Layered Process Audit (LPA) Scheduler and Checklist
Set up audit layers with frequencies and auditors, keep a question bank, generate a rotating schedule, record Yes, No, Corrected or N/A on a phone, add countermeasures and follow compliance and completion trends.
S'executa al teu navegador. Els fitxers mai no surten del dispositiu. Mira com comprovar-ho
…
Com es fa
- 1Set up layers
Name each layer, choose its frequency and list the auditors.
- 2Enter areas and shifts
Add the lines or cells and the shifts the audits should cover.
- 3Build the question bank
Add questions with categories, layers and critical flags, or import a CSV.
- 4Generate the schedule
Choose the start date and number of weeks and press generate.
- 5Do the audits
Open each audit, answer every question and add countermeasures for failures.
- 6Review the trends
Check compliance, first pass, worst questions, completion by auditor and overdue actions.
Sobre aquesta eina
A layered process audit is a short, frequent check that the critical steps of a process are being done the way the standard says, carried out by people from several levels of the organisation. The first layer, usually team leaders, audits every shift. Supervisors and managers audit weekly, and the plant manager monthly, often the same questions in a different area. Because senior people walk the floor regularly and ask the same things, small drifts are caught before they become defects, and everyone sees that the standard matters. Automotive customers expect LPAs under IATF 16949, and many other manufacturers use them. This tool does the planning and record keeping. It holds your layers and auditors, a question bank tagged by layer, area and category, and a schedule generator that rotates auditors and areas fairly. On the shop floor you open the audit, tap Yes, No, Corrected or N/A for each question and add a countermeasure for anything that failed. Results roll up into weekly compliance trends, the worst questions, area and layer comparisons and auditor completion.
Layers, questions and the schedule
Each layer has a name, a frequency and a list of auditors. Daily layers get one audit per shift per working day; weekly layers get one a week, spread across different weekdays and alternating shifts; monthly layers get one in the first week of each month. Auditors and areas rotate in turn so that every manager visits every area. Questions can apply to all layers or only some; a team leader may verify error-proofing at shift start, while a manager checks that earlier countermeasures are on track. Mark the questions on critical characteristics as critical. Print a blank checklist for any layer and area if someone prefers paper on a particular day.
Compliance and completion
Compliance is the share of answered questions that passed, counting Corrected on the spot as a pass, and leaving N/A out. First-pass compliance counts only clean Yes answers, which shows how often the standard was met before anyone stepped in. Schedule completion is the share of audits due by the results date that were actually done, by auditor as well as overall: missed audits are the usual sign that an LPA system is fading. Countermeasures carry an owner, a due date and a status, and the overdue count appears at the top. For the process documents the questions check against, the turtle diagram maker and control plan builder on this site are useful companions.
Worked example
The sample covers six weeks from 5 October 2026 at a plant with two shifts and three areas. The generator creates 73 audits: 60 team leader audits, six each for supervisors and managers and one for the plant manager. By 6 November, 61 audits were due and 55 were done, so schedule completion is 90.2%. Those audits answered 341 scored questions: 325 Yes, 5 Corrected and 11 No, which gives 96.8% compliance and 95.3% first pass. The week of 19 October dipped to 93.5%, and the last week reached 98.7%. The weakest question is the 5S standard at 81.8% with 10 No answers, followed by error-proofing checks at 98%. Two countermeasures are still open and the floor markings action is overdue.
Limits
This tool plans and records audits; it is not a certification audit, a customer approval or legal advice. Your customer's own LPA requirements, such as CQI-8 or a company-specific manual, take priority over the example layers. Answers are only as honest as the auditors who give them.
Exemple resolt
Six-week sample: 73 audits scheduled, 55 of 61 due done (90.2%); compliance 96.8%, first pass 95.3%; 5S question lowest at 81.8%.
En resum
- Categoria: Negocis i feina
- S'executa al navegador, sense registre, sense pujar res.
- La informació que introdueixes es queda al dispositiu.
- Disponible en anglès.
- Contingut revisat per última vegada:
- Font oficial: AIAG CQI-8 Layered Process Audit guideline (2nd edition, 2014); IATF 16949:2016 clause 9.2.2.3
Preguntes freqüents
What is a layered process audit?
It is a short, frequent audit of critical process steps done by several levels of staff, from team leaders to the plant manager, using a standard question list. The aim is to confirm that standard work is followed every shift.
How often should each layer audit?
A common pattern is every shift for team leaders, weekly for supervisors and managers and monthly for senior leaders. Your customer or corporate manual may set other frequencies; all of them are editable.
What does Corrected mean?
The auditor found a problem and fixed it during the audit, such as replacing a missing work instruction. It counts as a pass for compliance but not for first pass, and you can still add a countermeasure to stop it recurring.
Can I use it on a phone on the shop floor?
Yes. The audit screen uses large buttons for each answer and works offline once the page is loaded. Results are saved in that browser, so export the file to merge them on another device.
Can I import my existing questions?
Yes. Import a CSV with the columns question, layers, area, category and critical. Layers are written as L1, L2 and so on, separated by spaces.
What happens when I regenerate the schedule?
The schedule and any results on it are replaced, so the tool asks first. Export a file before regenerating if you want to keep the old results.