Bar Bending Schedule (BBS) Calculator
Build a printable BBS sheet member by member: bar marks, shapes, cutting lengths with hooks and bends, counts from spacing, weight by diameter and 12 m bars to order.
S'executa al teu navegador. Els fitxers mai no surten del dispositiu. Mira com comprovar-ho
…
Com es fa
- 1Name the project
Type the project or drawing name that will head the printout.
- 2Add members
Pick beam, column, slab or footing, enter its sizes and add its bars.
- 3Check each row
Edit shapes, diameters, dimensions, counts, hooks and laps against the drawing.
- 4Set the rules
Adjust bend deductions, hook and lap lengths, wastage, stock length and rate.
- 5Read the totals
See weight by diameter, stock bars to order and the steel cost.
- 6Print the BBS
Print the schedule, export CSV or save the project.
Sobre aquesta eina
On a building site the bar bending schedule is the document that turns the structural drawings into steel: which bars, how many, cut to what length, bent to what shape and weighing how much. Contractors use it to order steel and pay the bar bender, site engineers use it to check the cage before the concrete pour, and owners use it to see where the steel money goes. Doing it by hand in a spreadsheet is slow and errors in a single bend deduction repeat across hundreds of bars. This calculator keeps the whole schedule in one editable table. Each row is a bar mark with its member, shape (straight, L-bar, U-bar, rectangular stirrup or tie, 45° cranked bar, circular ring or a typed length), diameter, number of identical members, and either a bar count or a run length and spacing from which the count is worked out as run ÷ spacing + 1. The cutting length follows the common site rules based on IS 2502: the straight lengths, plus hooks of 9 bar diameters, plus stirrup hooks of 10 diameters, minus bend deductions of 1, 2 and 3 diameters for 45°, 90° and 135° bends, plus any laps; every rule is editable to match your engineer's notes. Templates fill rows from the main sizes of a beam, column, slab or footing so you start with a sensible cage and correct it against the drawing. The summary adds up length and weight for each diameter using d²/162 kg per metre, adds wastage, counts the 12-metre stock bars to order and prices the steel.
Cutting length in practice
A bent bar is shorter along its centre line than the sum of its outside dimensions, because the bend rounds the corner. That is why bend deductions are subtracted: about one diameter for a 45° bend, two for 90° and three for 135°. Hooks add length: a standard 180° hook is often taken as 9d and a 135° seismic stirrup hook as 10d. Cranks in slab bars add 0.42 times the crank depth for each 45° crank.
Weight of steel bars
A steel bar's mass per metre is π/4 × d² × 7,850 kg/m³, which works out to d²/162 kg/m with d in millimetres: 8 mm = 0.395, 10 mm = 0.617, 12 mm = 0.889, 16 mm = 1.58 and 20 mm = 2.47 kg/m. Steel is sold by weight, so this is what turns the schedule into money.
Limits
This tool calculates quantities; it does not design reinforcement. Bar sizes, spacing, laps, anchorage and cover must come from a qualified structural engineer's drawings and the codes in force where you build. The templates use simple, typical detailing and will not match every drawing; always edit them. Real cutting lists also depend on how bars are cut from stock lengths, which can add waste beyond the percentage set here.
Exemple resolt
Four beams with a 4 m clear span, 230 × 450 mm section and 25 mm cover get three 16 mm bottom bars and two 12 mm top bars, bent into the supports, and 8 mm stirrups at 150 mm. The 16 mm bars cut to 4,550 + 2 × 400 − 2 × 2 × 16 = 5,286 mm, and the twelve bars weigh 100.2 kg. Each beam needs 4,000 ÷ 150 + 1 = 27 stirrups cut to 1,224 mm, 108 in all weighing 52.2 kg. The schedule totals 190.2 kg; with 3 percent wastage the order is 195.9 kg, or six 12 m bars of 16 mm, four of 12 mm and twelve of 8 mm, costing 13,711 at 70 per kg.
En resum
- Categoria: Llar i vida
- S'executa al navegador, sense registre, sense pujar res.
- La informació que introdueixes es queda al dispositiu.
- Disponible en anglès.
- Contingut revisat per última vegada:
- Font oficial: BIS IS 2502:1963 Code of practice for bending and fixing of bars for concrete reinforcement
Preguntes freqüents
What is a bar bending schedule?
It is a table listing every reinforcement bar in a structure by bar mark, with its shape, diameter, number, cutting length and weight. It is used to cut and bend bars on site, check the steel before concreting and estimate the steel quantity and cost.
How do I calculate the cutting length of a stirrup?
Add the four inside sides, add two hook lengths and subtract the bend deductions: for a 180 × 400 mm stirrup of 8 mm bar, 2 × (180 + 400) + 2 × 10 × 8 − 3 × 2 × 8 − 2 × 3 × 8 = 1,224 mm. Use dimensions after deducting cover.
What is the formula for steel weight per metre?
Weight in kg per metre = d² ÷ 162, with d the bar diameter in millimetres. A 12 mm bar weighs 144 ÷ 162 = 0.889 kg per metre, so a 12 m length weighs about 10.7 kg.
How many bars are needed at a given spacing?
Divide the length over which the bars are spread by the spacing and add one: 3,560 mm at 150 mm spacing gives 23 + 1 = 24 bars. Use the clear length after cover, and round down before adding one.
What bend deduction values should I use?
A common site rule is 1d for 45°, 2d for 90°, 3d for 135° and 4d for 180° bends. Some offices use other values; change them in the Rules panel and every cutting length updates.
Can I print the BBS and share it?
Yes. Print or save as PDF for the bar bender, export CSV for a spreadsheet, or save the project file to continue later. The schedule is also kept in this browser automatically.