Generador de declaració del mètode de treball segur (SWMS)

Escollir el treball de construcció amb un risc elevat, fer una llista de cada pas amb els seus perills i controls, i imprimir un SWMS pels treballadors per signar.

S'executa al teu navegador. Els fitxers mai no surten del dispositiu. Mira com comprovar-ho

…

Com es fa

  1. 1
    Entreu en el treball

    Escriu l'empresa, el lloc, la tasca i el supervisor.

  2. 2
    Escollir el HRCW

    Recull fins a tres tipus de treballs d'alta risc.

  3. 3
    Lista de passos

    Afegeix cada pas amb el seu perill, risc, controls i qui és responsable.

  4. 4
    Add PPE and review

    Type the PPE and how controls will be checked.

  5. 5
    Consulta i firma

    Repassa amb els treballadors i que signin.

Sobre aquesta eina

Before high risk construction work starts, the business doing it must prepare a safe work method statement (SWMS). The model WHS Regulations list 18 kinds of high risk construction work, including work where someone could fall more than two metres, work near energised electrical services, work in trenches deeper than 1.5 metres, work disturbing asbestos, and work where powered mobile plant moves around. A SWMS must identify the high risk work, the hazards and risks, the control measures, and how the controls will be put in place, monitored and reviewed. It must be written in a way workers can understand, given to the principal contractor, kept on site and reviewed when the work changes. This generator builds a SWMS from your job steps: each with its hazard, a risk rating, the controls and who is responsible, plus PPE, monitoring and a sign-off table for workers.

Who this is for

Subcontractors, small builders, trade businesses and sole traders doing high risk construction work, and principal contractors checking SWMS from their trades.

The 18 kinds of high risk construction work

They include risk of a fall of more than 2 metres; work on telecommunication towers; demolition of load-bearing elements; disturbing asbestos; structural alterations needing temporary support; confined spaces; shafts or trenches deeper than 1.5 metres and tunnels; explosives; pressurised gas mains; chemical, fuel or refrigerant lines; energised electrical installations; contaminated or flammable atmospheres; tilt-up or precast concrete; work next to roads, railways or shipping lanes; areas with powered mobile plant; artificial extremes of temperature; water or liquid with a drowning risk; and diving work.

Writing the steps

Break the job into steps in the order they happen. For each, list: - the hazard (what could cause harm), - the risk before controls (high, medium, low), - the control measures, following the hierarchy: eliminate, substitute, isolate, engineering controls, administrative controls, then PPE, - who is responsible. Be specific to the site. "Use edge protection" is weaker than "edge protection on all open edges before roof access, checked by the supervisor each morning".

Consultation and sign-off

Go through the SWMS with workers before work starts, and have each worker sign. New workers sign when they arrive. Workers must be able to read and understand it, so consider translations or pictures.

Keeping and reviewing

Keep the SWMS on site until the work is finished and for two years if there is a notifiable incident. Review it when the work changes, after an incident, or when a control does not work. If work is not being done in line with the SWMS, it must stop until the SWMS is reviewed.

Worked example

A roofing crew replacing a metal roof on a two-storey house identifies falls from height and powered mobile plant (a crane). Steps cover scaffold and edge protection, removing old sheets, crane lifts with an exclusion zone, and fixing new sheets, each with controls and a responsible person.

Limits

A template, not a substitute for a site-specific risk assessment. Your state's WHS laws apply.

Exemple resolt

Un cobert SWMS de coberta caigudes i un elevador grúa, amb quatre passos i la signatura del treballador.

En resum

Preguntes freqüents

Quan és necessari un SWMS?

Abans de qualsevol dels 18 tipus d'obres de construcció amb risc elevat.

Qui prepara el SWMS?

L'empresa que realitza les obres de construcció d'alt risc, amb els seus treballadors.

Necessita signar-se?

Els treballadors han de signar per demostrar que l'han llegit i entès.

Quant temps he de mantenir-lo?

Fins que el treball s'acabi, i dos anys després d'un incident notificable.

Quan s'ha de revisar?

Quan el treball canvia, després d'un incident o quan un control no funciona.

S'emmagatzemen les meves dades?

Només en el teu navegador.

Totalment gratisSense cost, sense registre
Els fitxers es mantenen privatsTot funciona al teu navegador
Fàcil en el teu idiomaDisponible en molts idiomes