Safety Induction Checklist for New Workers and Visitors
Record each person's site safety induction, tick the twelve topics covered from site rules and fire exits to permits, welfare and emergency contacts, note their CSCS card or ticket, confirm signatures, see who is incomplete or due for renewal and print an induction record for each person.
S'executa al teu navegador. Els fitxers mai no surten del dispositiu. Mira com comprovar-ho
…
Com es fa
- 1Settings
Set the site, validity and contacts.
- 2Person
Add the name, company and card.
- 3Topics
Tick each topic as you cover it.
- 4Sign
Confirm worker and supervisor signatures.
- 5Print
Print the record and track renewals.
Sobre aquesta eina
The Safety Induction Checklist for New Workers and Visitors keeps a record of who has been inducted on a site, what they were told and when the induction runs out. Under the Construction (Design and Management) Regulations 2015, the principal contractor must make sure every worker receives a suitable site induction, and the same idea applies to factories, warehouses and offices that bring in new staff, contractors and visitors. Each record holds the date, the person's name and company, whether they are a new worker, contractor, visitor or agency worker, the topics covered, their card or ticket (for example a CSCS card), who carried out the induction and a tick to confirm that the worker and supervisor signed. Twelve topics are listed: site rules and working hours, fire alarm, exits and assembly point, first aid and first aiders, accident and near-miss reporting, PPE required on site, main hazards of the site, permits to work and restricted areas, welfare facilities, smoking and vaping areas, traffic routes and vehicle movements, emergency contacts, and housekeeping and waste. The record shows how many topics were covered out of twelve and marks the induction Complete only when every topic has been covered and the signatures are confirmed. The valid until date is the induction date plus the number of months in the settings, 12 at the start, except for visitors, whose induction is valid for the day only. The emergency contacts set in the settings print on every record.
Who this is for
Site managers and principal contractors, gatehouse and reception staff, health and safety advisers, warehouse and factory managers who induct new starters and contractors, and agencies placing workers on client sites.
How to use it
1. Set the site name, how many months an induction is valid and the emergency contacts. 2. Add a record with the person's name, company, type and card number. 3. Tick each topic as you cover it during the induction. 4. Ask the worker and the supervisor to sign and tick the signed box. 5. Print the induction record and check who is incomplete or expiring.
What the sample shows
Three inductions are in the example. Ben Walker of Northside Groundworks, a contractor with a blue CSCS card, covered all twelve topics on 2 November and signed, so his record is Complete and valid until 2 November 2027. Lena Novak, a new worker for Example Build Ltd, covered nine topics on 3 November but has not signed, so she is Incomplete; the missing topics are traffic routes, emergency contacts and housekeeping. A client visitor, R. Jones of Riverside Homes, covered six topics on 4 November and signed, with an induction valid on that day only. The stat cards show 3 inductions and 2 incomplete, and the insights list Lena Novak at 9 of 12 topics and not signed.
Renewals and companies
A stat card counts inductions of workers and contractors that expire within the next 30 days, so you can plan refresher inductions before people are turned away at the gate. The Summary tab groups people by company with the number of people and complete inductions, which helps when a subcontractor brings a new gang to site.
The induction record
Each record prints the site, date and person type, a table of all twelve topics marked with a tick or a cross, the card or ticket number, the emergency contacts, the valid until date, a statement that the person has understood the induction and signature cells for the worker, the inductor and the date.
Limits
The twelve topics are a general list; add the site-specific hazards, rules and emergency arrangements in your own induction presentation and notes. Visitors need only the first six topics (site rules, fire, first aid, reporting, PPE and hazards); workers and contractors need all twelve. Records are kept in this browser, so back them up. An induction record shows what was covered, but it is not legal or safety advice and does not prove that a person is competent for their work.
Exemple resolt
Ben Walker: 12/12 topics, signed, Complete until 2 November 2027; Lena Novak: 9/12, not signed, Incomplete. Sample totals 3 inductions, 2 incomplete.
En resum
- Categoria: Negocis i feina
- S'executa al navegador, sense registre, sense pujar res.
- La informació que introdueixes es queda al dispositiu.
- Disponible en anglès.
- Contingut revisat per última vegada:
- Font oficial: Construction (Design and Management) Regulations 2015 site induction; HSE guidance
Preguntes freqüents
What should a site induction cover?
At least the site rules, emergency arrangements, first aid, accident reporting, PPE, the main hazards, permits and restricted areas, welfare, traffic routes and who to contact. The checklist lists twelve such topics.
When is an induction marked Complete?
When all twelve topics (the first six for a visitor) are ticked and the signed box is ticked. Anything less shows as Incomplete with the number of topics covered.
How long is an induction valid?
For workers, contractors and agency workers, the number of months in the settings, 12 by default. A visitor induction is treated as valid for the day it was given.
Can I record CSCS cards?
Yes. Type the card type and number, or any other ticket such as CPCS or a passport for site access checks, in the card field. It prints on the record.
Does the tool collect signatures?
No. Print the record and have the worker and inductor sign it, then tick the signed box. Keep the signed paper copy in your site files.
Can I see all inductions for one subcontractor?
Yes. The Summary tab groups records by company with the number of people and how many inductions are complete.
