Pond Excavation Earthwork and Cost Calculator

Enter the top length and width (or diameter), depth and side slope of one or more ponds, and get the earth to dig in cubic feet and metres, the cost at your rate per 100 cft, labour days or excavator hours, a foot-by-foot depth table and how high the spoil can build the bank.

S'executa al teu navegador. Els fitxers mai no surten del dispositiu. Mira com comprovar-ho

…

Com es fa

  1. 1
    Describe the site

    Type the site and owner and choose feet or metres.

  2. 2
    Enter the pond

    Give the shape, top length and width or diameter, depth and side slope.

  3. 3
    Add sections

    Add more ponds or parts and enter any depth already dug.

  4. 4
    Check the section

    Look at the cross-section, bottom size, top area and water held.

  5. 5
    Price the work

    Pick rate, labour or excavator pricing and type your figures.

  6. 6
    Print the estimate

    Print or save the estimate with the depth table for the contractor.

Sobre aquesta eina

Digging or re-digging a pond is one of the commonest earthworks in rural Bangladesh, for fish farming, irrigation, a homestead pond or a public tank under a union or LGED scheme. The contractor quotes per hundred or per thousand cubic feet of earth, or per day of labour, or per hour of excavator, and the owner needs to know how many cubic feet are really in the hole. Multiplying length by width by depth overstates it, because the banks slope inward and the bottom is smaller than the top. This calculator handles the slope properly. For a rectangular pond it uses the prismoidal formula, which is exact for a pond whose sides slope evenly; for a round pond it uses the frustum of a cone. You enter the top size, the depth and the side slope as horizontal feet per foot of depth, and optionally the depth that already exists if an old pond is being deepened. The tool shows the bottom size, the top area in square feet and decimals, the earth to dig in cft and cubic metres, the water the pond will hold, and draws the cross-section. You can add several ponds or sections and see the totals. The cost card prices the work by rate per 100 cft, by labour days and wage, or by excavator hours and hire, adds carrying of spoil and other costs, and shows how high a bank of given top width the loose spoil can build. A depth table gives the earth in each foot so the contractor can be paid in stages.

Why slopes matter

A pond 150 by 100 ft and 8 ft deep with vertical sides would hold 1,20,000 cft. With a side slope of 1.5 to 1 the bottom shrinks to 126 by 76 ft, and the real volume is 97,536 cft, almost a fifth less. Paying on the box figure means paying for earth that was never dug.

Choosing a slope

Firm clay can stand at about 1 to 1; sandy or silty soil needs 1.5 to 1 or 2 to 1, and fish ponds are often given gentler banks so they do not slump. The slope you choose also decides whether the full depth is possible: if the slopes meet before the bottom, the tool warns you.

Rates and outputs

The rate per 100 cft, the earth one labourer digs in a day, the wage, the excavator's output per hour and its hire are all example figures. They change with soil, water, lift and lead distance, district and season. Type the figures from your contractor's quote or the local schedule of rates.

Bulking and the bank

Dug earth loosens and takes more room; the bulking percentage turns dug volume into loose volume. The bank height is worked out for a trapezoid bank of the top width and slope you give, running round the pond.

Limits

The tool does not survey the ground, allow for uneven bottoms, rain or dewatering beyond the extra cost you type, and it is not an engineering design or an official estimate. Measure the finished pond again before final payment.

Exemple resolt

Nurul Amin plans a pond 150 ft by 100 ft at the top, 8 ft deep, with 1.5 to 1 side slopes. The bottom is 126 ft by 76 ft and the earth to dig is 97,536 cft, or about 2,762 cubic metres. At the example contract rate of Tk 400 per 100 cft the cost is Tk 3,90,144. By labour at 80 cft a day and Tk 700 wage it would be 1,219 labourer-days and Tk 8,53,440; by excavator at 1,500 cft an hour and Tk 2,500 an hour, about 65 hours and Tk 1,62,560. With 25 percent bulking the 1,21,920 cft of loose spoil can build a bank about 10 ft high with a 6 ft top round the pond. Full, it holds about 27.6 lakh litres.

En resum

Preguntes freqüents

What is cft and how is it different from cubic metres?

Cft is a cubic foot, the unit most Bangladeshi earthwork contractors use. One cubic metre is about 35.3 cft. The tool shows both.

Why not just multiply length, width and depth?

That gives the volume of a box with vertical sides. Real ponds have sloping banks, so the bottom is smaller than the top. The prismoidal formula used here gives the true volume for evenly sloping sides.

How do I enter a pond that is being re-dug?

Enter the full final size and depth, and type the depth that already exists in already dug. The tool counts only the earth between that depth and the new bottom.

Are the rates official?

No. They are examples so the tool works out of the box. Rates for earthwork, wages and excavator hire vary widely; use your contractor's quote or the current schedule of rates used by local engineers.

Can I work in metres?

Yes. Choose metres for the sizes and the tool converts them; results still show cft because that is how rates are usually quoted, with cubic metres alongside.

How do I pay a contractor in stages?

Use the depth table. It lists the earth in each foot or step of depth and the running total, so you can check the depth with a staff and pay for the volume finished.