Contractor Job Costing and Bid Calculator
Add each cost line with quantity and unit cost, set labor burden, waste, tax, overhead and contingency, price the job by markup or target margin and enter actual costs as the job runs to see the variance.
S'executa al teu navegador. Els fitxers mai no surten del dispositiu. Mira com comprovar-ho
…
Com es fa
- 1Name the job
Address or client.
- 2Add cost lines
Category, quantity, unit and unit cost.
- 3Set rates
Burden, waste, tax, overhead, contingency.
- 4Choose pricing
Markup on cost or target margin.
- 5Read the bid
Price, cost, profit, markup and margin.
- 6Track actuals
Enter actual costs as the job runs.
Sobre aquesta eina
Many small contractors lose money on jobs they thought were profitable, and the reason is usually in the arithmetic of the bid rather than the work. Labor is priced at the wage without payroll taxes and insurance, materials are priced without waste, overhead is forgotten on small jobs, and a markup of 20% is confused with a margin of 20%. This calculator puts the whole bid in one place and keeps those costs visible. You enter cost lines by category, labor, materials, subcontracts, equipment, permits and fees, or other, with a description, quantity, unit and unit cost. Labor lines get the labor burden you set, covering payroll taxes, workers compensation and benefits, and material lines get the waste allowance and sales tax. Overhead and contingency are added as a share of the direct cost, and then you choose how to price: a markup on cost or a target margin on price. The result shows the bid price, the total cost, the gross profit, and both the markup and the margin that the price represents. A markup and margin table shows the pairs for common figures so you can explain the difference to a partner or a client. As the job runs, type the actual cost on each line and the tool shows the variance, the actual cost with overhead and the profit left if nothing else is spent. The cost lines can be downloaded as CSV and the bid summary as text.
Who this is for
General contractors, remodelers and specialty trades who bid jobs from a spreadsheet or the back of an envelope, estimators who need a quick second check, and new business owners learning to price work so it pays for the truck, the office and themselves.
Labor burden
The cost of an employee is more than the hourly wage. Employer payroll taxes, workers compensation, unemployment insurance, health benefits and paid time off can add 25 to 40% or more. Put your own figure in, based on last year's payroll records.
Waste and sales tax
Cut-offs, breakage and extra fasteners mean you buy more than the plans show. The waste allowance is applied to material lines before sales tax. Some states tax materials used in real property work and others tax the finished job, so check your state.
Overhead and contingency
Overhead covers what keeps the business running: rent, vehicles, insurance, software and the owner's office time. Contingency covers the unknowns of the job itself. Both are a percentage of direct cost here; if you know a fixed overhead per job, add it as an Other line.
Markup versus margin
Markup is profit divided by cost; margin is profit divided by price. A 25% markup equals a 20% margin. If your accountant says you need a 20% gross margin, price with the margin option or use the markup the table shows.
Job costing as the work goes
Enter actual costs from invoices and timesheets on each line. The variance column shows where the estimate was low, and the bid summary shows the profit that remains, which helps you write better estimates next time.
Limits
An estimating aid, not accounting or tax advice. The figures you enter decide the result; the tool does not know local labor rates, permit fees or prices. Check your state's sales tax rules for construction and keep proper job records for your accountant.
Exemple resolt
The default kitchen remodel has 120 carpenter hours at $38, 80 helper hours at $22, $9,800 of cabinets, $1,450 of drywall and trim, an electrician, a plumber, 42 sq ft of countertops at $75, two dumpster pulls and a $650 permit. With 30% labor burden, 8% waste, 6.5% sales tax, 12% overhead and 5% contingency the total cost is $36,803.23. A 20% markup gives a bid of $44,163.87 and a 16.7% margin, while pricing for a 20% margin gives $46,004.03.
En resum
- Categoria: Negocis i feina
- S'executa al navegador, sense registre, sense pujar res.
- La informació que introdueixes es queda al dispositiu.
- Disponible en anglès.
- Contingut revisat per última vegada:
- Font oficial: Standard construction estimating practice (markup and margin)
Preguntes freqüents
What is the difference between markup and margin?
Markup is profit over cost and margin is profit over price, so the same dollar profit is a smaller margin than markup.
What labor burden should I use?
Work it out from your own payroll costs; many small contractors fall between 25% and 40%.
Should overhead go on subcontracts?
Usually yes, because managing subs takes your time, but some contractors use a lower rate on subs.
Can I use it for job costing after the bid?
Yes. Enter actual costs per line and watch the variance and remaining profit.
Does it handle change orders?
Add a line for each change order, or save a copy of the project for the revised scope.
Can I give the summary to a client?
The text summary shows categories and the total; edit it before sending if you prefer not to show markup.