Calculadora de marge del constructor i variació de preus
Enumereu cada variació amb el seu cost i estat d'aprovació, estableix el vostre marge, i veure els preus de la variació, GST i el nou total del contracte.
S'executa al teu navegador. Els fitxers mai no surten del dispositiu. Mira com comprovar-ho
…
Com es fa
- 1Introduir el contracte
Escriu la suma original del contracte.
- 2Marge
Escriu el marge per a les variacions.
- 3Variations de la llista
Escriu cada un com a número, descripció, cost i aprovats sí o no.
- 4Llegeix el registre
Veure preus, GST, estat i la nova suma del contracte.
- 5Obtenir la signatura off
Enviar les variacions pendents al propietari per a la seva aprovació escrita.
Sobre aquesta eina
Variations are changes to the work in a building contract: an upgraded benchtop, extra power points, rock found during excavation, or an item the owner deletes. They are one of the main causes of disputes between builders and owners. Home building laws in every state require variations to be in writing, with a description and price, and agreed by the owner before the work is done, with limited exceptions. Builders usually add a margin to the cost of a variation to cover overheads and profit, often 15 to 25%, and then GST at 10%. This calculator prices each variation with your margin and GST, keeps a register showing which are approved and which are still pending, works out the adjusted contract sum, and shows how much the variations have changed the original price.
Who this is for
Builders, renovators and trade contractors who price variations, and home owners who want to check variation claims.
How a variation is priced
Variation price = cost of labour and materials × (1 + margin) + GST at 10%. For a credit, such as a deleted item, the cost is entered as a negative number and no margin is added, though contracts can say otherwise. Your contract may set the margin for variations; use that figure.
Entering variations
Write one variation per line: number, description, cost excluding GST and margin, and whether the owner has approved it (yes or no). For example, `V1, Upgrade benchtop to stone, 4200, yes`.
The register
The table shows each variation's cost, the price after margin, the GST and the total, with its status. The summary gives: - the original contract sum including GST, - approved variations, - the new contract sum, - pending variations still to be agreed, - the percentage change from the original price, - the margin earned on approved variations.
Getting variations right
- Put every variation in writing before the work, with a description, price and any change to the completion date. - Get the owner's signature or written approval. - Number variations and keep a running register. - Include variations in progress claims only once approved. Some states set rules for variations required by an authority or emergency, and some limit when a builder can claim for work done without a signed variation.
For owners
Ask for the cost breakdown and the margin used. Compare the price with what you would pay for the item separately. Check whether a variation also extends the completion date.
Worked example
On a A$385,000 contract including GST, with a 20% margin: an upgraded stone benchtop at A$4,200 cost, six extra power points at A$780 and a garden shed deleted for a A$2,400 credit add A$3,934 to the contract, a 1.0% increase. Rock excavation at A$6,500 cost (A$8,580 with margin and GST) is pending.
Limits
An estimate, not legal advice. Your contract terms and your state's home building laws decide how variations must be made and paid.
Exemple resolt
Tres variacions aprovades afegeixen 3.934 dòlars australians a un contracte de 385.000; una per valor de 8.580 està pendent.
En resum
- Categoria: Negocis i feina
- S'executa al navegador, sense registre, sense pujar res.
- La informació que introdueixes es queda al dispositiu.
- Disponible en anglès.
- Contingut revisat per última vegada:
- Font oficial: Home building laws in each state (for example Home Building Act 1989 NSW, Domestic Building Contracts Act 1995 Vic) require variations to be in writing and agreed before the work; GST at 10% applies to taxable supplies (A New Tax System (Goods and Services Tax) Act 1999)
Preguntes freqüents
Com fan els constructors les variacions de preus?
Cost més un marge, sovint del 15 al 25%, més GST.
Les variacions han de ser per escrit?
Sí, les lleis de construcció d'habitatges en cada estat requereixen variacions escrites en la majoria dels casos.
Es suma el GST a les variacions?
Sí, al 10% per a un constructor registrat.
Com es maneixen els elements eliminats?
Com a crèdit, introduir un cost negatiu.
Pot un constructor cobrar per variacions no signades?
Sovint no, o només en casos limitats; comproveu la llei del vostre estat.
S'emmagatzemen les meves dades?
Només en el teu navegador.
