Microsoft Project XML File Viewer

Open a project plan saved as Microsoft Project XML, browse tasks with WBS codes, dates, durations, links and slack, see a Gantt chart with critical tasks in red, check resources and export to Excel or CSV.

S'executa al teu navegador. Els fitxers mai no surten del dispositiu. Mira com comprovar-ho

…

Com es fa

  1. 1
    Save

    Export the plan as Project XML.

  2. 2
    Open

    Load the .xml file.

  3. 3
    Tasks

    Read dates, links and slack.

  4. 4
    Gantt

    View bars and critical path.

  5. 5
    Export

    Save Excel or CSV.

Sobre aquesta eina

The Microsoft Project XML File Viewer opens project plans saved in the MSPDI format, the XML that Microsoft Project writes when you choose File, Save As and the XML format. ProjectLibre, GanttProject and many planning and construction tools can export the same format. People who receive a plan from a contractor or a project manager often have no Project licence, and the viewer lets them read the schedule in a browser without one. The file stays on your computer. Every task in the file is read except blank rows and the project summary task. The Tasks tab has one row per task with its ID, WBS code, name indented by outline level, start date, finish date, duration in working days, percent complete, predecessors, assigned resources, total slack, a critical flag and its kind: task, summary or milestone. Predecessors are written the way Project shows them, as the predecessor's ID followed by the link type, FS, SS, FF or SF, and any lag in days. Durations and slack are turned into days using the minutes per day stored in the file, 480 when none is given. The Gantt tab draws a bar for each row with month gridlines, critical tasks in red, others in blue, milestones as purple diamonds and a darker band for the part already complete. The Structure tab shows the WBS as a tree with the date range of each item. A Resources tab lists each resource with its type, standard rate and maximum units, and an Assignments tab shows who works on which task with units and hours.

Who this is for

Clients and subcontractors reviewing a programme sent as XML, site managers without a Project licence, PMO staff checking an export from another tool, and students opening coursework plans on a Mac or Chromebook.

How to use it

1. In Project, save the plan as XML, or export XML from your planning tool. 2. Open the .xml file here. 3. Read the summary and the Tasks tab. 4. Switch to the Gantt, Structure and Resources tabs. 5. Export the plan to Excel or the tasks to CSV.

What the sample shows

The sample office-move.xml is a plan called Office move running from 2026-01-05 to 2026-02-27. The Tasks tab lists 8 rows: two summary tasks, Planning and Fit-out, five working tasks and one milestone. The summary counts 5 tasks, 1 milestone, 5 critical items and 2 resources, and the plan is 48 percent done when completion is weighted by duration. Network cabling lasts 15 days, is 60 percent complete and is assigned to the IT contractor at 2 units for 240 hours. Furniture delivery shows 3FS+10d as its predecessor, meaning it may start 10 working days after Choose movers finishes, and has 10 days of total slack. Move day is a milestone that follows both Test network and Furniture delivery, shown as 7FS, 6FS.

Exports

Excel (XLSX) writes three sheets, Tasks, Resources and Assignments, with the same columns as the tabs. Tasks CSV writes only the task table, with a byte order mark so Excel opens accented names correctly. Any table can also be copied or saved from its own tab.

Reading percent done

Done (by duration) multiplies each working task's percent complete by its duration, adds them up and divides by the total duration, leaving out summary tasks and milestones. It can differ from the percent Project shows on the project summary row, which may weigh work or cost instead.

Limits

Only the MSPDI XML format is read; binary .mpp files must first be saved as XML in Project or exported from ProjectLibre. Dates, durations, slack and the critical flag are shown exactly as stored, and nothing is rescheduled, so changing a date here is not possible and links are not recalculated. Calendars, baselines, costs, custom fields and notes are not shown, and a task with several resources lists their names without their individual units in the Tasks tab. Lag written as a percentage or in elapsed time is shown as if it were working time, so compare unusual links with the original program. The viewer reports the plan as saved and is not project management or contractual advice.

Exemple resolt

Sample Office move: 2026-01-05 to 2026-02-27, 5 tasks, 1 milestone, 5 critical, 2 resources, 48% done; Furniture delivery 3FS+10d with 10d slack.

En resum

Preguntes freqüents

Can I open an .mpp file?

Not directly. MPP is a binary format; save it as XML from Microsoft Project, or open it in ProjectLibre and export XML, then open that file here.

How is the critical path shown?

Tasks that Project marked critical have yes in the critical column and red bars in the Gantt chart. The flag is read from the file, not worked out again.

What do entries like 3FS+10d mean?

The task follows task ID 3 with a finish-to-start link and a lag of 10 working days. SS, FF and SF are the other link types.

Can I edit the plan or move dates?

No. The viewer reads the plan as saved. Use the Excel export if you need to work with the figures elsewhere.

Does it work with GanttProject or ProjectLibre exports?

Yes, as long as they are exported as Microsoft Project XML. Other GanttProject formats, such as .gan, are not read.

Why are durations in days rather than hours?

Project stores durations in hours. They are divided by the working day length in the file, normally 8 hours, to match the days shown in Project.