Calculadora de Margem do Construtor e Preços Variáveis
Lista cada variação com o seu custo e status de aprovação, defina a sua margem e veja os preços da variação, GST e total do novo contrato.
Roda no seu navegador. Seus arquivos nunca saem do seu dispositivo. Veja como conferir
…
Como fazer
- 1Inscreva-se no contrato
Digite o montante original do contrato.
- 2Configure a margem
Digitar a margem para variações.
- 3Variações da lista
Escreva cada um como número, descrição, custo e aprovado sim ou não.
- 4Leia o registo .
See prices, GST, status and the new contract sum.
- 5- Sim , sim .
Enviar as variações pendentes ao proprietário para aprovação por escrito.
Sobre esta ferramenta
Variations are changes to the work in a building contract: an upgraded benchtop, extra power points, rock found during excavation, or an item the owner deletes. They are one of the main causes of disputes between builders and owners. Home building laws in every state require variations to be in writing, with a description and price, and agreed by the owner before the work is done, with limited exceptions. Builders usually add a margin to the cost of a variation to cover overheads and profit, often 15 to 25%, and then GST at 10%. This calculator prices each variation with your margin and GST, keeps a register showing which are approved and which are still pending, works out the adjusted contract sum, and shows how much the variations have changed the original price.
Who this is for
Builders, renovators and trade contractors who price variations, and home owners who want to check variation claims.
How a variation is priced
Variation price = cost of labour and materials × (1 + margin) + GST at 10%. For a credit, such as a deleted item, the cost is entered as a negative number and no margin is added, though contracts can say otherwise. Your contract may set the margin for variations; use that figure.
Entering variations
Write one variation per line: number, description, cost excluding GST and margin, and whether the owner has approved it (yes or no). For example, `V1, Upgrade benchtop to stone, 4200, yes`.
The register
The table shows each variation's cost, the price after margin, the GST and the total, with its status. The summary gives: - the original contract sum including GST, - approved variations, - the new contract sum, - pending variations still to be agreed, - the percentage change from the original price, - the margin earned on approved variations.
Getting variations right
- Put every variation in writing before the work, with a description, price and any change to the completion date. - Get the owner's signature or written approval. - Number variations and keep a running register. - Include variations in progress claims only once approved. Some states set rules for variations required by an authority or emergency, and some limit when a builder can claim for work done without a signed variation.
For owners
Ask for the cost breakdown and the margin used. Compare the price with what you would pay for the item separately. Check whether a variation also extends the completion date.
Worked example
On a A$385,000 contract including GST, with a 20% margin: an upgraded stone benchtop at A$4,200 cost, six extra power points at A$780 and a garden shed deleted for a A$2,400 credit add A$3,934 to the contract, a 1.0% increase. Rock excavation at A$6,500 cost (A$8,580 with margin and GST) is pending.
Limits
An estimate, not legal advice. Your contract terms and your state's home building laws decide how variations must be made and paid.
Exemplo prático
Três variações aprovadas somam A$3.934 a um contrato de A$385.000; uma por valor de A$8.580 está pendente.
Resumo rápido
- Categoria: Negócios e trabalho
- Funciona no seu navegador, sem cadastro e sem envio de arquivos.
- O que você digita fica no seu dispositivo.
- Disponível em inglês.
- Conteúdo revisado pela última vez:
- Fonte oficial: Home building laws in each state (for example Home Building Act 1989 NSW, Domestic Building Contracts Act 1995 Vic) require variations to be in writing and agreed before the work; GST at 10% applies to taxable supplies (A New Tax System (Goods and Services Tax) Act 1999)
Perguntas frequentes
Como é que os construtores fazem variações de preços?
Cost plus a margin, often 15 to 25%, plus GST.
As variações têm de ser por escrito?
Sim, as leis de construção em todos os estados exigem variações escritas na maioria dos casos.
O GST é acrescentado às variações?
Sim, a 10% para um construtor registrado.
Como são tratados os itens apagados?
Como crédito; insira um custo negativo.
Um construtor pode cobrar por variações não assinadas?
Muitas vezes não, ou apenas em casos limitados; verifique a lei do seu estado.
Os meus dados estão guardados?
Só no teu navegador.