 14-day lead time and 95% service the reorder point is 7 against 14 in stock, so nothing is bought. The 2.2 kW motor is intermittent (used in 3 of 12 months, ADI 4.0). Croston SBA forecasts 0.30 a month, the reorder point is 3, and with one motor in stock the plan orders 3 at 410, or 1,230. The V-belt sits exactly at its reorder point of 3, so one pack of 4 is ordered for 51.60, and the proximity sensor is lumpy, with an order of 3 for 114. The whole plan comes to 1,395.60.
En resum
- Categoria: Negocis i feina
- S'executa al navegador, sense registre, sense pujar res.
- La informació que introdueixes es queda al dispositiu.
- Disponible en anglès.
- Contingut revisat per última vegada:
- Font oficial: Syntetos and Boylan (2005) demand categorisation and the SBA correction to Croston's method, International Journal of Forecasting
Preguntes freqüents
What is intermittent demand?
Demand that is zero in many periods. With an average interval between uses of 1.32 periods or more, Syntetos and Boylan class it as intermittent when the sizes are steady and lumpy when they vary a lot.
Why use Croston or SBA?
Croston forecasts the size of a use and the interval between uses separately, then divides them. The SBA version multiplies by 1 minus alpha over 2 to remove a known upward bias, which works better than a plain average for intermittent parts.
How is safety stock calculated?
Safety stock equals the z value for your service level times the standard deviation of monthly usage times the square root of lead time in months. At 95% service z is about 1.645.
What does the stock-out risk mean?
It is the chance that use during the next lead time exceeds what you have and have on order, assuming roughly normal demand. Treat it as a ranking signal rather than an exact probability for lumpy parts.
How much history do I need?
Twelve months is a sensible minimum and twenty-four allow a seasonal view. The back-test needs at least four months.
Does it handle minimum order quantities?
Yes. Orders are rounded up to the MOQ or pack size you enter, so a need of 0.9 belts becomes one pack of four.
