Block and Beam Floor Calculator

Enter each bay's clear span and width, set beam and block sizes and bearing, and get beams, blocks, topping quantities, cost and a plan.

S'executa al teu navegador. Els fitxers mai no surten del dispositiu. Mira com comprovar-ho

…

Com es fa

  1. 1
    Add bays

    Enter each room or bay with its clear span and width.

  2. 2
    Mark doubled beams

    Add the number of extra beams under partition walls.

  3. 3
    Set sizes

    Open Beam, block and topping sizes for beam width, block size, bearing and increments.

  4. 4
    Check the plan

    Open Drawing and pick a bay to see beam positions and any cut course.

  5. 5
    Enter prices

    Type beam, block, insulation, membrane, screed, grout and labour rates.

  6. 6
    Print the schedule

    Print the beam schedule and materials list or export the CSV.

Sobre aquesta eina

Beam and block floors are a quick way to build a suspended ground floor or an upper floor: precast prestressed concrete beams span between the walls, and concrete blocks are dropped in between them, then the floor is grouted and finished with insulation and screed or a structural topping. Ordering is a matter of counting beams of the right length and the blocks that fill the gaps, but the layout rules make that tricky to do in your head. This calculator lets you list each bay or room with its clear span, the direction the beams run, and its width along the supporting walls. The beams sit at a pitch of one beam width plus one block length, with a block course against each wall. You can add doubled beams under partition walls. The tool rounds each beam up from the clear span plus bearing at both ends to the supply increment, counts the blocks in every gap, and flags a cut course when the last gap is narrower than a block. It then adds insulation, a membrane with laps, screed or topping volume and joint grout, all priced from your list. The Drawing tab shows the beam layout of each bay.

The layout rule

Starting from one wall, a row of blocks bears on the wall, then a beam, then a row of blocks, and so on. The number of beams is the smallest that covers the width once the first block course is placed. Whatever width is left after the last beam is filled with blocks, cut to fit when it is less than a full block. Each beam needs a bearing on both supporting walls, often 100 mm, and beams are supplied in fixed length steps.

Quantities

Blocks per gap are the span divided by the block width along the beam, rounded up. Insulation and membrane cover the floor area with waste and laps. Screed volume is the area times the thickness. Grout is a weight per square metre that you can match to the supplier's figure.

Limits

Beam type, size, spacing, doubled beams and bearing must come from the floor supplier's design, which accounts for loads, spans, openings and partitions. This tool only counts parts for budgeting and does not check strength, deflection, ventilation of the void below a ground floor or building regulations.

Exemple resolt

A house extension in metric: a kitchen and dining bay with a 4.2 metre span and 6.6 metres of width plus one doubled beam, a 2.4 by 2.9 metre utility and a 3.6 by 1.9 metre hall. With 155 mm beams, 440 mm blocks, 100 mm bearing and 100 mm length steps, the kitchen needs 11 beams at 595 mm centres plus one doubled, each 4.4 metres long, and 240 blocks with a 55 mm cut course. The whole floor of 41.5 square metres needs 20 beams totalling 77.2 metres, 399 blocks with waste, 44 square metres of insulation, 2.8 cubic metres of screed and 250 kg of grout. At the sample pound rates the estimate is about £3,780 including 7.5 percent contingency and VAT.

En resum

Preguntes freqüents

What span can a beam and block floor achieve?

Standard house beams commonly span up to about 4.5 to 6 metres depending on beam depth and load. The supplier's span tables give the right beam.

Which way should the beams run?

Usually across the shorter dimension, from one load-bearing wall to the opposite one. Enter that distance as the clear span.

Why are some beams doubled?

A partition wall built on the floor puts a line load on it, so two beams side by side are often placed under it. The supplier marks these on the layout drawing.

What is a cut course?

When the last gap is narrower than a block, blocks are cut to fill it, or a slip block is used. The tool shades that strip in the drawing and counts those blocks.

Do I need screed on top?

Ground floors usually get insulation and a screed or a floating board finish; upper floors may need a structural topping. Follow the supplier's specification.

Does the tool upload my floor plan?

No. The bays, layout and costs are computed in your browser and remain on this device.

Totalment gratisSense cost, sense registre
Els fitxers es mantenen privatsTot funciona al teu navegador
Fàcil en el teu idiomaDisponible en molts idiomes